会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • OPTIMIZED DYNAMIC ROUTING IN AN OPTICAL NETWORK
    • 光网络优化动态路由
    • WO2007062670A1
    • 2007-06-07
    • PCT/EP2005/012717
    • 2005-11-29
    • TELECOM ITALIA S.P.A.D'ALESSANDRO, AlessandroMORRO, RobertSALMERON, Santos, Victoria
    • D'ALESSANDRO, AlessandroMORRO, RobertSALMERON, Santos, Victoria
    • H04J14/02
    • H04J14/0246H04J14/0257H04J14/0267H04J14/0269H04J14/0284H04Q2011/0084H04Q2011/0086
    • A routing method for a network including first type of nodes and second type of nodes, in particular a optical telecommunication network including transparent codes and regenerating nodes, comprises constructing a simplified network topology including the given node (S), t e second nodes (R i ), first paths between the given node and the second nodes and second paths between each couple of second nodes, wherein the first and second paths pass only through first nodes and have an. acceptable run-through cost, and, if the given node receives a routing request specifying a destination node (D) that is reachable only through a second node, constructing an enhanced network topology by adding to the simplified network topology the destination node and third paths between the destination nod: and the second nodes that pass only through first nodes and have an acceptable run-through cost; and searching fog a path having the lowest run-through cost from the give node to the destination node in the enhanced network topology.
    • 包括第一类型的节点和第二类型的节点,特别是包括透明代码和再生节点的光通信网络的网络的路由方法包括:构建包括给定节点(S),第二节点(R' 给定节点和第二节点之间的第一路径以及每对第二节点之间的第二路径,其中第一和第二路径仅通过第一节点并具有。 并且如果给定节点接收到指定仅通过第二节点可达的目的地节点(D)的路由请求,则通过向简化网络拓扑添加目的地节点和第三路径来构建增强网络拓扑 目的地节点与通过第一个节点的第二个节点之间有一个可接受的直通成本; 并且在增强型网络拓扑中,将给定节点到达目的地节点的路径搜索最小化。
    • 2. 发明申请
    • OPTIMIZED DYNAMIC ROUTING IN AN OPTICAL NETWORK
    • 光网络优化动态路由
    • WO2007062670A8
    • 2008-04-03
    • PCT/EP2005012717
    • 2005-11-29
    • TELECOM ITALIA SPAD ALESSANDRO ALESSANDROMORRO ROBERTOSALMERON SANTOS VICTORIA
    • D ALESSANDRO ALESSANDROMORRO ROBERTOSALMERON SANTOS VICTORIA
    • H04J14/02
    • H04J14/0246H04J14/0257H04J14/0267H04J14/0269H04J14/0284H04Q2011/0084H04Q2011/0086
    • A routing method for a network including first type of nodes and second type of nodes, in particular a optical telecommunication network including transparent codes and regenerating nodes, comprises constructing a simplified network topology including the given node (S), t e second nodes (R i ), first paths between the given node and the second nodes and second paths between each couple of second nodes, wherein the first and second paths pass only through first nodes and have an. acceptable run-through cost, and, if the given node receives a routing request specifying a destination node (D) that is reachable only through a second node, constructing an enhanced network topology by adding to the simplified network topology the destination node and third paths between the destination nod: and the second nodes that pass only through first nodes and have an acceptable run-through cost; and searching fog a path having the lowest run-through cost from the give node to the destination node in the enhanced network topology.
    • 包括第一类型的节点和第二类型的节点,特别是包括透明代码和再生节点的光通信网络的网络的路由方法包括:构建包括给定节点(S),第二节点(R' 给定节点和第二节点之间的第一路径以及每对第二节点之间的第二路径,其中第一和第二路径仅通过第一节点并具有。 如果给定节点接收到指定仅通过第二节点可达的目的地节点(D)的路由请求,则通过向简化网络拓扑添加目的地节点和第三路径来构建增强型网络拓扑 目的地节点与通过第一个节点的第二个节点之间有一个可接受的直通成本; 并且在增强型网络拓扑中,将给定节点到达目的地节点的路径搜索最小化。