会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Load fuzzy modeling device and method for power system
    • 电力系统负荷模糊建模装置及方法
    • US08095477B2
    • 2012-01-10
    • US12327804
    • 2008-12-03
    • Hua-Guang ZhangQiu-Ye SunDong-Sheng YangZhan-Shan WangTie-Yan ZhangZhi-Shan LiangHong XinWu-Qi SongYun-Shuang Wang
    • Hua-Guang ZhangQiu-Ye SunDong-Sheng YangZhan-Shan WangTie-Yan ZhangZhi-Shan LiangHong XinWu-Qi SongYun-Shuang Wang
    • G06G7/00G06F15/18
    • G06N7/04G05B13/0275G05B17/02
    • A load fuzzy modeling device for the power system based on the causality diagram, the composite cloud generator and the improved T-S fuzzy model, comprising: a hardware device, including: the sensors, a signal conditioning and filter module, an A/D conversion module, a causality conversion module, a DSP module, a memory module, a display and keyboard module connected with the DSP module, respectively and a communication module connected with the PC. The voltage and the current are respectively acquired from the system through a voltage transformer and a current transformer, and then are transmitted into the filter circuit for filtering, thus are amplified through a amplifier LM258P as the voltage within the range of −5V ˜+5V so as to input into the A/D conversion modules for sampling; the digital signal is simply processed by the causality conversion module according to certain analysis algorithm principle, and the processed signal is transmitted into the DSP to process, the final results thus displayed on the LCD screen and transmitted into the PC through the commutation module.
    • 一种基于因果关系图的电力系统的负荷模糊建模装置,复合云发电机和改进的TS模糊模型,包括:硬件设备,包括:传感器,信号调理和滤波模块,A / D转换模块 分别与DSP模块连接的因果转换模块,DSP模块,存储器模块,显示器和键盘模块以及与PC连接的通信模块。 电压和电流分别通过变压器和电流互感器从系统中获取,然后传输到滤波电路进行滤波,因此通过放大器LM258P放大到-5V〜+ 5V范围内的电压 以便输入到A / D转换模块进行采样; 数字信号根据一定的分析算法原理由因果转换模块简单处理,并将处理后的信号传输到DSP进行处理,最终结果显示在LCD屏幕上,并通过换向模块传输到PC中。
    • 2. 发明申请
    • Load Fuzzy Modeling Device And Method For Power System
    • 负载模糊建模装置及电力系统方法
    • US20090192953A1
    • 2009-07-30
    • US12327804
    • 2008-12-03
    • Hua-Guang ZhangQiu-Ye SunDong-Sheng YangZhan-Shan WangTie-Yan ZhangZhi-Shan LiangHong XinWu-Qi SongYun-Shuang Wang
    • Hua-Guang ZhangQiu-Ye SunDong-Sheng YangZhan-Shan WangTie-Yan ZhangZhi-Shan LiangHong XinWu-Qi SongYun-Shuang Wang
    • G06N7/04
    • G06N7/04G05B13/0275G05B17/02
    • A load fuzzy modeling device for the power system based on the causality diagram, the composite cloud generator and the improved T-S fuzzy model, comprising: a hardware device, including: the sensors, a signal conditioning and filter module, an A/D conversion module, a causality conversion module, a DSP module, a memory module, a display and keyboard module connected with the DSP module, respectively and a communication module connected with the PC. The voltage and the current are respectively acquired from the system through a voltage transformer and a current transformer, and then are transmitted into the filter circuit for filtering, thus are amplified through a amplifier LM258P as the voltage within the range of −5V ˜+5V so as to input into the A/D conversion modules for sampling; the digital signal is simply processed by the causality conversion module according to certain analysis algorithm principle, and the processed signal is transmitted into the DSP to process, the final results thus displayed on the LCD screen and transmitted into the PC through the commutation module.
    • 一种基于因果关系图的电力系统的负荷模糊建模装置,复合云发电机和改进的TS模糊模型,包括:硬件设备,包括:传感器,信号调理和滤波模块,A / D转换模块 分别与DSP模块连接的因果转换模块,DSP模块,存储器模块,显示器和键盘模块以及与PC连接的通信模块。 电压和电流分别通过变压器和电流互感器从系统中获取,然后传输到滤波电路进行滤波,因此通过放大器LM258P放大到-5V〜+ 5V范围内的电压 以便输入到A / D转换模块进行采样; 数字信号根据一定的分析算法原理由因果转换模块简单处理,并将处理后的信号传输到DSP进行处理,最终结果显示在LCD屏幕上,并通过换向模块传输到PC中。