会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • 프리플랙션 스틸거더를 이용한 강합성 라멘교 시공방법
    • 钢铁混凝土桥梁施工技术
    • KR100842062B1
    • 2008-06-30
    • KR1020070113777
    • 2007-11-08
    • 우경건설 주식회사(주)평화엔지니어링정기영
    • 노윤근정기영
    • E01D21/00E01D2/00E01D2/02E01D101/26
    • E01D21/00E01D2/00E01D2/02E01D2101/268
    • A construction method of a steel concrete composite rahmen bridge using preflexed steel girder is provided to prevent tension and cracks on the concrete caused by excessive stress within the concrete, and reduce statically indeterminate force of an abutment, thereby facilitating the construction with simplified abutment configuration. A construction method of a steel concrete composite rahmen bridge using preflexed steel girder comprises the steps of: constructing an abutment(10); performing preflexion on a steel girder; installing the preflexed steel girder on the abutment; pouring deck concrete on the steel girder; performing pre-correction for creep deformation and drying shrinkage between the steel girder and abutment; fixing upper sides of the steel girder and abutment with a high tension bolt; strongly coupling the steel girder and abutment by pouring concrete(18); performing deck concrete pavement and soft stone construction.
    • 提供了一种使用预弯钢梁的钢混凝土复合拉姆门桥施工方法,以防止混凝土内由于应力过大引起的混凝土上的张力和裂缝,并降低基台的静态不确定力,从而简化了桥接构造。 使用预弯钢梁的钢混凝土复合拉姆门桥的施工方法包括以下步骤:构造基台(10); 在钢梁上进行折弯; 在桥基上安装预弯钢梁; 在钢梁上浇筑甲板混凝土; 执行钢梁和基台之间的蠕变变形和干燥收缩的预校正; 固定钢梁的上侧并与高压螺栓抵接; 通过浇注混凝土强力联接钢梁和桥台(18); 执行甲板混凝土路面和软石建筑。
    • 2. 发明授权
    • 가설케이블에 의한 일반강재의 초기 프리스트레스 도입방법
    • 通过电缆电缆的初步介绍一般钢的方法
    • KR100915590B1
    • 2009-09-07
    • KR1020080109340
    • 2008-11-05
    • (주)평화엔지니어링정기영우경건설 주식회사
    • 정기영
    • E01D21/00E01D22/00E01D11/04E01D19/16E01D101/32
    • E01D21/00E01D11/04E01D19/16E01D22/00E01D2101/32
    • An initial prestressing method for general steel materials using temporary cables is provided to reduce construction cost by implementing the function of general cables through the temporary cables. An initial prestressing method for general steel materials using temporary cables comprises a step of setting a main girder(12) on an abutment and a pier(13), a dead anchorage(23) on the top of a pylon(11) installed on the pier, a live anchorage(24) on the main girder, and diagonal member connecting brackets(20) on flanges of the pylon and the main girder, a step of fixing one end of a temporary cable on the dead anchorage and the other on the live anchorage, inducing tension on the temporary cable by tensing the temporary cable end on the live anchorage, and fixing the tensed temporary cable end with a fixing nut, a step of setting a diagonal member of general steel between the diagonal member connecting brackets and connecting the diagonal member connecting brackets and the diagonal member by placing a connection plate between them and fixing with bolt and nut, and a step of removing the temporary cable from the dead anchorage and the live anchorage so that the tension induced on the temporary cable is left on the diagonal member.
    • 提供使用临时电缆的普通钢材初步预应力方法,通过临时电缆实现通用电缆的功能,降低施工成本。 用于使用临时缆索的一般钢材的初始预应力方法包括将主梁(12)设置在基台和墩(13)上的步骤,安装在其上的吊架(11)的顶部上的死锚(23) 码头,主梁上的活动锚地(24),以及在塔架和主梁的法兰上的对角构件连接支架(20),将临时缆索的一端固定在死地锚上的步骤 活动锚固,通过张紧活动锚地上的临时电缆端引起临时电缆的张力,并用固定螺母固定拉紧的临时电缆端;将对角构件连接支架与连接支架之间的普通钢对角构件 对角构件连接支架和对角构件,通过在它们之间放置连接板并用螺栓和螺母固定,以及从死锚和活锚固中去除临时缆索的步骤,使得在 临时电缆留在对角线上。
    • 3. 发明授权
    • 곡선강재틀의 곡선강재에 보강재를 설치하고, 프리플렉션을 도입한 곡선형프리플렉션강재빔틀의 제작방법
    • 弯曲型预弯钢梁框架,用于安装弯曲钢筋弯曲钢筋材料的预弯曲及其制造方法
    • KR100909839B1
    • 2009-07-28
    • KR1020080047227
    • 2008-05-21
    • 우경건설 주식회사정기영(주)평화엔지니어링
    • 정기영
    • E01D2/00E01D21/00E01D101/32
    • E01D2/00E01D21/00E01D2101/32
    • A method for manufacturing a curve type preflexion steel beam frame adopting preflexion for equipped with a reinforcing material is provided to make the installation of a curved bridge simple and to improve the structural strength of the curved bridge. A method for manufacturing a curve type preflexion steel beam frame adopting preflexion for equipped with a reinforcing material comprises a step of making a curved steel which is bent to the side to fit for the radius of curvature of a curved bridge, a step of making a curved steel frame by connecting the pair of curved steel with a bracing(21), a step of installing the curved steel frame on the upper and lower sides and placing a spacer between both ends of the upper and lower curved steel, a step of mounting steel caps on both ends of the curved steel and making a curved steel frame assembly by connecting the steel caps with a steel wire or steel bar, a step of mounting a jack at specific intervals between the upper and lower curved steel, a step of bending the curved steel by the jack, and then mounting a reinforcement member(40) with a reinforced steel plate(41) onto a flange(11) of the bent portion or attaching shear connectors and applying high-strength concrete onto the flange, and a step of removing the jack.
    • 提供了一种采用预弯曲装置加固材料的弯曲型折弯钢梁框架的制造方法,使弯曲桥架的安装变得简单,并提高了弯曲桥梁的结构强度。 用于制造具有补强材料的预弯曲弯曲型折弯型钢梁框架的制造方法包括:制造向侧面弯曲以适应弯曲桥梁的曲率半径的弯曲钢的步骤, 通过将一对弯曲钢与支撑件(21)连接在一起的弯曲钢框架,将弯曲钢框架安装在上侧和下侧上并在上下弯曲钢的两端之间放置间隔件的步骤,安装步骤 弯曲钢两端的钢盖,通过钢钢丝或钢筋连接钢帽,制成弯曲钢框架组件,在上下弯曲钢板之间以特定间隔安装千斤顶的步骤,弯曲步骤 通过千斤顶弯曲的钢,然后将具有加强钢板(41)的加强构件(40)安装到弯曲部分的凸缘(11)上或附接剪切连接器并将高强度混凝土施加到凸缘上, 以及去除千斤顶的步骤。
    • 4. 发明授权
    • 거더의 상향변형에 의하여 프리스트레스가 간접적으로도입된 간접프리스트레스도입사재와 미도입사재를 설치한사판교 및 이의 시공방법
    • FINBACK BRIDGE包括间接介绍介绍包括材料在内的所有材料的引入和非引入材料及其构造方法
    • KR100890005B1
    • 2009-03-25
    • KR1020080067559
    • 2008-07-11
    • (주)평화엔지니어링정기영우경건설 주식회사
    • 정기영
    • E01D11/04E01D19/16E01D21/00
    • E01D11/04E01D19/16E01D21/00
    • A diagonal element which is indirectly prestressed by the vertical deformation of girder, an extradosed bridge using indirectly prestressed and non-prestressed diagonal elements and a construction method thereof are provided to cut down on the construction cost of extradosed bridge by using steel plates as diagonal elements rather than using expensive cables and fastener. A method for constructing an extradosed bridge using indirectly prestressed and non-prestressed diagonal elements comprises a step of connecting one end of a diagonal element on a pillar(13) by hinge, a step of connecting the other end of the diagonal element on a girder(19) by hinge after raising the girder with a jack installed on a folding bent; a step of removing the jack and the folding bent after installing a deck slab and pavement; a step of connecting tightening the hinges with high tension bolt and nut so that the diagonal element is indirectly prestressed; a step of connecting a non-prestressed diagonal element(12) between the pillar and the girder; and a step of wrapping the indirectly prestressed and non-prestressed diagonal elements with a coating(14).
    • 提供了一种由梁的垂直变形间接预应力的对角线元素,使用间接预应力和非预应力对角线元素的引渡桥梁及其施工方法,通过使用钢板作为对角线元件来降低引渡桥梁的施工成本 而不是使用昂贵的电缆和紧固件。 使用间接的预应力和非预应力的对角元件构造引渡桥的方法包括通过铰链将对角线元件的一端连接在支柱(13)上的步骤,将对角线元件的另一端连接在梁上 (19)通过铰链在用安装在折叠弯头上的千斤顶升高大梁之后; 在安装甲板和路面之后,拆下千斤顶并折叠弯曲的步骤; 连接用高压螺栓和螺母拧紧铰链的步骤,使对角元件间接预应力; 在柱和梁之间连接非预应力对角元件(12)的步骤; 以及用涂层(14)包裹间接的预应力和非预应力的对角元件的步骤。
    • 5. 发明授权
    • 활성사재와 비활성사재를 주형과 지주에 강결연결한 사판재교량 및 이의 시공방법
    • 通过将主动和不活动的连接件强力连接到模具和支柱及其构造方法构建的板式桥梁
    • KR100890004B1
    • 2009-03-25
    • KR1020080065540
    • 2008-07-07
    • (주)평화엔지니어링정기영우경건설 주식회사
    • 정기영
    • E01D11/04E01D19/16E01D21/00
    • E01D11/04E01D19/16E01D21/00
    • An extradosed bridge in which active and inactive diagonal elements are strongly connected to a girder and a pillar and a construction method thereof are provided to cut down on the construction cost by using steel plates as diagonal elements rather than expensive cables and connecting the diagonal elements with bolt and nut rather than a separate expensive fastener. A method for constructing an extradosed bridge using active and inactive diagonal elements comprises a step of connecting active diagonal elements(31) of steel material between a girder(16) and a pillar(11) of steel material by hinge in the symmetrical structure, a step of raising the pillar with a jack, a step of prestressing the active diagonal element, a step of coating the pillar reinforced concrete, a step of firmly connecting the active diagonal element, the girder, and the pillar with high tension bolt and nut, and a step of connecting inactive diagonal elements, which are not pre-stressed, between the girder and the pillar in the symmetrical structure.
    • 提供主动和非活动的对角元件牢固地连接到大梁和支柱及其构造方法的引渡桥,以通过使用钢板作为对角线元件而不是昂贵的电缆来减少施工成本,并将对角线元件与 螺栓和螺母,而不是单独的昂贵的紧固件。 使用有源和非活动对角元件构造引渡桥的方法包括通过对称结构中的铰链在钢材的梁(16)和钢柱(11)之间连接钢材的主动对角线元件(31)的步骤, 使用千斤顶提升支柱的步骤,对主体对角线元件进行预应力的步骤,涂覆柱钢筋混凝土的步骤,用高拉力螺栓和螺母牢固地连接主动对角线元件,梁和柱的步骤, 以及在对称结构中的梁和柱之间连接不预应力的无活动对角元件的步骤。
    • 8. 实用新型
    • 교량용 가변 일방향 가동받침
    • 桥梁可变单向移动轴承
    • KR200380602Y1
    • 2005-03-31
    • KR2020050000078
    • 2005-01-03
    • (주)평화엔지니어링정기영
    • 정기영
    • E01D19/04
    • E01D19/045
    • 본 고안은 가동방향을 기계적으로 찾아가도록 하부지압판을 ±α/2의 각도만큼 회전이 가능하게 설치하고, 상부지압판을 하부지압판상에 설치함으로써 각 ±α/2 사이에서 온도 및 크리프 변화를 구속받지 않고 신축이 자유롭도록 한 교량용 가변 일방향 가동받침을 제공하는데 그 목적이 있다.
      상기한 목적을 달성하기 위한 본 고안에 따른 교량용 가변 일방향 가동받침은 전체적으로 판상체로 이루어지고, 그 가운데부분이 아래방향으로 일정한 직경 및 두께로 돌출부가 형성된 상부지압판과; 상기 상부지압판의 돌출부에 맞닿도록 가운데 부분이 교축방향으로 일정한 폭으로 오목홈이 형성됨과 동시에 자유롭게 회전되는 하부지압판과; 상기 하부지압판이 가운데 부분에 견고히 고정됨과 동시에 판상체로 이루어진 하부판으로 구성됨을 특징으로 한다.
    • 9. 发明授权
    • 부력기능을 갖는 속빈 원통형강재거푸집을 이용한수중콘크리트직접기초시공방법.
    • 使用具有浮力的中空圆柱形钢模具的水下混凝土的直接基础施工方法
    • KR100847245B1
    • 2008-07-18
    • KR1020070025462
    • 2007-03-15
    • (주)평화엔지니어링정기영
    • 정기영
    • E02D29/09E02D27/42E02D15/00E02D23/02E01D19/02
    • 본 발명은 수중의 지반 위에 교각의 콘크리트직접기초를 시공하기 위하여 원통형의 부력기능을 갖는 속빈원통형강재거푸집을 가물막이겸용으로 하여 다수개의 속빈원통형강재거푸집을 상호 연결한 수평연결부를 형성하면서, 수중의 지반위에 설치하고, 상기 속빈원통형강재거푸집의 내부의 지반 위에 수중콘크리트를 타설하고, 상기 속빈원통형강재거푸집의 내부는 건조된 상태를 유지하도록 한 다음, 기초콘크리트를 타설설치하여, 기존의 가물막이는 수중 콘크리트가 접하는 부분에만 원추형으로 한 것에서 기초콘크리트에 접하는 속빈원통형강재거푸집까지 원추형으로 확대하여, 상기 속빈원통형강재거푸집 내부를 일정한 원추형부경사각을 갖도록 원추형부로 하여 상기 속빈원통형강재거푸집에 부력이 작용되면, 기초콘크리트에 접하는 속빈원통형강재거푸집의 원추형부가 기초콘크리트로부터 손쉽게 분리되어 부력에 의하여 수면 위로 부상하도록 하고, 수중 및 기초콘크리트와 접하는 표면에 방수겸용박리제를 도포하여, 속빈원통형강재거푸집에 부력이 작용되면, 콘크리트 교각기초인 기초콘크리트의 측면에 접한 속빈원통형강재거푸집의 원추형부가 손쉽게 콘크리트교각기초에서 분리되어 수면위로 부상하여 재사용을 위한 회수가 가능하도록 한 수중콘크리트직접기초시공방법에 관한 것이다.
      또한, 상기 원추형부가 외부에 접촉하고 있는 흙의 마찰력 이나 혹은 수중 및 기초콘크리트와의 접착력으로 인하여 부력 만으로 콘크리트교각기초인 수중 및 기초콘크리트로부터 분리가 용이하지 않을 경우 속빈원통형강재거푸집 내부의 원주 부분에 다수개의 부력상승보조장치를 설치하여 속빈원통형강재거푸집에 작용되는 부력을 상기 장치를 이용하여 보다 증가시켜 용이하게 이탈분리되도록 하는 것이다.
      또한, 부력상승보조장치를 위해 강재거푸집의 상층부에 설치된 브라켓은 시공중 강재거푸집과 수중콘크리트 사이의 방수기능이 보다더 확실한 수밀성을 갖도록 하기 위하여 시공중 강재케이블을 수중콘크리트에 매립하여 브라켓에 인장고정하는 역할도 겸하게 한 것이다.
      또한, 강재의 연결은 고장력볼트에 의한 마찰이음의 기능을 완전히 확보하기 위하여 수평연결부에는 방수재(고무)를 끼워 연결치 않고, 연결하므로서 이음부의 마찰력이 손실되지 않게 하고, 별도로 방수막을 설치해서 연결부에 방수기능을 갖도록 하였다.