会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • Multiflow gas turbine power plant
    • 多流燃气轮机发电厂
    • US3968647A
    • 1976-07-13
    • US467793
    • 1974-05-07
    • Serge Boudigues
    • Serge Boudigues
    • F02K3/04F02K3/062F02K3/065F02C3/06
    • F02K3/062F02K3/04F02K3/065
    • A dual-flow or multiflow gas turbine power plant comprising a jet pipe, ateast two separate flow-ducts each opening into the jet pipe, namely a first flow-ducts through which passes, in operation, a first gas flow and which contains a gas generator of the gas turbine type and an expansion-turbine located downstream of the gas generator, and a second flow-ducts through which passes, in operation, a second gas flow and a mixer device in which the first gas flow leaving the expansion turbine, and the second gas flow, are arranged to be mixed prior to entering the jet pipe, the plant further comprising a recompressor located downstream of the mixer device, in which the mixture of the two gas flows is arranged to be recompressed before entering the jet pipe.
    • 一种双流或多燃气涡轮发电厂,其包括喷射管,每个至少两个独立的流动管道,每个分开的流动管道通向喷射管,即第一流动管道,在操作中通过第一流动管道流过第一气流, 燃气轮机类型的气体发生器和位于气体发生器下游的膨胀涡轮机,以及第二流动管道,其在运行中通过第二气体流和混合器装置,其中离开膨胀涡轮机的第一气流 和第二气流布置成在进入喷射管之前混合,所述设备还包括位于混合器装置下游的再压缩机,其中两个气流的混合物布置成在进入射流之前被再压缩 管。
    • 4. 发明授权
    • Multiflow gas turbine power plant
    • 多流燃气轮机发电厂
    • US4055949A
    • 1977-11-01
    • US682523
    • 1976-05-03
    • Serge Boudigues
    • Serge Boudigues
    • F02K3/04F02K3/062F02K3/065F02C3/06
    • F02K3/04F02K3/062F02K3/065
    • A dual-flow or multiflow gas turbine power plant comprising a jet pipe, ateast two separate flow-ducts each opening into the jet pipe, namely a first flow-duct through which passes, in operation, a first gas flow and which contains a gas generator of the gas turbine type and an expansion-turbine located downstream of the gas generator, and a second flow-duct through which passes, in operation, a second gas flow and a mixer device in which the first gas flow leaving the expansion turbine, and the second gas flow, are arranged to be mixed prior to entering the jet pipe, the plant further comprising a recompressor located downstream of the mixer device, in which the mixture of the two gas flows is arranged to be recompressed before entering the jet pipe.
    • 一种双流或多燃气涡轮发电厂,包括喷射管,每个至少两个独立的流动管道,每个分开的流动通道进入喷射管,即第一流动管道,在操作中通过该第一流动管道流过第一气流, 燃气轮机类型的气体发生器和位于气体发生器下游的膨胀涡轮机,以及第二流动通道,其在运行中通过第二气流和混合装置,其中离开膨胀涡轮机的第一气流 和第二气流布置成在进入喷射管之前混合,所述设备还包括位于混合器装置下游的再压缩机,其中两个气流的混合物布置成在进入射流之前被再压缩 管。