会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明申请
    • PROCESS AND APPARATUS FOR PRODUCING A METAL STRIP BY CASTING AND ROLLING
    • 通过铸轧辊生产金属带的方法和装置
    • WO2012045629A3
    • 2012-06-14
    • PCT/EP2011066889
    • 2011-09-28
    • SMS SIEMAG AGHOVESTAEDT ERICHSEIDEL JUERGEN
    • HOVESTAEDT ERICHSEIDEL JUERGEN
    • B21B1/46
    • B21B1/463
    • The invention relates to a process for producing a metal strip (1) by casting and rolling, in which process firstly a slab (3) with a nominal slab thickness (d) is cast in a casting machine (2) by discharging metal at a nominal casting speed (v) from a mould (4), wherein the slab (3) is subjected to thickness reduction in the region of a strand guide (5) by a number of rollers, wherein the temperature of the slab (3) is then controlled in a furnace (6) of a defined length, wherein the slab (3) is rolled downstream of the furnace (6) in a rolling mill train (7), and wherein in particular the slab (3) is subjected to thickness reduction to a nominal deformed slab thickness or preliminary strip thickness in a roughing rolling mill (8) downstream of the casting machine (2) and upstream of the furnace (6). In order firstly to provide an adequate buffer store in the event of interruptions to rolling and secondly to ensure the smallest possible furnace length in order to be able to work optimally in continuous operation, without high economical outlay, the invention provides that at least one of the following measures is carried out for temporarily reducing, in particular for temporarily interrupting, the supply of rolling stock into the rolling mill train (7): a) the slab thickness (d0) is increased downstream of the casting machine (2) by reducing the thickness reduction of the slab (3) in the region of the strand guide (5); b) the casting speed is lowered from the nominal casting speed (v0) to a reduced value; c) the thickness reduction of the slab (3) in the roughing rolling mill (8) is reduced. The invention further relates to a casting and rolling installation.
    • 本发明涉及一种用于通过铸造制造金属带材(1),其中最初在铸造机(2),一平板(3)具有标称板坯厚度(d)(由应用金属的具有标称铸造速度(ⅴ)从模具 4),其中平板(3)(在编线导引件5)的区域是由多个的薄型铸造辊子进行,板坯(3)然后在烘箱中(6)限定长度的回火,其中,所述板( 3)(在炉6)在一个轧机机组进行轧制后(7),并且其中尤其是平板(3)的铸造机后面(2)和在粗轧机的炉床(6)的前部(8)的厚度减小到标称重构板坯厚度 或预剥离厚度受到影响。 上而不会产生高的经济成本足够缓冲存储器,用于轧制中断的情况下,在另一方面,为了确保以在连续模式下最佳地工作炉的最小可能长度,一方面,本发明提供的是,暂时降低,特别是用于供应的暂时中断 通过在引导链(5)的区域中降低了板坯(3)的厚度减小a)增加板坯厚度(D0)铸造机(2)的后面;:在轧机机组是滚动(7)执行的措施中的至少一个 b)将铸造速度从标称铸造速度(v0)降低到减小的值; c)减少粗轧机(8)中的板坯(3)的厚度减小。 此外,本发明涉及一种铸轧机。
    • 7. 发明申请
    • METHOD AND DEVICE FOR RECOVERING ENERGY DOWNSTREAM OF A CONTINUOUS CASTING INSTALLATION
    • 方法及装置回收能量后面的铸造厂
    • WO2011138171A3
    • 2011-12-29
    • PCT/EP2011056314
    • 2011-04-20
    • SMS SIEMAG AGSEIDEL JUERGENHOVESTAEDT ERICHPETER SUDAU PETER
    • SEIDEL JUERGENHOVESTAEDT ERICHPETER SUDAU PETER
    • F22B1/04B22D11/124H01L35/28
    • F22B1/04B22D11/14
    • The invention relates to a method for recovering energy downstream of a continuous casting installation (1), wherein the continuous casting installation (1) is adjoined by a roller table (2) and at least one flame-cutting machine (5) for cutting to length a cast strand of metal (3). To achieve optimum utilization of the energy of the still hot strand of metal and ensure a high degree of functionality of the continuous casting installation, the invention provides that, in a region (4) downstream of the continuous casting installation (1), a stream of heat (6) from the strand of metal (3) is allowed to flow to at least one heat exchanger and/or thermocouple (7), wherein electrical energy is generated with the thermal energy taken up by the heat exchanger (7) in an energy transformation installation (8), or electrical energy is generated directly with the energy taken up by the thermocouple (7). Furthermore, the invention relates to a device for recovering energy downstream of a continuous casting installation.
    • 本发明的连续铸造设备(1),其特征在于,随后的辊表连续铸造设备(1)之后涉及用于能量回收的方法(2)和至少一个切割机(5),用于切割的铸造金属带材(3)。 为了达到最佳的使用仍然是热的金属带的能量,以确保高度的连续铸造的功能,本发明提供了在一区域(4)从所述金属带材连铸设备(1)的后面(3)的热流量(6)连接到至少 其中,与所述热交换器(7)捕获时,产生电能的热能的能量转换单元(8),或者使用热电偶(7)能直接产生电能记录被允许流动到热交换器和/或热电偶(7)。 本发明还涉及一种装置,用于连续铸造设备的后面中回收能量。
    • 8. 发明申请
    • METHOD AND DEVICE FOR PROCESSING A SLAB
    • 方法和设备加工坯料
    • WO2010149192A9
    • 2011-04-21
    • PCT/EP2009005942
    • 2009-08-17
    • SMS SIEMAG AGSEIDEL JUERGENLAZZARO KLAUS
    • SEIDEL JUERGENLAZZARO KLAUS
    • B21B39/14
    • B21B39/14B21B1/466B21B13/06B21B45/004B21B45/06B21B45/08B21B2015/0014Y10T29/4517
    • The invention relates to a method for processing a slab (1) in a device, which comprises at least one furnace (2), at least one processing device (3, 4) arranged downstream of the furnace (2) in the conveying direction (F) of the slab (1), and a rolling train (5) arranged downstream of the at least one processing device (3, 4) in the conveying direction (F) of the slab (1), wherein means (6, 7) are provided, by means of which a force can be applied to the sides (8, 9) of the slab (1) in order to move the axis (10) of the slab (1) in agreement with a specified position transversely to the conveying direction (F) of the slab (1), in particular in accordance with the axis (11) of the rolling train (5). In order to optimize the rolling process by precisely introducing the slab into the rolling train, according to the invention first means (6) act on the slab (1) to apply a lateral force to the slab (1) at a first location (12), and second means (7) act on the slab (1) to apply a lateral force to the slab (1) at a second location (13), wherein the second location (13) lies at a distance from the first location (12) in the conveying direction (F) of the slab (1), wherein the first location (12) lies behind the furnace (2) and wherein the second location (13) lies in front of, within, or behind the at least one processing device (3, 4). The invention further relates to a device for processing a slab.
    • 本发明涉及一种方法,用于在设备中处理的板坯(1)包括至少一个炉(2),该炉中的至少一个(2)在板坯的输送方向(F)(1)下游的处理设备(3,4)和 所述至少一个处理装置(3,4)在输送方向上的板(1)下游的轧制机组的(F)(5),所述装置(6,7)设置有两个侧边(8,9)的板坯(1 ),力可以根据轧机的轴线(11)施加,绕轴线(板坯的10)(1)(按照横向的预定位置于输送方向(F)的板坯(1)的,特别是5) 移动。 为了通过精确地将所述板坯进入轧机优化轧制过程中,本发明提供了第一装置(6),用于在第一位置(12)上的板(1)作用于板(1)上施加的横向力 和在上板(1)动作的第二位置(13)上的板(1)上施加侧向力的第二装置(7),所述的板坯的输送方向(F)的第二位置(13)(1) 从第一位置(12),间隔开,其中,所述第一位置(12)的炉(2)的下游,并且其中,所述第二位置(13)在前面,内或所述至少一个处理设备的后面(3,4)。 此外,本发明涉及一种装置,用于处理的板坯。