会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明授权
    • Equipment set generation support apparatus and method
    • 设备组生成支持设备及方法
    • US08190721B2
    • 2012-05-29
    • US12196458
    • 2008-08-22
    • Tomonori MaegawaMasahiro IshiyamaYusuke DoiYu Kaneko
    • Tomonori MaegawaMasahiro IshiyamaYusuke DoiYu Kaneko
    • G06F15/177
    • G06Q10/06
    • An equipment set generation support apparatus (a) acquires, from a plurality of equipments connected to a network, state change event information notifying a state change of each equipment and an occurrence time and date of the state change, (b) sets a detection condition including a start time and an end time of a detection period, (c) selects state change event information whose occurrence time and date of the state change falling within the detection period from the state change event information acquired, and (d) detects, from the plurality of equipments, a set of equipments whose states change in the detection period and a set of state values after the state change of each equipment based on the state change event information selected.
    • 设备组生成支持装置(a)从连接到网络的多个设备获取通知各设备的状态变化的状态变化事件信息和状态变化的发生时间和日期,(b)设定检测条件 包括检测周期的开始时间和结束时间,(c)从获取的状态变化事件信息中选择状态变化的发生时间和日期落在检测期间内的状态变化事件信息,(d)从 多个设备,根据所选择的状态变化事件信息,检测期间的状态变化的设备和各设备的状态变化后的一组状态值。
    • 4. 发明申请
    • POWER CONTROL APPARATUS AND METHOD
    • 功率控制装置和方法
    • US20120043813A1
    • 2012-02-23
    • US13218048
    • 2011-08-25
    • Yusuke DoiKeiichi TeramotoYoshiki TerashimaYasuyuki Nishibayashi
    • Yusuke DoiKeiichi TeramotoYoshiki TerashimaYasuyuki Nishibayashi
    • H02J3/14
    • H02J3/00H02J3/14H02J9/00H02J13/0006Y02B70/3225Y04S20/222Y10T307/469
    • According to one embodiment, a power control apparatus includes a calculation unit, a detection unit, a storage unit, a selection unit and an execution unit. The calculation unit calculates a spare power capacity and a total spare power capacity. The detection unit detects whether a required spare capacity is short, based on the required spare capacity and each of the spare power capacity and the total spare power capacity. The storage unit stores power control operation items. The selection unit selects power control operation items if the required spare capacity is short. The execution unit executes application operation of one or more the power control operation items until the required spare capacity becomes available, and executes waiting operation of one or more power control operation items executing the application operation if the required spare capacity is available.
    • 根据一个实施例,功率控制装置包括计算单元,检测单元,存储单元,选择单元和执行单元。 计算单元计算备用电力容量和总备用电力容量。 检测单元基于所需的备用容量和备用电力容量和总备用电力容量来检测所需的备用容量是否短。 存储单元存储电力控制操作项目。 如果所需的备用容量较短,选择单元选择功率控制操作项。 执行单元执行一个或多个功率控制操作项目的应用操作,直到所需的备用容量变得可用,并且如果所需的备用容量可用,则执行执行应用操作的一个或多个功率控制操作项目的等待操作。
    • 5. 发明授权
    • Zoom dial mechanism
    • 缩放拨号机制
    • US07995288B2
    • 2011-08-09
    • US12656031
    • 2010-01-14
    • Kenichi MaruyamaYusuke DoiHiroshi Yamakose
    • Kenichi MaruyamaYusuke DoiHiroshi Yamakose
    • G02B15/14
    • G05G1/12G02B7/10H04N1/00397H04N1/00496H04N1/195H04N1/19594H04N2201/0436
    • A zoom dial mechanism includes a zoom dial mounted on a base plate so as to extend through a central hole of the base plate and so as to be turnable, a coil spring mounted on the base plate to urge the zoom dial toward a neutral position, and a push knob mounted in a central hole of the dial. The base plate has a groove concentric with the central hole. The coil spring is mounted in the groove. The mechanism further includes a first rib fixed to the dial so as to abut one end of the coil spring and a second rib fixed to the dial so as to abut the other end of the spring. The spring is compressed by the first rib when the dial is turned clockwise, and the coil spring is compressed by the second rib when the dial is turned counterclockwise.
    • 变焦拨盘机构包括安装在基板上的变焦拨盘,以便延伸穿过基板的中心孔并且可转动;安装在基板上的螺旋弹簧,以将变焦拨盘推向中立位置, 以及安装在表盘中心孔中的按钮。 基板具有与中心孔同心的凹槽。 螺旋弹簧安装在槽中。 该机构还包括固定在表盘上以抵接螺旋弹簧的一端的第一肋和固定在表盘上的第二肋,以抵靠弹簧的另一端。 当表盘顺时针转动时,弹簧被第一肋压缩,当表盘逆时针转动时,弹簧被第二肋压缩。
    • 6. 发明授权
    • Gateway apparatus, control instruction processing method, and program
    • 网关设备,控制指令处理方法和程序
    • US07984135B2
    • 2011-07-19
    • US12407855
    • 2009-03-20
    • Yu KanekoTomonori MaegawaYusuke DoiMasahiro Ishiyama
    • Yu KanekoTomonori MaegawaYusuke DoiMasahiro Ishiyama
    • G06F15/173G06F15/16
    • H04L67/125H04L12/4625H04L67/28H04L67/2823H04L67/2833H04L67/32H04L69/08
    • A gateway apparatus includes a translator connected to a first network for one or more controllers to control one or more devices, and one or more aggregators. The translator includes an acquisition unit which acquires load information concerning a load on each of the controllers, a control instruction reception unit which receives a control instruction for a device from a client via the second network, a determination unit which determines whether the instruction is an aggregation target, based on the information, a first transfer unit which transfers the instruction to the aggregator corresponding to the instruction, and a second transfer unit which receives an aggregate control instruction from the aggregator. The aggregator includes a third transfer unit which receives the instruction from the translator, an aggregation unit which aggregates the plurality of instructions into one aggregate control instruction, and a fourth transfer unit which transfers the aggregate control instruction.
    • 网关装置包括连接到用于一个或多个控制器的第一网络以控制一个或多个设备和一个或多个聚合器的转换器。 翻译器包括:获取单元,其获取关于每个控制器上的负载的负载信息;控制指令接收单元,经由第二网络从客户端接收设备的控制指令;确定单元,确定该指令是否为 基于该信息的汇总对象,将与该指示对应的指示传递给聚合器的第一传送单元和从聚合器接收汇总控制指令的第二传送单元。 聚合器包括接收来自转换器的指令的第三传送单元,将多个指令聚合成一个聚合控制指令的聚合单元,以及传送聚合控制指令的第四传送单元。
    • 7. 发明申请
    • Facility equipment cooperation system, equipment control method, and agent apparatus
    • 设备设备配套系统,设备控制方法和代理设备
    • US20090231092A1
    • 2009-09-17
    • US12403174
    • 2009-03-12
    • Tomonori MaegawaYu KanekoYusuke DoiMasahiro Ishiyama
    • Tomonori MaegawaYu KanekoYusuke DoiMasahiro Ishiyama
    • G05B19/00
    • G05B15/02G05B2219/2642
    • An apparatus communicating with a gateway apparatus on a control system network for facility equipment, via an information system network, includes a unit which stores not less than one piece of virtual point information defining a virtual point combined with not less than one piece of facility equipment, a user authentication unit which performs user authentication for a user associated with a client, a unit which receives a request for control on one virtual point from the client, a unit which creates a remote control command for the facility equipment associated with the request based on the virtual point information when the request has been received and the user authentication has succeeded, and a unit which transmit the remote control command to the gateway via the information system network when tenant authentication for a tenant associated with the agent apparatus which is performed by the gateway has succeeded.
    • 通过信息系统网络与用于设备设备的控制系统网络上的网关装置通信的装置包括存储不少于一条定义虚拟点的虚拟点信息的单元,该虚拟点信息与不少于一个设备设备 ,对与客户端相关联的用户进行用户认证的用户认证单元,从客户端接收对一个虚拟点的控制请求的单元,为与所述请求相关联的设备设备创建远程控制命令的单元 在接收到请求并且用户认证成功时的虚拟点信息上的单元,以及当与代理设备相关联的租户的租户认证时,经由信息系统网络将远程控制命令发送到网关的单元, 网关成功了。
    • 9. 发明申请
    • POWER-SAVING CONTROL APPARATUS AND METHOD
    • 节电控制装置和方法
    • US20090132836A1
    • 2009-05-21
    • US12269523
    • 2008-11-12
    • Keisuke MeraYusuke DoiTakafumi SakamotoToshiyuki UmedaShoji Otaka
    • Keisuke MeraYusuke DoiTakafumi SakamotoToshiyuki UmedaShoji Otaka
    • G06F1/00G06F12/14
    • H04L63/166H04L63/08H04W12/06H04W52/0229Y02D70/00Y02D70/20
    • A power-saving control apparatus includes a memory storing first to Nth different authentication codes, determines, every time a signal including an authentication code is received, whether the authentication code in the received signal is a valid code which matches one of the authentication codes in the memory, outputs an operation signal to a main apparatus when the authentication code in the received signal is determined to be the valid code, and generates a new authentication code, when (a) the number of times the authentication code in each received signal matches a first authentication code of the authentication codes in the memory is equal to a predetermined value or (b) the authentication code in the received signal matches a second or subsequent authentication code of the authentication codes in the memory, to delete one of the authentication codes in the memory, and to store the new authentication code in the memory.
    • 省电控制装置包括存储第一至第N不同认证码的存储器,每当接收到包括认证码的信号时,确定接收信号中的认证码是否是符合以下认证码之一的有效码: 存储器,当接收信号中的认证码被确定为有效码时,向主设备输出操作信号,并且当(a)每个接收信号中的认证码匹配次数时,生成新的认证码 存储器中的认证码的第一认证码等于预定值,或者(b)接收信号中的认证码与存储器中的认证码的第二或后续认证码匹配,以删除认证码之一 在内存中,并将新的验证码存储在内存中。
    • 10. 发明申请
    • EQUIPMENT SET GENERATION SUPPORT APPARATUS AND METHOD
    • 设备产生支持设备和方法
    • US20090063678A1
    • 2009-03-05
    • US12196458
    • 2008-08-22
    • Tomonori MaegawaMasahiro IshiyamaYusuke DoiYu Kaneko
    • Tomonori MaegawaMasahiro IshiyamaYusuke DoiYu Kaneko
    • G06F15/16
    • G06Q10/06
    • An equipment set generation support apparatus (a) acquires, from a plurality of equipments connected to a network, state change event information notifying a state change of each equipment and an occurrence time and date of the state change, (b) sets a detection condition including a start time and an end time of a detection period, (c) selects state change event information whose occurrence time and date of the state change falling within the detection period from the state change event information acquired, and (d) detects, from the plurality of equipments, a set of equipments whose states change in the detection period and a set of state values after the state change of each equipment based on the state change event information selected.
    • 设备组生成支持装置(a)从连接到网络的多个设备获取通知各设备的状态变化的状态变化事件信息和状态变化的发生时间和日期,(b)设定检测条件 包括检测周期的开始时间和结束时间,(c)从获取的状态变化事件信息中选择状态变化的发生时间和日期落在检测期间内的状态变化事件信息,(d)从 多个设备,根据所选择的状态变化事件信息,检测期间的状态变化的设备和各设备的状态变化后的一组状态值。