会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • ES2084663T3
    • 1996-05-16
    • ES90310651
    • 1990-09-28
    • CSIR
    • MARSH MICHAEL JOHN CAMILLEATKINS RAYMOND CATHERALLHODSON TREVOR MEREDITH
    • F42D1/055F42D1/05
    • The invention relates to a blasting apparatus (10) for activating a plurality of electrical detonators (18) after predetermined time delays. The blasting apparatus includes a plurality of remote electrical delay devices (16.1...16.6). Each device is linked to a detonator (18), and is arranged to be serially programmed with a timing signal, which originates from a central control unit (12) and which determines the time delay. A bidirectional signal harness (14), having ends which terminate at I/O ports (20,22) in the control units (12), serially links the delay devices to the control unit (12). In the event of a fault (27) or discontinuity occurring in the harness prior (14) to programming of the delay devices (16.1...16.6), the discontinuity (27) is detected and the direction of programming along the bidirectional harness (14) is reversed so that those delay devices (16.4,16.5,16.6) which, due to the break (27), cannot be programmed in the initial direction (24), are programmed with timing signals travelling along the signal line in the opposite direction (26). The invention extends to a method of activating a plurality of electrical detonators (18), as well as to the individual delay devices (16.1...16.6) forming part of the blasting apparatus (10).
    • 4. 发明专利
    • Timing apparatus
    • AU657217B2
    • 1995-03-02
    • AU3846493
    • 1993-05-07
    • CSIR
    • MARSH MICHAEL JOHN CAMILLEATKINS RAYMOND CATHERALLHODSON TREVOR MEREDITH
    • F42D1/055
    • The invention relates to a blasting apparatus (10) for activating a plurality of electrical detonators (18) after predetermined time delays. The blasting apparatus includes a plurality of remote electrical delay devices (16.1...16.6). Each device is linked to a detonator (18), and is arranged to be serially programmed with a timing signal, which originates from a central control unit (12) and which determines the time delay. A bidirectional signal harness (14), having ends which terminate at I/O ports (20,22) in the control units (12), serially links the delay devices to the control unit (12). In the event of a fault (27) or discontinuity occurring in the harness prior (14) to programming of the delay devices (16.1...16.6), the discontinuity (27) is detected and the direction of programming along the bidirectional harness (14) is reversed so that those delay devices (16.4,16.5,16.6) which, due to the break (27), cannot be programmed in the initial direction (24), are programmed with timing signals travelling along the signal line in the opposite direction (26). The invention extends to a method of activating a plurality of electrical detonators (18), as well as to the individual delay devices (16.1...16.6) forming part of the blasting apparatus (10).