会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明公开
    • 온라인 시스템 테스트 방법
    • 在线系统测试方法
    • KR1020110034825A
    • 2011-04-06
    • KR1020090092272
    • 2009-09-29
    • 현대자동차주식회사기아자동차주식회사이화여자대학교 산학협력단
    • 최병주서주영양승완권해영
    • G06F11/36G06F11/26
    • PURPOSE: A method for testing an online system is provided to maximally ensure a real-time operation of a system and test the dynamic situations of all programs by respectively applying a hooking and profiling techniques to the process management scheme of an OS(Operating System) and the collection of system state information. CONSTITUTION: An error model is defined in a first step(S101), and a test agent is inserted in a second step(S102). A test position is hooked is a third step(S103), and test information is collected in a fourth step(S104). The test agent is removed in a fifth step(S105). Program execution information, process context information and system state information are collected in the step for collecting test information.
    • 目的:提供一种用于测试在线系统的方法,以最大限度地确保系统的实时操作,并通过分别将钩和分析技术应用于OS(操作系统)的过程管理方案来测试所有程序的动态情况, 并收集系统状态信息。 构成:在第一步骤(S101)中定义错误模型,并且在第二步骤中插入测试代理(S102)。 钩住测试位置是第三步(S103),并且在第四步骤中收集测试信息(S104)。 在第五步骤中移除测试代理(S105)。 在收集测试信息的步骤中收集程序执行信息,处理情境信息和系统状态信息。
    • 10. 发明公开
    • 통신 테스트 장치 및 방법
    • 通信测试设备及其方法
    • KR1020130042503A
    • 2013-04-26
    • KR1020127034164
    • 2011-03-15
    • 현대자동차주식회사기아자동차주식회사이화여자대학교 산학협력단
    • 최병주서주영양승완김영수권해영오정석장승연
    • G06F11/22
    • G06F11/006G06F11/3636G06F11/3672
    • PURPOSE: A communication test device and a method thereof are provided to test the communication of a system during the operation of the system by testing an actually managed code. CONSTITUTION: An insertion module(101) inserts a test agent into process control block. When a communication event is generated between processes, a hooking module(103) hooks a test target with a test code by using the test agent. When the test code is hooked, a scanning module(105) collects test information about communication between the processes. A logging module(107) stores the test information collected by the scanning module. A process control block(201) includes a present resource use state about the processes, a process state, priority, and a function table. The communication event includes message transmission between the processes, sharing data transmission, the use of a message queue, and the use of a synchronization object. [Reference numerals] (101) Insertion module; (103) Hooking module; (105) Scanning module; (107) Logging module; (201) Process control block;
    • 目的:提供一种通信测试设备及其方法,用于通过测试实际管理的代码来测试系统操作期间系统的通信。 构成:插入模块(101)将测试代理插入到过程控制块中。 当在进程之间产生通信事件时,挂钩模块(103)通过使用测试代理钩住测试目标与测试代码。 当测试代码被挂接时,扫描模块(105)收集关于进程之间的通信的测试信息。 记录模块(107)存储由扫描模块收集的测试信息。 过程控制块(201)包括关于过程的当前资源使用状态,过程状态,优先级和功能表。 通信事件包括进程之间的消息传输,共享数据传输,消息队列的使用以及同步对象的使用。 (附图标记)(101)插入模块; (103)挂钩模块; (105)扫描模块; (107)记录模块; (201)过程控制块;