会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • Plating apparatus
    • 电镀装置
    • US07297210B2
    • 2007-11-20
    • US10481448
    • 2002-10-15
    • Akihisa HongoNaoki MatsudaXinming Wang
    • Akihisa HongoNaoki MatsudaXinming Wang
    • B05C11/00
    • C25D17/001C23C18/1617C23C18/1628C23C18/1676C23C18/50H01L21/288
    • There is provided a plating apparatus which can keep a plating solution always in its optimal condition while minimizing the amount of plating solution used, and which can easily form a uniform plated film on the plating surface of a workpiece.The plating apparatus includes: a plating solution supply system (70) for constantly circulating a plating solution while heating the plating solution in a circulation tank (80) provided with a heating apparatus (78a), and supplying a predetermined amount of plating solution to a plating treatment section (24) when carrying out plating treatment; a plating solution recovery system (72) for recovering the plating solution after the plating treatment in the plating treatment section (24), heating the plating solution and returning the heated plating solution to the circulation tank (80); and a plating solution replenishment system (74) for replenishing the circulation tank (80) with a fresh plating solution or a plating solution component.
    • 提供一种电镀设备,其可以使电镀液始终处于最佳状态,同时最小化所使用的电镀溶液的量,并且可以在工件的电镀表面上容易地形成均匀的镀膜。 电镀装置包括:电镀液供给系统(70),用于在加热设置有加热装置(78a)的循环罐(80)的同时加热电镀液,使电镀液不断循环,并将预定量的电镀液供给到 电镀处理部(24); 电镀液回收系统(72),用于在所述电镀处理部(24)中回收所述电镀处理后的所述电镀液,加热所述电镀液并将所述被加热的电镀液返回到所述循环罐(80)。 以及用于用新鲜电镀液或电镀液成分补充循环罐(80)的电镀液补充系统(74)。
    • 3. 发明申请
    • WIND TURBINE INSTALLATION VESSEL AND A GRAVITY CENTER ADJUSTMENT DEVICE THEREOF
    • 风力涡轮机安装船和重力中心调整装置
    • US20110129329A1
    • 2011-06-02
    • US12754502
    • 2010-04-05
    • Jialiang WuXinming WangYanlin LiJunlei Bai
    • Jialiang WuXinming WangYanlin LiJunlei Bai
    • F03D11/00
    • B63B39/02B63B25/28F03D13/10F03D13/25F05B2240/932Y02E10/727
    • The present invention discloses a gravity center adjustment device (2) for a wind turbine installation vessel. The gravity center adjustment device (2) is movably mounted to an outside of a vessel body (4) of the wind turbine installation vessel, so that the gravity center adjustment device (2) can selectively move in a plane substantially parallel with the vessel body (4). Since the gravity center adjustment device (2) according to the invention is movably installed to the vessel body and can move in a plane substantially parallel with the vessel body (4) so as to adjust the horizontal position of the gravity center of the installation vessel, its ability of adjusting the gravity center of the wind turbine installation vessel can be improved and the stability of the wind turbine installation vessel can be improved. Therefore, the operation efficiency can be improved and the cost of constructing a wind power plant on the offshore can be reduced. The present invention also discloses a wind turbine installation vessel including the gravity center adjustment devices (2) described above.
    • 本发明公开了一种用于风力涡轮机安装容器的重心调节装置(2)。 重力调节装置(2)可移动地安装在风力涡轮机安装容器的容器主体(4)的外部,使得重心调节装置(2)可以选择性地在与容器主体平行的平面中移动 (4)。 由于根据本发明的重心调节装置(2)可移动地安装到容器主体上并且可以在与容器主体(4)基本平行的平面中移动,以便调节安装容器的重心的水平位置 可以提高其调整风力涡轮机安装容器的重心的能力,并且可以提高风力涡轮机安装容器的稳定性。 因此,可以提高运行效率,降低在海上建设风力发电厂的成本。 本发明还公开了一种包括上述重心调节装置(2)的风力涡轮机安装容器。
    • 4. 发明申请
    • WIND TURBINE INSTALLATION VESSEL AND A GRAVITY CENTER ADJUSTMENT DEVICE THEREOF
    • 风力涡轮机安装船和重力中心调整装置
    • US20110126747A1
    • 2011-06-02
    • US12754524
    • 2010-04-05
    • Jialiang WuXinming WangYanlin LiJunlei Bai
    • Jialiang WuXinming WangYanlin LiJunlei Bai
    • B63B43/08B63B43/04B63B1/00
    • B63B25/28B63B39/02F03D13/10F03D13/25F05B2240/932Y02E10/727
    • The present invention discloses a gravity center adjustment device for a wind turbine installation vessel, with the gravity center adjustment device (2) fixedly mounted to the outside of the vessel body (4) of the wind turbine installation vessel. The existence of the gravity center adjustment device (2) according to the present invention is independent from the vessel body and no longer limited by the size of the installation vessel and the size of the ballast bank provided in the vessel body of the wind turbine installation vessel. The size of the gravity center adjustment device (2) may be set as desired so that the adjustment ability of the gravity center adjustment device can be changed, whereby its ability for adjusting gravity center of the wind turbine installation vessel can be improved and the stability of the wind turbine installation vessel can be improved. Therefore, the wind turbine installation vessel can operate in an environment of poor weather condition, so that the operation efficiency can be improved and the cost of constructing a wind power plant on the offshore can be reduced. The present invention also discloses a wind turbine installation vessel including the above-mentioned gravity center adjustment device (2).
    • 本发明公开了一种用于风力涡轮机安装容器的重心调节装置,重心调节装置(2)固定地安装在风力涡轮机安装容器的容器本体(4)的外部。 根据本发明的重心调节装置(2)的存在独立于船体,不再受安装船的尺寸和设置在风力涡轮机装置的船体中的压载舱的尺寸的限制 船只。 重心调整装置(2)的尺寸可以根据需要设定,从而能够改变重心调节装置的调节能力,能够提高调整风力发电机组重心的重心的能力和稳定性 的风力涡轮机安装容器。 因此,风力发电机安装船可以在天气条件恶劣的环境下运行,从而可以提高运行效率,降低海上风力发电厂的建设成本。 本发明还公开了一种包括上述重心调节装置(2)的风力涡轮机安装容器。