会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • DOWNHOLE SHUT OFF ASSEMBLY FOR ARTIFICIALLY LIFTED WELLS
    • 卧室关闭组装人造的井
    • WO2009155243A2
    • 2009-12-23
    • PCT/US2009/047375
    • 2009-06-15
    • BAKER HUGHES INCORPORATEDBUSSEAR, Terry, R.HUBER, Kirk, J.
    • BUSSEAR, Terry, R.HUBER, Kirk, J.
    • E21B43/119E21B23/00
    • E21B34/14E21B43/128
    • A multi-string well has an electric submersible pump (ESP) that can be removed without killing the well. A slotted liner is sealingly secured externally to casing and internally to a guide string that remains in the wellbore when the ESP is removed. A ported sub is part of the guide string and a concentric screen that can have instruments that moves relatively to the guide string can selectively allow flow in an annulus between them and to the ported sub or that annulus between the guide and concentric strings can be blocked off by manipulation of the concentric string to close the ported sub. With the lower portion of the well now blocked off, the wellhead can be removed so that the ESP can come out with the production string. The device has particular application to steam assisted gravity drainage (SAGD) systems as well as other downhole applications.
    • 多串井具有可以在不杀死井的情况下被移除的电潜泵(ESP)。 一个开槽衬套密封地固定在套管的外部,并在内部被固定到当ESP被移除时留在井眼中的导向柱。 移动的子是引导弦的一部分,并且可以具有相对于引导弦线移动的乐器的同心屏幕可以选择性地允许在它们之间的环形空间和移动的子空间中流动,或者可以阻止导向和同心弦线之间的环形空间 通过操纵同心弦来关闭移动子。 当井的下部被堵住时,可以拆下井口,以便ESP能够与生产线一起出来。 该设备特别适用于蒸汽辅助重力排水(SAGD)系统以及其他井下应用。
    • 5. 发明申请
    • TUBINGLESS ELECTRICAL SUBMERSIBLE PUMP INSTALLATION
    • 无管电气不合适的泵安装
    • WO2008106239A1
    • 2008-09-04
    • PCT/US2008/050021
    • 2008-01-02
    • BAKER HUGHES INCORPORATEDBUSSEAR, Terry, R.SMITH, Grant, F.
    • BUSSEAR, Terry, R.SMITH, Grant, F.
    • E21B43/12
    • E21B43/128
    • A method of producing a well utilizes a submersible pump (31) run on a line (39), such as braided wire rope, that includes power conductors. The operator sets a packer (15) in the casing (ll), the packer having a check valve (19) and a tieback receptacle (27). The operator pressure tests the integrity of the casing above the packer, and if it passes, then runs the pump assembly on the line. The pump assembly has a shroud (59) with a downward extending extension that seals to the passage of the packer. If the pressure test of the casing fails, the operator runs a liner (51) into the well and engages the tieback receptacle. A smaller diameter pump is then lowered on a line into the liner and into engagement with the packer. The installing and retrieving of the pump is performed without the use of tubing.
    • 一种生产井的方法利用在包括电力导体的线(39)(例如编织钢丝绳)上延伸的潜水泵(31)。 操作者在壳体(11)中设置封隔器(15),封隔器具有止回阀(19)和回收容器(27)。 操作员压力测试封隔器上方的外壳的完整性,如果通过,则将泵组件运行在管路上。 泵组件具有罩(59),其具有向下延伸的延伸部,其密封到封隔器的通道。 如果套管的压力测试失败,操作人员将一个衬套(51)运入井中,并与接头座接合。 然后,较小直径的泵在一条线上下降到衬套中并与封隔器接合。 在不使用管道的情况下执行泵的安装和取回。