    • 1. 发明专利
    • Divided structure of large steel h beam, and method of assembling the same
    • 大型钢H梁的分形结构及其组装方法
    • JP2007100383A
    • 2007-04-19
    • JP2005291388
    • 2005-10-04
    • Babcock Hitachi Kkバブコック日立株式会社
    • TSUKIJI TAIJIAKEGA TOSHIHARUUSHIMIZU MASARU
    • E04C3/06
    • PROBLEM TO BE SOLVED: To provide a large steel H beam which is divided into upper and lower sections or into upper and lower end sections, and facilitates assembly of the divided sections in the construction field.
      SOLUTION: The steel H beam is formed of: a steel H beam upper block 1 consisting of an upper flange 1a, upper vertical stiffener plates 2 for preventing buckling, and upper connection plates 4 to be mounted on columns 9, respectively; and a steel H beam lower block 6 consisting of a lower flange 6a, lower vertical stiffener plates 7 for preventing buckling, and lower connection plates 8 to be mounted on the column 9, respectively. The steel H beam lower block 6 has a vertical partition plate 3 which doubles as a horizontal stiffener plate for preventing buckling and as a connection plate between the upper block 1 and the lower block 6. Thus the steel H beam is set up by connecting the vertical partition plate 3, the upper vertical stiffener plates 2, and the upper connection plates 4 together.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种分为上部和下部或上部和下部部分的大型钢H梁,并且便于在施工现场中组装分割部分。 解决方案:钢H梁由以下部件形成:钢H梁上部块1,分别由上凸缘1a,用于防止弯曲的上垂直加强板2和安装在立柱9上的上连接板4组成。 以及由下凸缘6a,用于防止弯曲的下垂直加强板7和分别安装在柱9上的下连接板8组成的钢H梁下块6。 钢H梁下部块6具有垂直隔板3,其可以作为用于防止弯曲的水平加强板和作为上部块1和下部块6之间的连接板而兼作。因此,钢H梁通过连接 垂直隔板3,上垂直扶强板2和上连接板4在一起。 版权所有(C)2007,JPO&INPIT
    • 2. 发明专利
    • Seismic tie for boiler damping and earthquake-resistant boiler structure using the same
    • 锅炉阻尼和地震阻尼锅炉结构的地震
    • JP2013224730A
    • 2013-10-31
    • JP2012195298
    • 2012-09-05
    • Babcock Hitachi Kkバブコック日立株式会社
    • AIDA KIYOSHIKAWAMURA KOTAROTSUKIJI TAIJIHIYOSHI YUICHI
    • F16F15/02E04H9/02F16F7/12
    • F16F7/12E04H7/04E04H9/02E04H9/024
    • PROBLEM TO BE SOLVED: To provide a seismic tie capable of increasing the vibrational energy absorbing performance of the body of a boiler and reducing the seismic load acting on a support structure.SOLUTION: A seismic tie is installed between a support structure comprising a plurality of columns and beams and the body of a boiler hung down from an upper beam and absorbs seismic vibration energy. The seismic tie assumes a hinge coupling structure comprising a link made of elastic member and a pin material 16 made of elastic member, wherein the pin material 16 has in its center a bearing part 16C having circular section, and has a pin spindle shape cut-processed part 16B comprising a web 16W formed by partially cutting work in spindle shape in such a fashion that the diameter decreases gradually toward a hinge coupling part and a flange 16F remaining at the outer edge of the web part. The web 16W is shaped so that its two sides are cut flat in the pin axial direction, and on the section perpendicular to the pin axial direction, the ratio of the flange section area to the section area of the web ranges between 1.3 and 1.7.
    • 要解决的问题:提供一种能够增加锅炉主体的振动能量吸收性能并降低作用在支撑结构上的地震载荷的地震结构。解决方案:将地震带安装在包括多个 柱和梁,锅炉的主体从上梁垂下并吸收地震振动能量。 该地震带具有包括由弹性构件制成的连杆和由弹性构件制成的销材料16的铰链联接结构,其中,销材料16在其中心具有圆形截面的轴承部分16C, 处理部分16B包括通过以直径朝向铰链联接部分逐渐减小的方式部分地切割主轴形状的工作而形成的腹板16W以及残留在腹板部分的外边缘处的凸缘16F。 腹板16W的形状使得其两侧在销轴方向上被切割成平直,并且在与销轴方向垂直的部分上,凸缘部分面积与卷材截面积的比值在1.3和1.7之间。
    • 5. 发明专利
    • STRUCTURE OF STEEL PIPE COLUMN JOINING SECTION
    • JPH07208417A
    • 1995-08-11
    • JP540894
    • 1994-01-21
    • BABCOCK HITACHI KK
    • YASUDA TAKASHIARAKAWA HARUOTSUKIJI TAIJI
    • F16B11/00F16B7/20
    • PURPOSE:To improve working efficiency and safety at a job site by composing the joining section of steel pipe columns with an inset backing strip, divided up into plural numbers, provided on the inside of the joining section of one of the steel pipe columns, and a fixing member for connecting the inset backing strip with the other steel pipe column when the inset backing strip is inserted into the other steel pipe column. CONSTITUTION:An inset backing strip 3 and a receiving backing strip 5 divided into plural numbers are fitted on the inside of the bottom side steel pipe column 1 and an abutting backing strip 4 is fitted on the inside of the top side steel pipe column 2 at a factory. After insertion, the inset backing strip 3 and the top side steel pipe column 2 are fastened together with a bolt 6. Under this condition, the top and bottom columns become possible to transmit force with each other through the backing strip 3 and a temporary joining is formed. The abutting backing strip 4 and the receiving backing strip 5 not only set a root gap 16 for assuring sufficient weld penetration of the first pass during welding but also prevent welding defects caused by blow-by of the first pass bead and serve to secure a sound welding joint. Thus efficiency and safety of the steel frame construction work can be improved.