会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Device for integrating and indicating a parameter over time
    • 用于随时间整合和指示参数的设备
    • US08018347B2
    • 2011-09-13
    • US12453254
    • 2009-05-05
    • Payman TehraniMats RobertssonDavid NilssonOscar LarssonNathaniel D. RobinsonRune Groppfeldt
    • Payman TehraniMats RobertssonDavid NilssonOscar LarssonNathaniel D. RobinsonRune Groppfeldt
    • G08B17/00G09G3/28
    • G04F13/04G01K3/04H01H43/32
    • A device for integrating and indicating a parameter over, comprising: a first electrode (2), a second electrode (3), an electrolyte (5), which is in contact with the first electrode and in consuming contact with a consumption portion (6) of the second electrode, at least two indicators (I1, I2, I3), which are connected to the consumption portion (6) at a respective connecting point (P1, P2, P3). The electrolyte (5) and the consumption portion (6) are selected such that when a voltage is applied over the electrodes (2, 3), the consumption portion (6) is consumed at a predetermined rate, wherein the indicators (I1, I2, I3) are arranged to switch states in response to a consumption frontier (F1, F2) of the consumption portion reaching or passing a connecting point (P1, P2, P3) associated with the respective indicator (I1, I2, I3), wherein at least one of the indicators is a binary (on/off) indicator.
    • 一种用于整合和指示参数的装置,包括:第一电极(2),第二电极(3),电解质(5),其与第一电极接触并消耗与消耗部分(6 ),在相应的连接点(P1,P2,P3)处连接到消耗部分(6)的至少两个指示器(I1,I2,I3)。 选择电解质(5)和消耗部(6),使得当在电极(2,3)上施加电压时,消耗部分(6)以预定的速率被消耗,其中指示器(I1,I2 ,I3)被布置为响应于消费部分的消费前沿(F1,F2)到达或通过与相应指示器(I1,I2,I3)相关联的连接点(P1,P2,P3)的状态,其中 指示器中的至少一个是二进制(开/关)指示符。
    • 4. 发明申请
    • Device, kit and method for monitoring a parameter history
    • 用于监视参数历史的设备,套件和方法
    • US20080013595A1
    • 2008-01-17
    • US11806104
    • 2007-05-30
    • Payman TehraniNathaniel RobinsonDavid NilssonMagnus BerggrenPetronella Norberg
    • Payman TehraniNathaniel RobinsonDavid NilssonMagnus BerggrenPetronella Norberg
    • G01K3/00
    • G01K3/04
    • A device for determining a parameter history indication of at least one external parameter, comprises an electrode, termed “first electrode” (2, 2a, 2b, 2c), and another electrode, termed “third electrode” (4, 4a, 4b, 4c). The electrodes (2, 2a, 2b, 2c; 4, 4a, 4b, 4c) are in consuming contact with a respective electrolyte (5, 6, 6a, 6b, 6c). A consumption process of the third electrode is controllable by an amount of consumption of said first electrode. The electrolytes are so arranged that consumption rates of the first and third electrodes (2, 2a, 2b, 2c; 4, 4a, 4b, 4c) present different dependencies on the at least one external parameter. A kit of parts including such a device, and a method for determining a parameter history indication of at least one external parameter are also disclosed.
    • 用于确定至少一个外部参数的参数历史指示的装置包括称为“第一电极”(2,2a,2b,2c)的电极和称为“第三电极”(4,4)的另一个电极 a,4b,4c)。 电极(2,2a,2b,2c; 4,4a,4b,4c)与相应的电解质(5,6,6a,6b,6c)消耗接触。 第三电极的消耗过程由所述第一电极的消耗量控制。 电解质被布置成使得第一和第三电极(2,2a,2b,2c; 4,4a,4b,4c)的消耗速率对至少一个外部参数存在不同的依赖性。 还公开了一种包括这种装置的部件套件以及用于确定至少一个外部参数的参数历史指示的方法。