    • HAT-SHAPED STEEL SHEET PILE
    • PH12020500110A1
    • 2020-09-14
    • PH12020500110
    • 2020-01-15
    • NIPPON STEEL CORP
    • TAKENO MASAKAZUHARATA NORIYOSHITAENAKA SHINJIKITAHAMA MASASHI
    • E02D5/04
    • A hat-shaped steel sheet piling 1 that extends in a longitudinal direction and that constitutes a wall by a plurality of same being disposed wherein: the relationship per 1 m length in the width direction of the hat-shaped steel sheet piling 1 between the cross-sectional area A (cm2/m) and the cross-sectional second moment of area I (cm4/m) about a cross section center of gravity line M extending in the width direction in the plan view seen from the longitudinal direction of the hat-shaped steel sheet piling 1 satisfies formula (1); and formula (2A) and formula (2B), formula (3A) and formula (3B), formula (4A) and formula (4B), or formula (5A) and formula (5B) are satisfied with D1 (mm) as the distance between the cross section center of gravity line M and a first intersection point P1 of extension lines for each of a pair of flanges 11 on the plan view, and D2 (mm) as the distance between second intersection points P2 where the cross section center of gravity line M intersects each of the pair of flanges 11. (1): A [ 0.00252I + 94.4 (2A): 262.6 [ D1 [ 281.0 (3A): 496.9 [ D1 [ 520.9 (4A): 621.5 [ D1 [ 650.9 (5A): 625.2 [ D1 [ 654.8 (2B): 484.0 [ D2 [ 499.0 (3B): 474.0 [ D2 [ 489.0 (4B): 476.0 [ D2 [ 491.0 (5B): 474.0 [ D2 [ 489.0
    • 9. 发明专利
    • Reinforcement structure of steel structure and reinforcement method of the same
    • 钢结构的加固结构及其加固方法
    • JP2012202194A
    • 2012-10-22
    • JP2011071074
    • 2011-03-28
    • Nippon Steel CorpTokyo Institute Of TechnologyMetropolitan Expressway Co Ltd国立大学法人東京工業大学新日本製鐵株式会社首都高速道路株式会社
    • MIKI SENJUDOBASHI HIROSHIWAKABAYASHI NOBORUHONMA KOJITAKENO MASAKAZU
    • E01D1/00E01D2/02E01D21/00E01D22/00
    • PROBLEM TO BE SOLVED: To provide a reinforcement structure and a reinforcement method of a steel structure which can be arranged without interfering with a vertical stiffener and avoid stress concentration at a welding junction of the vertical stiffener and a horizontal plane member.SOLUTION: In a reinforcement structure of a steel structure which is made by a vertical plane member 2 being provided to a bottom face of a horizontal plane member 1 integrally by welding and a vertical stiffener 3 being welded to be fixed to the vertical plane member 2 or to both the vertical and the horizontal plane members 2, 1 a reinforcing fitting 5 is disposed which includes a pair of longitudinal side plates 7 for surrounding a horizontal periphery of a top end of the vertical stiffener 3 with keeping a clearance against front and rear faces of the vertical stiffener 3 and a curved connecting plate 6, whose cross section is U-shaped or arc-shaped, for connecting each of the longitudinal side plate 7 together, top ends of each of the longitudinal side plate 7 and the curved connecting plate 6 of the reinforcing fitting 5 are welded to be fixed to the horizontal plane member 1, and each of the longitudinal side plate 7 and the vertical plane member 2 are joined by welding or bolting.
    • 要解决的问题:提供钢结构的加强结构和加强方法,该钢结构可以布置成不干扰垂直加强件,并避免垂直加强件和水平面构件的焊接接合处的应力集中。 解决方案:在由垂直平面构件2制成的钢结构的加强结构中,垂直平面构件2通过焊接一体地设置在水平面构件1的底面上,垂直加强件3被焊接以固定到垂直 平面构件2或垂直和水平面构件2,1均设置有加强配件5,该加强配件5包括一对纵向侧板7,用于围绕垂直加强件3的顶端的水平周边保持间隙 纵向加强件3的前后表面和横截面为U形或弧形的弯曲连接板6,用于将纵向侧板7中的每一个连接在一起,每个纵向侧板7的顶端和 焊接加强配件5的弯曲连接板6以固定在水平面构件1上,并且纵向侧板7和垂直面构件2中的每一个通过焊接或bo lting。 版权所有(C)2013,JPO&INPIT
    • 10. 发明专利
    • Floor slab bridge and method for constructing the same
    • 地板桥及其构造方法
    • JP2010209621A
    • 2010-09-24
    • JP2009058742
    • 2009-03-11
    • Nippon Steel Corp新日本製鐵株式会社
    • TAKENO MASAKAZUHONMA KOJIIWAO NAOKI
    • E01D15/133E01D1/00E01D2/04E01D19/12
    • PROBLEM TO BE SOLVED: To provide a floor slab bridge which dispenses with a concrete filling operation or a welding operation on a job site, and a method for constructing the floor slab bridge.
      SOLUTION: A plurality of rectangular steel tubes 4 which are elongated in the direction of a bridge axis and have openings 9 formed at a lateral surface are arranged in parallel in a direction perpendicular to the bridge axis; bearing members 2 are arranged inside lateral surfaces of the rectangular steel tubes 4 in such a manner as to overhang into the openings 9, and detachably integrated together by means of bolts 11 which are arranged in an inserted state across respective web plates 8 of the adjacent rectangular steel tubes 4 and the bearing members 2; a rod-like member 3 is arranged in a penetrating manner across the openings 9 of the respective rectangular steel tubes 4 and rod-like member supporting openings 22 of the bearing members 2; and the rod-like member 3 is supported by the openings 22, so that a shear key can be constituted in the direction perpendicular to the bridge axis. Additionally, in the method for constructing the floor slab bridge 1, the bearing member 2 is arranged in the rectangular steel tube 4.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种在作业现场进行混凝土填充操作或焊接操作的地板桥,以及用于构造地板桥的方法。 解决方案:沿着桥轴方向延伸并且在侧面形成有开口9的多个矩形钢管4在垂直于桥轴线的方向上平行布置; 轴承构件2以矩形钢管4的侧面布置成突出到开口9中,并且通过螺栓11可拆卸地集成在一起,螺栓11以插入状态布置在相邻的腹板8上 矩形钢管4和轴承构件2; 棒状构件3穿过各个矩形钢管4的开口9和支承构件2的杆状构件支撑孔22布置。 并且杆状构件3被开口22支撑,使得剪切键可以在垂直于桥轴线的方向上构成。 另外,在构成地板桥梁1的方法中,轴承构件2配置在矩形钢管4中。(C)2010,JPO&INPIT