会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明申请
    • Alignment system for communications
    • 通讯对齐系统
    • US20060003701A1
    • 2006-01-05
    • US10881568
    • 2004-06-30
    • Bassel DaoudIvan PawlenkoRichard Schwartz
    • Bassel DaoudIvan PawlenkoRichard Schwartz
    • H04B1/00H04B15/00
    • H04B10/1121
    • An alignment mechanism for establishing line-of-sight alignment between a transmitter (100) and a receiver (102) has, a laser pointer (300) that emanates a laser beam along a line-of-sight to illuminate the receiver (102) with a bright spot. An unmodulated reflector (304) at the receiver (102) reflects the emanated laser beam for return path transmission toward the laser pointer (300) to confirm alignment of the line-of-sight with the receiver (102). The transmitter (100) is aligned substantially along the line-of-sight and is fixed in position. A shutter in the form of a chopping wheel (400) modulates the emanated laser beam. The receiver (102) is linked to a communications apparatus (500) having an external antenna (502).
    • 用于在发射器(100)和接收器(102)之间建立视线对准的对准机构具有:沿着视线发出激光束以照亮接收器(102)的激光指示器(300) 有一个亮点。 在接收器(102)处的未调制的反射器(304)反射发射的激光束用于朝向激光指示器(300)的返回路径传输,以确认视线与接收器(102)的对准。 发射器(100)基本上沿着视线对准并且被固定就位。 切割轮(400)形式的快门调制发射的激光束。 接收器(102)链接到具有外部天线(502)的通信设备(500)。
    • 5. 发明申请
    • Systems and methods for managing cost reduction projects to increase cost savings for replacement subcomponents
    • 管理降低成本的项目的系统和方法,以增加替换子组件的成本节约
    • US20070226092A1
    • 2007-09-27
    • US11376914
    • 2006-03-16
    • Bassel DaoudChristopher Wiese
    • Bassel DaoudChristopher Wiese
    • G07F19/00
    • G06Q30/06G06Q40/12
    • A technique for managing cost reduction projects which reduces costs of an assembled product is described. The assembled product includes a plurality of subcomponents. The technique includes determining a best of the best (BOB) assembled product containing least cost subcomponents and ensuring that the total cost of the BOB assembled product is less than or equal to a market based target cost of the assembled product. The market based target cost is a cost at a point in time in the future which takes into account a profit margin of the assembled product. The technique also includes receiving forecast data for the plurality of subcomponents composing the assembled product and calculating cost savings for each of the least cost components introduced into the assembled product utilizing the forecast data. Each least cost component introduced into the assembled product defines a cost reduction project. The technique also includes ordering the cost reduction projects according to their corresponding calculated cost savings.
    • 描述了降低组装产品成本的降低成本的项目的技术。 组装的产品包括多个子部件。 该技术包括确定包含最低成本子部件的最佳(BOB)组装产品,并确保BOB组装产品的总成本小于或等于组装产品的基于市场的目标成本。 基于市场的目标成本是未来某个时间点的成本,考虑到组合产品的利润率。 该技术还包括接收构成组装产品的多个子组件的预测数据,并且利用预测数据计算引入组装产品的每个最低成本组件的成本节约。 组装产品中引入的每个最低成本组件都定义了一个降低成本的项目。 该技术还包括根据相应的计算成本节省订购成本削减项目。
    • 7. 发明授权
    • Cable guide
    • 电缆导轨
    • US06463728B1
    • 2002-10-15
    • US09644617
    • 2000-08-23
    • Bassel Daoud
    • Bassel Daoud
    • F16G1316
    • F16G13/16H02G11/006
    • A cable guide and trough device for preventing the over-bending of cables, fibers, and/or wires generally comprises a plurality of links each having a base and a pair of opposing sidewalls defining a passageway for guiding the cables. The links are connected at pivots located at the ends of the links to permit rotation of the links about an axis perpendicular to the base. This rotation is limited by the abutment of the respective sidewalls of adjacently connected links. Preferably, the sidewalls are bowed into the passageway so that a substantially smooth inner curve is achieved when the device is fully flexed.
    • 用于防止电缆,纤维和/或电线的过度弯曲的电缆引导和槽装置通常包括多个连接件,每个连接件具有底座和一对相对的侧壁,该侧壁限定用于引导电缆的通道。 连杆连接在位于连杆端部的枢轴处以允许连杆围绕垂直于底座的轴线旋转。 该旋转受相邻连接链节的相应侧壁的邻接的限制。 优选地,侧壁弯曲到通道中,使得当装置完全弯曲时实现基本上平滑的内部曲线。
    • 9. 发明申请
    • Systems and methods for selecting a least cost technology
    • 选择最低成本技术的系统和方法
    • US20070219930A1
    • 2007-09-20
    • US11376798
    • 2006-03-16
    • Bassel DaoudChristopher Wiese
    • Bassel DaoudChristopher Wiese
    • G06F17/00
    • G06Q30/0283G06Q10/06
    • Techniques for determining a business case for selecting a least cost technology are described. To this end, forecast sales data of one or more configurations of an assembled product is received. Usage factors of a plurality of subcomponents composing the assembled product are also received. A usage factor may suitably correspond to a combination of subcomponents to meet a configuration of the assembled product for one of the plurality of technologies. Cost data for subcomponents composing the plurality of technologies is also received. A technology cost for each of the plurality of technologies according to the forecast sales data of one or more configurations of the assembled product is calculated to define the business case for selecting the least cost technology.
    • 描述用于确定用于选择最低成本技术的商业案例的技术。 为此,接收组装产品的一个或多个配置的预测销售数据。 也接收组成产品的多个子部件的使用系数。 使用因素可以适当地对应于子组件的组合,以满足用于多种技术之一的组装产品的配置。 还收到了构成多种技术的子部件的成本数据。 计算出根据组装产品的一个或多个配置的预测销售数据的多个技术中的每个技术的技术成本,以定义用于选择最低成本技术的商业案例。