会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Ultrasonic measurements performed on rock cores
    • 对岩芯进行超声测量
    • US08619501B2
    • 2013-12-31
    • US12755064
    • 2010-04-06
    • Fernando Garcia-OsunaPierre Campanac
    • Fernando Garcia-OsunaPierre Campanac
    • G01V1/00G01V11/00
    • G01V1/00E21B49/06G01N29/07G01N2291/0232G01V11/005
    • One or more embodiments and methods of analyzing a formation sample with in a coring tool are disclosed herein. The methods and embodiments may include extracting a first core from a sidewall of a wellbore with a coring tool at a first depth, ultrasonically measuring a sound speed of the first core, transmitting the ultrasonically measured sound speed of the first core to a surface display unit, analyzing the ultrasonically measured sound speed in real time, determining the quality of the first core, extracting a second core at the first depth if the first core is determined to be low quality, and extracting the second core at a second depth if the core first is determined to be high quality.
    • 本文公开了在取芯工具中分析形成样品的一个或多个实施例和方法。 所述方法和实施例可以包括:从第一深度处的取芯工具从井眼的侧壁提取第一芯体,超声波地测量第一芯体的声速,将第一芯体的超声波测量的声速传输到表面显示单元 分析超声波测量的声速实时地确定第一核心的质量,如果第一核心被确定为低品质,则在第一深度处提取第二核心,并且如果核心部分提取第二核心,则在第二深度处提取第二核心 首先被确定为高品质。
    • 2. 发明授权
    • Downhole formation tester apparatus and methods
    • 井下形成试验仪器及方法
    • US08448703B2
    • 2013-05-28
    • US12619101
    • 2009-11-16
    • Simon RossPierre Campanac
    • Simon RossPierre Campanac
    • E21B49/00
    • E21B49/10
    • A method according to one or more aspects of the present disclosure comprises disposing a tool in a wellbore, the tool comprising a displacement unit for pumping a fluid at least partially through the tool, a first flowline hydraulically connected to the displacement unit through a valve network, and a second flowline hydraulically connected to the displacement unit; pumping a fluid from the first flowline to the second flowline; monitoring a pressure at a chamber of the displacement unit; and monitoring flowing pressure in the first flowline across the valve network from the displacement unit.
    • 根据本公开的一个或多个方面的方法包括将工具设置在井筒中,所述工具包括用于至少部分地泵送流体通过工具的位移单元,通过阀网络液压地连接到位移单元的第一流线 以及液压连接到所述位移单元的第二流路; 将流体从第一流线泵送到第二流线; 监测位移单元的腔室处的压力; 并且从所述位移单元监测所述第一流线中跨过所述阀网络的流动压力。
    • 3. 发明申请
    • MINIMIZATION OF CONTAMINANTS IN A SAMPLE CHAMBER
    • 在样品室中最小化污染物
    • US20140069640A1
    • 2014-03-13
    • US13609903
    • 2012-09-11
    • Yoshitake YajimaNathan LandsiedelPierre Campanac
    • Yoshitake YajimaNathan LandsiedelPierre Campanac
    • E21B49/08
    • E21B49/10
    • A formation testing apparatus and method for obtaining samples with lower levels of contaminants is provided. Such a method can remove contaminants from at fluid sample, and can include the steps of obtaining fluid, from a formation and passing a first quantity of the fluid through a sample flow line. A connection between the sample flow line and a sample chamber can he opened, and a first portion of the first quantity of the fluid can be drawn into the sample chamber via a floating piston. The first portion can be forced out of the sample chamber, and this process can be repeated until sufficient contaminants have been removed. Finally, a second portion of the first quantity of the fluid can be drawn into the sample chamber as the fluid sample.
    • 提供了一种用于获得具有较低污染物含量的样品的地层测试装置和方法。 这种方法可以从流体样品中去除污染物,并且可以包括从地层获得流体并使第一量的流体通过样品流动线的步骤。 可以打开样品流动管线和样品室之间的连接,并且第一量的流体的第一部分可以经由浮动活塞被吸入样品室。 第一部分可以被迫离开样品室,并且可以重复该过程,直到已经除去足够的污染物。 最后,第一数量的流体的第二部分可以作为流体样品被吸入样品室。
    • 9. 发明申请
    • DOWNHOLE FORMATION TESTER
    • 井下成型试验机
    • US20110114310A1
    • 2011-05-19
    • US12619101
    • 2009-11-16
    • Simon RossPierre Campanac
    • Simon RossPierre Campanac
    • E21B49/00E21B34/00
    • E21B49/10
    • A method according to one or more aspects of the present disclosure comprises disposing a tool in a wellbore, the tool comprising a displacement unit for pumping a fluid at least partially through the tool, a first flowline hydraulically connected to the displacement unit through a valve network, and a second flowline hydraulically connected to the displacement unit; pumping a fluid from the first flowline to the second flowline; monitoring a pressure at a chamber of the displacement unit; and monitoring flowing pressure in the first flowline across the valve network from the displacement unit.
    • 根据本公开的一个或多个方面的方法包括将工具设置在井筒中,所述工具包括用于至少部分地泵送流体通过工具的位移单元,通过阀网络液压地连接到位移单元的第一流线 以及液压连接到所述位移单元的第二流路; 将流体从第一流线泵送到第二流线; 监测位移单元的腔室处的压力; 并且从所述位移单元监测所述第一流线中跨过所述阀网络的流动压力。