    • 1. 发明授权
    • Oil and gas well stimulation
    • 油气井刺激
    • US4039030A
    • 1977-08-02
    • US700094
    • 1976-06-28
    • Charles S. GodfreyE. T. Moore, Jr.Douglas M. Mumma
    • Charles S. GodfreyE. T. Moore, Jr.Douglas M. Mumma
    • E21B43/263E21B43/26
    • E21B43/263
    • A method and means for stimulating oil and gas wells to increase production comprises filling a well above the pay zone level with a fracturing fluid, then suspending a cylinder of high explosive centrally within the wellbore adjacent to the pay zone. Thereafter a propellant is suspended within tens of feet above the high explosive and the well above the propellant is enclosed. The application of high explosive is chosen to cause multiple radiating fractures but will not crush the rock in the well. Also, the rise time of the shock wave created by the explosive should be less than the time required for sound to traverse one-half of the periphery of the well opening in the rock at the pay zone. The propellant is detonated first, followed by the detonation of the high explosive. The purpose of using the propellant is to maintain pressure caused by the high explosive over a longer period, thereby extending the fractures caused by the high explosive.
    • 用于刺激油气井以增加生产的方法和手段包括用压裂液填充高于工矿区水平的井,然后在靠近工矿区的井筒内部将高爆炸气瓶中心地悬挂在井眼内。 此后,推进剂悬挂在高爆炸物上方几十英尺内,并且推进剂上方的井被封闭。 选择高爆炸物的应用可引起多次辐射裂缝,但不会破坏井中的岩石。 此外,由爆炸物产生的冲击波的上升时间应小于声音穿过工作区岩石开孔周边的一半所需的时间。 推进剂首先引爆,然后引爆高爆炸物。 使用推进剂的目的是在较长时间内保持高爆炸物引起的压力,从而延长高爆炸造成的裂缝。