    • 1. 发明专利
    • SPLIT TYPE DRAIN DITCH
    • JPH1136430A
    • 1999-02-09
    • JP20528597
    • 1997-07-14
    • SANYO CONCRETE KOGYO KK
    • IWAZAWA SHIRO
    • E03F5/04
    • PROBLEM TO BE SOLVED: To reduce the working man-hour by demarcating a unit length of a drain ditch by a plurality of parallel cut grooves arranged at the prescribed intervals, and cutting the cut grooves through pressure or impact to be combined with each other by the length. SOLUTION: A split type drain ditch 1 is formed of concrete straight units of the prescribed length, and the split type drain ditch 1 of the unit length is demarcated by a plurality of cut parallel grooves G arranged with the prescribed intervals. The cut groove G is straight and narrow, and its groove bottom is formed narrower toward a bottom part, a plurality of wedges are inserted into the selected cut grooves G, and an impact is given to the wedges through a hammer to achieve the breakage from the desired cut groove G. The whole length L of the split type drain ditch 1 which is specified as a standard value, is demarcated into unit lengths of L1, L2, and L3 by the cut groove G, and the demarcated split type drain ditches 1 are appropriately combined with each other to form the drain ditch of the desired length. Thus, man-hours of the installation work of the drain ditches to be installed straight can be greatly reduced.
    • 9. 发明专利
    • Soil covering work of slope using specific block
    • 使用特定块的土壤覆盖作业
    • JPS59165733A
    • 1984-09-19
    • JP3799883
    • 1983-03-07
    • Sanyo Concrete Kogyo Kk
    • KUNIMURA SADAO
    • E02D17/20E02D29/02
    • PURPOSE: To easily perform soil-covering work for slope by a method in which broken stones are laid in concrete frames set on a slope, and specific blocks of a square or large-size edged triangular form, etc., are slantedly stacked up using cement mortar.
      CONSTITUTION: Iron bars R are assembled into a lattice form and laid on a sloped ground, non-skid H-steel or anchor bolt H is buried in crossing points, and meshed concrete frames C are placed on the tops of these iron bars and non-skid H-steel or anchor bolts H. Broken stones S are laid on the ground in the frames C and specific blocks such as square blocks, largesize edged triangular blocks, small-sized edged triangular blocks, or rectangular blocks are slantedly stacked up using cement mortar M on the broken stones S.
      COPYRIGHT: (C)1984,JPO&Japio
    • 目的:通过在斜坡上设置破碎的石块放置在混凝土框架中的方法,方便地进行斜坡土壤覆盖工作,并使用正方形或大尺寸三边形形状的特定块倾斜堆叠,使用 水泥砂浆 构成:铁棒R组装成格子形式并放置在倾斜的地面上,防滑H型钢或锚定螺栓H被埋在交叉点,并且网状混凝土框架C放置在这些铁棒的顶部, - H型钢或锚固螺栓H.破碎的石头S放置在框架C的地面上,特定的块如方块,大型边三角形块,小尺寸三角形块或矩形块倾斜堆叠,使用 水泥砂浆M在破碎的石头上