    • 1. 发明申请
    • ONE TRIP LINER CONVEYED GRAVEL PACKING AND CEMENTING SYSTEM
    • 一次牵引式输送砂浆包装和成型系统
    • WO2006041825A3
    • 2006-06-01
    • PCT/US2005035640
    • 2005-09-30
    • HALLIBURTON ENERGY SERV INCPENNO ANDREW D
    • PENNO ANDREW D
    • E21B43/04E21B33/14
    • E21B33/14E21B43/045
    • A well completion assembly including apparatus for gravel packing and cementing in a single trip. An outer assembly (28) comprises: a liner and screen; a valved gravel packing port; upper and lower valved cementing ports; and seal bores positioned below and above the gravel packing port and above and below the lower cementing port. An inner assembly (30) includes: a crossover having an outer seal body and shifters to allow opening and closing of valves in the gravel packing and cementing ports. In one position, the crossover seal body mates with seal bores below and above the gravel packing port to allow flow of gravel packing slurry through the gravel packing port. In a second position, the crossover seal body mates with seal bores below and above the lower cementing port to allow flow of cement through the lower cementing port.
    • 一个完井组件,包括一次砾石包装和固井装置。 外部组件(28)包括:衬里和屏幕; 有砾石填料口; 上,下阀门固井口; 以及位于砾石填充口下方和上方以及下部固井口上方和下方的密封孔。 内部组件(30)包括:具有外部密封体和换档器的交叉口,以允许打开和关闭砾石包装和固井口中的阀。 在一个位置,交叉密封体与砾石填充口下方和上方的密封孔配合,以允许砾石填充浆液流过砾石填料口。 在第二位置,交叉密封体与下部固井口下方和上方的密封孔配合,以允许水泥通过下部固井口。
    • 3. 发明申请
    • ONE TRIP LINER CONVEYED GRAVEL PACKING AND CEMENTING SYSTEM
    • 一次牵引式输送砂浆包装和成型系统
    • WO2006041825A2
    • 2006-04-20
    • PCT/US2005/035640
    • 2005-09-30
    • HALLIBURTON ENERGY SERVICES, INC.PENNO, Andrew, D.
    • PENNO, Andrew, D.
    • E21B43/04E21B33/14
    • E21B33/14E21B43/045
    • A well completion assembly including apparatus for gravel packing and cementing in a single trip. An outer assembly comprises: a liner and screen; a valved gravel packing port; upper and lower valved cementing ports; and seal bores positioned below and above the gravel packing port and above and below the lower cementing port. An inner assembly includes: a crossover having an outer seal body and shifters to allow opening and closing of valves in the gravel packing and cementing ports. In one position, the crossover seal body mates with seal bores below and above the gravel packing port to allow flow of gravel packing slurry through the gravel packing port. In a second position, the crossover seal body mates with seal bores below and above the lower cementing port to allow flow of cement through the lower cementing port.
    • 一个完井组件,包括一次砾石包装和固井装置。 外部组件包括:衬里和屏幕; 有砾石填料口; 上,下阀门固井口; 以及位于砾石填充口下方和上方以及下部固井口上方和下方的密封孔。 内部组件包括:具有外部密封体和换档器的交叉口,以允许打开和关闭砾石包装和固井口中的阀。 在一个位置,交叉密封体与砾石填充口下方和上方的密封孔配合,以允许砾石填充浆液流过砾石填料口。 在第二位置,交叉密封体与下部固井口下方和上方的密封孔配合,以允许水泥通过下部固井口。
    • 7. 发明申请
    • METHODS OF RELEASING AT LEAST ONE TUBING STRING BELOW A BLOW-OUT PREVENTER
    • 在一个吹出的预防器下方的一个管道中释放的方法
    • WO2012134514A1
    • 2012-10-04
    • PCT/US2011/048784
    • 2011-08-23
    • HALLIBURTON ENERGY SERVICES, INC.ROANE, Thomas, O.PENNO, Andrew, D.BOURGNEUF, Patrick, P.
    • ROANE, Thomas, O.PENNO, Andrew, D.BOURGNEUF, Patrick, P.
    • E21B33/06
    • E21B33/06E21B19/00E21B29/00E21B29/08E21B33/03E21B33/063
    • According to an embodiment, a method of controlling a blowout comprises: releasing at least a first tubing string into a portion of a well system, wherein the step of releasing comprises activating a release table; and causing or allowing a blowout preventer to close. According to another embodiment, the methods further comprise: compressing at least a portion of a second tubing string and a third tubing string together, wherein the step of compressing comprises activating a crimping device; cutting through the wall of at least a third tubing string, wherein the step of cutting comprises activating a cutting device, and wherein the step of cutting is performed after the step of compressing; and releasing at least the second tubing string and the third tubing string into a portion of a well system, wherein the step of releasing comprises activating a release table, and wherein the step of releasing at least the second and third tubing strings is performed after the step of cutting.
    • 根据实施例,一种控制井喷的方法包括:将至少第一油管柱释放到井系统的一部分中,其中所述释放步骤包括激活释放台; 并使防喷器关闭。 根据另一个实施例,所述方法还包括:将第二管柱和第三管柱的至少一部分压缩在一起,其中压缩步骤包括启动压接装置; 切割至少第三管柱的壁,其中所述切割步骤包括启动切割装置,并且其中在所述压缩步骤之后执行所述切割步骤; 以及将至少所述第二管柱和所述第三管柱排放到井系统的一部分中,其中所述释放步骤包括启动释放台,并且其中至少释放所述第二和第三管柱的步骤在 切割的一步。