    • 부위별 원가정보를 연계한 시설물 건설공정 관리방법
    • 施工过程管理方法将元件的成本信息连接起来
    • KR100800547B1
    • 2008-02-04
    • KR1020060136669
    • 2006-12-28
    • 주식회사 포스코건설
    • 구병모윤창섭김호열김성태김찬중장근호주인식박진석이근배
    • G06Q50/08G06F17/30
    • Y02P90/30G06Q50/08G06F17/30345
    • A management method of facility construction processes in accordance with cost information of each element is provided to make the entire process diagram automatically by using a database including processes, activities and unit cost information. An integrated database is constructed in advance, wherein the database stores unit cost information of each activity and process information according to each facility, each element, each process, and each activity(S100). Processes for the entire facilities are made by analyzing elements of the entire system to be constructed, calculating the number of elements to be used, determining a process and an activity to be used, and referring to the integrated database so as to link the unit cost information to the processes automatically(S200). A subordinate process is automatically made by analyzing elements of a superordinate process, calculating the number of elements to be used, determining a process and an activity and referring to the integrated database and the superordinate process so as to link the unit cost information to the processes automatically(S300). Each process situation is totaled on the basis of the unit cost information to be collected to the superordinate process sequentially and repeatedly(S400). A model instance is updated by storing the unit cost information and the processes according to a classification system of the integrated database(S500).
    • 提供根据每个元件的成本信息的设施施工过程的管理方法,以通过使用包括过程,活动和单位成本信息的数据库自动地制作整个过程图。 预先构建集成数据库,其中数据库根据每个设施,每个元素,每个处理和每个活动存储每个活动的单位成本信息和处理信息(S100)。 整个设施的流程是通过分析要构建的整个系统的元素,计算要使用的元素的数量,确定流程和使用的活动,并参考综合数据库来链接单位成本 信息自动进入(S200)。 通过分析上级过程的元素,计算要使用的元素的数量,确定过程和活动以及参考集成数据库和上级过程来自动进行下级过程,以将单位成本信息链接到过程 自动地(S300)。 每个处理情况根据要顺序地和重复地收集到上级处理的单位成本信息来合计(S400)。 通过根据集成数据库的分类系统存储单位成本信息和处理来更新模型实例(S500)。