    • 1. 发明授权
    • 조립식 버팀보를 이용한 흙막이 시스템 및 그를 이용한터파기 방법
    • 使用边框组装的保持墙系统和使用其的挖掘方法
    • KR100912574B1
    • 2009-08-19
    • KR1020080038519
    • 2008-04-25
    • 주식회사 씨에스구조엔지니어링신세계건설(주)최동섭
    • 최동섭
    • E02D17/04E02D1/02E02D17/20F16B35/00
    • E02D17/04E02D1/02E02D17/20F16B35/00
    • A retaining wall system using a prefabricated strut assembly and an excavation method using the system are provided to carry out excavation continuously and rapidly as the struts bear the soil pressure while supporting the load of concrete slab. A retaining wall system using a prefabricated strut assembly is as follows. A retaining wall is constructed on the ground boundary face. H-posts(30) are driven into the excavation site bordered by the retaining wall. Excavation for building of ground slab is carried out. A wale is applied to the exposed retaining wall and a bracket(40) is installed on each flange of the H-posts. Double vertical struts(210a,210b) are set up to be supported by the bracket, with each post interposed. Double horizontal outside struts(220a,220b) are set up between the double vertical struts. Double horizontal inside struts(230a,230b) are set up between the double vertical struts. A ground slab is constructed. Excavation for building of underground slab is carried out. Construction of underground slab is repeated until the designed basement.
    • 提供使用预制支柱组件的挡土墙系统和使用该系统的挖掘方法,以支撑混凝土板的载荷作为支撑承受土压力的连续和快速地进行挖掘。 使用预制支柱组件的挡土墙系统如下。 挡土墙在地面边界面上构造。 H柱(30)被驱动进入与挡土墙相邻的挖掘点。 开挖地板的开挖进行。 将一个纵行应用于暴露的挡土墙,并且在H柱的每个凸缘上安装支架(40)。 双垂直支柱(210a,210b)被设置成由支架支撑,每个柱插入。 双水平外撑杆(220a,220b)设置在双垂直支柱之间。 在双垂直支柱之间设置双水平内部支柱(230a,230b)。 建造一块地板。 进行地下建筑的开挖。 重复地下建筑,直到设计的地下室。
    • 2. 发明公开
    • 테두리보용 데크판을 이용한 무지주 지하구조물 시공방법
    • 不支持施工方法使用墙壁扶手
    • KR1020080098262A
    • 2008-11-07
    • KR1020070043725
    • 2007-05-04
    • 주식회사 씨에스구조엔지니어링최동섭
    • 최동섭
    • E02D29/045
    • E02D29/045E02D2250/0007E02D2250/0023
    • A non-support underground construction method is provided to omit the installation of support for wall girder construction and to reduce the construction period. A non-support underground construction method comprises following steps: (a) a step for carrying out the construction the slurry wall the shear key is embedded in junction with the wall girder to the extrusion; (b) a step for digging out slurry wall internal space; (c) a step for setting up the bracket for the deferment in the slurry wall under junction with the wall girder of the location in which the existing step is under construction; (d) a step for setting up the deck plate for the wall girder for the wall girder construction it surrounds the slurry wall; (e) a step for setting up the existing step it faces the slurry wall the end part is contained inside the deck plate for the wall girder; (f) a step for applying the concrete inside the deck plate for the wall girder; (g) a step for removing the bracket for the deferment.
    • 提供了一种不支持地下施工方法,省略了对墙梁施工的支撑安装,减少施工期。 非支撑式地下施工方法包括以下步骤:(a)施工剪力墙与剪力墙嵌合在一起的施工步骤; (b)挖出泥浆墙内部空间的步骤; (c)在与现有工程正在施工的地点的墙梁的连接处,设置用于延展泥浆墙的支架的步骤; (d)设置围绕泥浆壁的墙梁结构的墙梁的甲板板的步骤; (e)设置其面向浆料壁的现有步骤的步骤,端部被容纳在用于壁梁的甲板板内; (f)将混凝土施加在墙板的甲板内的步骤; (g)删除延期支架的步骤。
    • 3. 发明公开
    • 선단보강 슈를 갖는 피에이치씨 파일
    • PHC胶带加固鞋加固
    • KR1020090080795A
    • 2009-07-27
    • KR1020080006761
    • 2008-01-22
    • 주식회사 씨에스구조엔지니어링최동섭신세계건설(주)
    • 최동섭
    • E02D5/72E02D5/58E02D5/30E02D7/02
    • E02D5/72E02D5/30E02D5/58E02D7/02E02D2200/1678
    • A PHC pile having a leading end reinforcement shoe is provided to minimize the influence of slime, to decrease the degree of subsidence by driving into a stable bearing layer, and to increase the bearing capacity for a leading end by increasing the area of a leading end. A PHC pile having a leading end reinforcement shoe comprises a PHC(pre-tensioned spun high strength concrete) pile(10) formed in the shape of an empty cylinder and having a leading end surrounded by a reinforcing band(11), and a reinforcement shoe(20) having the top welded to the leading end of the PHC pile and the bottom formed in the shape of a triangular pyramid projected downward to expand the diameter of the PHC pile and to penetrate easily, wherein the reinforcement shoe comprises a cylinder pipe(21) inserted with the leading end of the PHC pile and welded with the PHC pile, a hollow reinforcement plate(22) coupled to the bottom of the cylinder pipe and having the larger outside diameter than the outside diameter of the PHC pile to increase the bearing capacity of the leading end of the PHC pile, and an excavation reinforcement plate(23) composed of a first excavation reinforcement plate coupled perpendicularly to the bottom of the hollow reinforcement plate and having the shape of an isosceles triangle and a pair of second excavation reinforcement plates coupled perpendicularly to the bottom of the hollow reinforcement plate and having the shape of a right-angled isosceles triangle to penetrate easily when driving.
    • 提供具有前端加强鞋的PHC桩以最小化粘液的影响,通过驱动到稳定的轴承层来降低沉降的程度,并且通过增加前端的面积来增加前端的承载能力 。 具有前端加强鞋的PHC桩包括形成为空筒形状并且具有由加强带(11)包围的前端的PHC(预张紧纺丝高强度混凝土)桩(10) 具有顶部焊接到PHC桩的前端的鞋(20)和形成为向下突出的三角锥的形状的底部以扩大PHC桩的直径并容易地穿透,其中,加强鞋包括缸管 (21)插入与PHC桩的前端并与PHC桩焊接的中空加强板(22),其耦合到气缸管的底部并且具有比PHC桩的外径更大的外径以增加 所述PHC桩的前端的承载能力以及由与所述中空加强板的底部垂直结合的第一挖掘加强板构成的挖掘加强板(23) 一个等腰三角形和一对第二挖掘加强板,它们垂直于中空加强板的底部并且具有直角等腰三角形的形状,以便在驾驶时容易地穿透。
    • 4. 发明授权
    • 테두리보용 데크판을 이용한 무지주 지하구조물 시공방법
    • 테두리보용데크판을이용한무지주지하구조물시공방
    • KR100876853B1
    • 2008-12-31
    • KR1020070043725
    • 2007-05-04
    • 주식회사 씨에스구조엔지니어링최동섭
    • 최동섭
    • E02D29/045
    • A non-support underground construction method is provided to omit the installation of support for wall girder construction and to reduce the construction period. A non-support underground construction method comprises following steps: (a) a step for carrying out the construction the slurry wall the shear key is embedded in junction with the wall girder to the extrusion; (b) a step for digging out slurry wall internal space; (c) a step for setting up the bracket for the deferment in the slurry wall under junction with the wall girder of the location in which the existing step is under construction; (d) a step for setting up the deck plate for the wall girder for the wall girder construction it surrounds the slurry wall; (e) a step for setting up the existing step it faces the slurry wall the end part is contained inside the deck plate for the wall girder; (f) a step for applying the concrete inside the deck plate for the wall girder; (g) a step for removing the bracket for the deferment.
    • 提供了一种非支护地下施工方法,省去了对墙梁施工支架的安装,缩短了施工工期。 一种非支撑地下施工方法,包括以下步骤:(a)施工步骤:将剪力键嵌入泥浆壁并与墙梁连接以挤压; (b)挖掘泥浆壁内部空间的步骤; (c)在现有步骤正在施工的地点与墙梁连接处设置用于延迟的浆料壁的支架的步骤; (d)为壁梁结构的墙梁设置甲板板的步骤,它围绕泥浆壁; (e)设置现有台阶面向浆液壁的步骤,其端部包含在墙梁的甲板内; (f)用于将壁板梁的甲板内的混凝土施加于墙梁的步骤; (g)移除用于延迟的支架的步骤。
    • 5. 发明授权
    • PC기둥을 이용한 탑다운 공법
    • 使用预制混凝土柱的自上而下的方法
    • KR100788623B1
    • 2007-12-26
    • KR1020060041146
    • 2006-05-08
    • 주식회사 씨에스구조엔지니어링최동섭
    • 최동섭
    • E02D29/045E02D29/16E02D5/24E02D5/30
    • 본발명은 PC기둥을이용한탑다운(Top-down) 공법에관한것으로서, 종전의탑다운공법에서지중(地中)에선매입되는기둥으로철골기둥대신 PC(precast-concrete)기둥을이용한탑다운공법에관한것이다. 본발명은지하구조물의시공순서를지상에서부터시작하여점차깊은지하로진행하며완성하는탑다운공법(top-down method)에서, 슬러리월(Slurry Wall)을구축하는제1공정; 지상에서기둥설치부위를수직굴착한후 단위길이로제작된복수개의 PC기둥을지반에삽입하고연결하여연결PC기둥을제작하는제2공정; 상기연결PC기둥을지상의강재에묶어고정시킨후 상기연결PC기둥의하부에서기초형성부위를수직굴착하고콘크리트를타설하여기초를형성하는제3공정; 및일정한깊이로지반을굴착한후 지하층슬래브를구축하는작업을반복하여복수층의지하구조물을구축하되, 상기슬러리월은상기지하구조물의벽체로이용되고, 상기연결PC기둥은상기지하층슬래브의지지기둥으로이용되도록하는제4공정; 을포함하여이루어지는것을특징으로하는 PC기둥을이용한탑다운공법을제공한다.
    • 9. 发明公开
    • 철근 보강한 선단보강장치를 구비한 매입말뚝용 중공형 개단말뚝
    • 提示打开带有加固装置的开口装置
    • KR1020110106528A
    • 2011-09-29
    • KR1020100025599
    • 2010-03-23
    • 최동섭주식회사 씨에스구조엔지니어링신세계건설(주)
    • 최동섭민병찬김영호
    • E02D5/72E02D5/22E02D5/54E02D5/80E02D5/58E02D5/30
    • E02D5/72E02D5/226E02D5/30E02D5/54E02D5/58E02D5/80E02D2250/0046E02D2600/30
    • 본 발명은 매입말뚝공법으로 시공되는 중공형 개단말뚝에 관한 것으로, 보다 상세하게는 말뚝 선단의 응력분산이 뛰어나 선단지지력을 향상시킬 수 있고 선단고정액과의 합성효과로 보다 우수한 선단폐색효과를 기대할 수 있으며 선단폐색으로 인한 말뚝 선단의 종방향 균열을 효과적으로 방지할 수 있는 선단보강장치를 구비한 중공형 개단말뚝에 관한 것이다.
      본 발명의 적절한 실시 형태에 따르면, 내부에 중공이 형성되고 선단이 개방된 중공형 개단말뚝을 매입말뚝에 적용하기 위해 선단에 선단보강장치가 결합되며, 선단보강장치는, 중공형 개단말뚝의 선단에 결합되고 중공형 개단말뚝의 직경보다 큰 외경을 갖고 중공형 개단말뚝의 중공 직경과 동일하거나 그 보다 작은 직경을 갖는 개구가 중앙에 형성된 링 플레이트; 링 플레이트의 하면에 결합되는 십자형 보강판; 링 플레이트의 상면에 링 플레이트의 중앙 개구 둘레를 따라 면에 수직하게 결합된 다수 개의 수직철근과, 수직철근의 길이방향을 따라 일정한 피치을 갖고 수직철근을 감싸는 나선철근으로 구성된 원통형 철근망; 원통형 철근망의 수직철근을 링 플레이트의 개구를 관통시켜 연장하고 끝을 U자형으로 절곡하여 구성한 다수 개의 응력분산철근; 및 응력분산철근의 높이방향을 따라 일정 간격으로 설치되는 복수의 띠철근을 포함하는 것을 특징으로 하는 선단보강장치를 구비한 매입말뚝용 중공형 개단말뚝이 제공된다.
    • 10. 发明授权
    • 근입용 관입강관을 갖는 선단보강장치를 구비한 매입말뚝용 중공형 개단말뚝
    • 提示打开带有加固装置的开口装置
    • KR101011322B1
    • 2011-01-28
    • KR1020100025598
    • 2010-03-23
    • 최동섭주식회사 씨에스구조엔지니어링신세계건설(주)
    • 최동섭민병찬
    • E02D5/72E02D5/58
    • E02D5/72E02D5/58E02D2200/16
    • PURPOSE: A hollow open-ended pile for embedded piles with an end reinforcement device having a penetration steel pipe for penetration is provided to effectively prevent longitudinal cracking of the leading end of a pile. CONSTITUTION: A hollow open-ended pile for embedded piles with an end reinforcement device having a penetration steel pipe for penetration comprises an end reinforcement device(200). The end reinforcement device comprises a ring plate(210), a penetration steel pipe(220), a rib plate(230), and a reinforcement pipe(240). The ring plate is combined with the leading end of the hollow open end pile. The ring plate has larger external diameter than the diameter of the hollow open end pile. An opening is formed at the center of the ring plate. The penetration steel pipe is combined with the lower surface of the ring plate. The rib plate is combined on the outer circumference of the penetration steel pipe in a radial direction. The reinforcement pipe is combined with the upper side of the ring plate.
    • 目的:提供一种用于嵌入桩的中空开口桩,其具有具有用于穿透的穿透钢管的端部加强装置,以有效地防止桩的前端的纵向开裂。 构成:具有端部加强装置的嵌入桩的中空开口桩具有用于穿透的穿透钢管,包括端部加强装置(200)。 端部加强装置包括环板(210),穿透钢管(220),肋板(230)和加强管(240)。 环形板与中空开口桩的前端相结合。 环形板的外径大于中空开口桩的直径。 在环板的中心形成开口。 穿透钢管与环板的下表面结合。 肋板沿径向组合在穿透钢管的外周上。 加强管与环板的上侧结合。