会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • METHOD AND SYSTEMS FOR OPERATING A WIND TURBINE
    • 风力发电机运行方法与系统
    • US20120010759A1
    • 2012-01-12
    • US13239647
    • 2011-09-22
    • Einar Vaughn LarsenAnthony Michael KlodowskiSidney Allen Barker
    • Einar Vaughn LarsenAnthony Michael KlodowskiSidney Allen Barker
    • G06F1/28
    • F03D7/0284F05B2270/10711F05B2270/335F05B2270/337H02J3/386Y02E10/723Y02E10/763
    • A method for controlling operation of a wind turbine included within a power generation and delivery system is described. The method includes measuring at least one operating condition of the power generation and delivery system. The method also includes transmitting, to a power limiter system, an operating condition feedback signal that corresponds to the operating condition. The method also includes analyzing the operating condition feedback signal to identify an occurrence of a grid contingency event and generating a real current command signal corresponding to an occurrence of a grid contingency event. The method also includes transmitting the real current command signal to a controller and applying the real current command signal to power converter performance to facilitate reducing pole-slipping. The method also includes storing, in a memory, at least one variable corresponding to the operating condition upon the occurrence of a grid contingency event.
    • 描述了包括在发电和输送系统内的风力涡轮机的运行控制方法。 该方法包括测量发电和输送系统的至少一个运行状态。 该方法还包括向功率限制器系统发送对应于操作条件的操作条件反馈信号。 该方法还包括分析操作条件反馈信号以识别网格事件事件的发生并产生对应于网格事件事件的发生的实际电流命令信号。 该方法还包括将实际电流命令信号发送到控制器,并将实际电流命令信号应用于功率转换器性能以便于减少极滑。 该方法还包括在发生网格事件事件时在存储器中存储与操作条件对应的至少一个变量。
    • 2. 发明申请
    • FAULT DETECTION SYSTEM FOR A GENERATOR
    • 发电机故障检测系统
    • US20130054043A1
    • 2013-02-28
    • US13222441
    • 2011-08-31
    • Anthony Michael KlodowskiSidney Allen Barker
    • Anthony Michael KlodowskiSidney Allen Barker
    • G06F1/28
    • G01R31/343F05B2220/7068F05B2260/80F05B2270/327F05B2270/337G01R31/42
    • A fault detection system is provided, and includes a generator, a power converter, a breaker, a current monitoring device, and a control module. The power converter is selectively connected to the generator and is selectively activated to produce a test voltage. The breaker is located between the generator and the power converter for selectively connecting the generator to the power converter. The breaker includes an open position and a closed position. The current monitoring device is located between the generator and the power converter. The current monitoring device measures a line current between the generator and the power converter. The control module is in communication with the current monitoring device and the power converter. The control module has a memory with a threshold current value.
    • 提供了一种故障检测系统,包括发电机,功率转换器,断路器,电流监视装置和控制模块。 功率转换器选择性地连接到发生器,并且被选择性地激活以产生测试电压。 断路器位于发电机和功率转换器之间,用于选择性地将发电机连接到功率转换器。 断路器包括打开位置和关闭位置。 电流监测装置位于发电机和电力转换器之间。 电流监测装置测量发电机和功率转换器之间的线路电流。 控制模块与当前监控设备和电源转换器通信。 控制模块具有具有阈值电流值的存储器。
    • 9. 发明授权
    • Method and systems for operating a wind turbine
    • 用于操作风力涡轮机的方法和系统
    • US08046109B2
    • 2011-10-25
    • US12639672
    • 2009-12-16
    • Einar Vaughn LarsenAnthony Michael KlodowskiSidney Allen Barker
    • Einar Vaughn LarsenAnthony Michael KlodowskiSidney Allen Barker
    • G06F1/28H02P9/04
    • F03D7/0284F05B2270/10711F05B2270/335F05B2270/337H02J3/386Y02E10/723Y02E10/763
    • A method for controlling operation of a wind turbine included within a power generation and delivery system is described. The method includes measuring at least one operating condition of the power generation and delivery system. The method also includes transmitting, to a power limiter system, an operating condition feedback signal that corresponds to the operating condition. The method also includes analyzing the operating condition feedback signal to identify an occurrence of a grid contingency event and generating a real current command signal corresponding to an occurrence of a grid contingency event. The method also includes transmitting the real current command signal to a controller and applying the real current command signal to power converter performance to facilitate reducing pole-slipping. The method also includes storing, in a memory, at least one variable corresponding to the operating condition upon the occurrence of a grid contingency event.
    • 描述了包括在发电和输送系统内的风力涡轮机的运行控制方法。 该方法包括测量发电和输送系统的至少一个运行状态。 该方法还包括向功率限制器系统发送对应于操作条件的操作条件反馈信号。 该方法还包括分析操作条件反馈信号以识别网格事件事件的发生并产生对应于网格意外事件发生的实际电流命令信号。 该方法还包括将实际电流命令信号发送到控制器,并将实际电流命令信号应用于功率转换器性能以便于减少极滑。 该方法还包括在发生网格事件事件时在存储器中存储与操作条件对应的至少一个变量。