会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • GAS SUSPENSION SYSTEM AND METHOD
    • 气体悬浮系统和方法
    • WO2008147850A1
    • 2008-12-04
    • PCT/US2008/064479
    • 2008-05-22
    • BFS DIVERSIFIED PRODUCTS, LLCBOUNDS, Joseph, A.
    • BOUNDS, Joseph, A.
    • B60G17/04B60G13/06
    • B60G13/10B60G17/0521B60G2202/152B60G2202/314B60G2500/204B60G2500/2044
    • A method (200) of operating a gas suspension system (100) includes generating a first quantity of gas having a storage pressure (PST) and transferring (204) the first quantity of gas into a pressurized gas storage device (118) such that a second quantity of gas having approximately the storage pressure remains in a transfer pathway (112, 114A-G). The method also includes determining (208) that a condition exists for venting gas from the gas spring assembly and placing (212) the second quantity of gas into fluid communication with a quantity of gas having a spring pressure (PSP). The method further includes waiting (214) until an approximately equilibrium pressure has been reached, and then actuating (216) a control device to exhaust at least a portion of the gas from the suspension system. A gas suspension system (100) adapted to perform the method is also included.
    • 操作气体悬浮系统(100)的方法(200)包括产生具有储存压力(PST)的第一量的气体并将第一量的气体转移(204)到加压气体存储装置(118)中,使得 具有大约存储压力的第二量的气体保留在传送路径(112,114A-G)中。 该方法还包括确定(208)存在用于从气弹簧组件排出气体的状态,并且将第二量的气体放置(212)与具有弹簧压力(PSP)的一定量的气体流体连通。 该方法还包括等待(214)直到达到近似平衡压力,然后致动(216)控制装置以从悬架系统排出至少一部分气体。 还包括适于执行该方法的气体悬挂系统(100)。