会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明授权
    • Electrostatic discharge failure avoidance through interaction between floorplanning and power routing
    • 通过布局规划和电源布线之间的相互作用来避免静电放电故障
    • US07496877B2
    • 2009-02-24
    • US11202275
    • 2005-08-11
    • Andrew D. HuberCiaran J. BrennanPaul E. DunnScott W. GouldLin LinErich C. Schanzenbach
    • Andrew D. HuberCiaran J. BrennanPaul E. DunnScott W. GouldLin LinErich C. Schanzenbach
    • G06F17/50
    • G06F17/5068
    • An integrated system and method to achieve ESD robustness on an integrated circuit (IC) in a fully automated ASIC design environment is described. Electrical characteristics and electrical limits on the power network are translated to power route region constraints for each chip input/output (I/O) cell. Electrical limits on the signal network are translated into signal route region constraints for each chip I/O cell. These constraints are passed on to an I/O floorplanner (automatic placer of I/O cells) that analyzes trade-offs between these constraints. For I/O cells that can not be placed to satisfy both power and signal region constraints, the I/O floorplanner utilizes the knowledge of alternative power distribution structures to group I/Os and create local power grid structures that have the effect of relaxing the power region constraints. Instructions for creating these local power grid structures are passed on to the automatic power routing tool.
    • 描述了在完全自动化ASIC设计环境中实现集成电路(IC)上ESD稳定性的集成系统和方法。 电力网络上的电气特性和电气限制被转换为每个芯片输入/输出(I / O)单元的功率路由区域约束。 信号网络上的电气限制被转换为每个芯片I / O单元的信号路由区域约束。 这些约束被传递到分析这些限制之间的权衡的I / O平面布局(I / O单元的自动放置器)。 对于不能放置以满足功率和信号区域约束的I / O单元,I / O平面布置器利用替代功率分配结构的知识来分组I / O,并创建具有放松效果的局部电网结构 功率区域约束。 创建这些局部电网结构的说明将传递给自动电力布线工具。
    • 9. 发明授权
    • Automatic DCS routing for multilayer packages to minimize coupled noise
    • 用于多层封装的自动DCS布线,以最小化耦合噪声
    • US5519632A
    • 1996-05-21
    • US43074
    • 1993-04-05
    • Hai H. ChenLing-Hui HaoPhilip S. HonsingerAndrew D. HuberThomas J. LaveryShuhui Lin
    • Hai H. ChenLing-Hui HaoPhilip S. HonsingerAndrew D. HuberThomas J. LaveryShuhui Lin
    • H01L21/82G06F17/50H01L23/12
    • G06F17/5077
    • A routing method for differential current switch (DCS) pairs initially shortens the min/max length window for a first routed rail in order to increase the likelihood that length of the second rail will fall within the window. Next, the routing domain for the first rail is modified so that the first pin exit direction to the route is toward the second pin of the differential current switch pair. A suitable algorithm, such as a prior art mazerouter algorithm, is used to route the first rail along a path restricted to the routing domain. At each proposed via connection for connecting the first rail route from one plane to another, the program accepts the proposed via connection only if there is an available adjacent via for routing the second via. If a via for routing the second rail is not available, the proposed route for the first rail is rejected.
    • 用于差分电流开关(DCS)对的布线方法最初缩短了第一路由轨道的最小/最大长度窗口,以便增加第二轨道的长度将落入窗口内的可能性。 接下来,对第一轨道的路由域进行修改,使得到路由的第一引脚出口方向朝向差动电流开关对的第二引脚。 使用诸如现有技术的mazerouter算法的合适的算法来沿着限制到路由域的路径来路由第一轨。 在每个提出的通路连接中,用于将第一轨道从一个平面连接到另一个平面,仅当存在用于路由第二通道的可用相邻通孔时,程序接受所提出的通路连接。 如果用于路由第二条铁轨的通道不可用,则第一条铁路的建议路线被拒绝。