会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • Systems and Methods for Performing Islanding Operations
    • 执行岛屿运作的制度和方法
    • US20130054038A1
    • 2013-02-28
    • US13222227
    • 2011-08-31
    • Gerardo VarillasErhan KaracaJoel HoltDavid Fischer
    • Gerardo VarillasErhan KaracaJoel HoltDavid Fischer
    • G06F1/26
    • H02J13/0017H02J3/38H02J2003/388Y02B90/2607Y02E40/72Y04S10/12Y04S40/12
    • Systems and methods for performing islanding operations are usable to monitor and collect plant loads and turbine loads of a power plant. Such monitoring and collecting can be used to preemptively determine islanding configurations. According to one embodiment of the invention, a system can be provided. The system can be operable to receive power generation unit information, receive power plant information of the power plant, determine an islanding configuration for the power plant, transmit the islanding configuration to the at least one power generation unit of the power plant, receive breaker status information of at least one breaker coupled to the at least one power generation unit of the power plant and for all breakers connecting power plant to an external grid, and control at least one power generation unit of the power plant.
    • 用于执行孤岛作战的系统和方法可用于监测和收集发电厂的工厂负荷和涡轮机负荷。 这种监视和收集可用于抢先确定孤岛配置。 根据本发明的一个实施例,可以提供一种系统。 该系统可以用于接收发电单元信息,接收发电厂的发电厂信息,确定发电厂的孤岛配置,将孤岛配置发送到发电厂的至少一个发电单元,接收断路器状态 耦合到发电厂的至少一个发电单元的至少一个断路器的信息以及将发电厂连接到外部电网的所有断路器的信息,以及控制发电厂的至少一个发电单元。
    • 2. 发明授权
    • Systems and methods for performing islanding operations
    • 用于执行孤岛作战的系统和方法
    • US08818565B2
    • 2014-08-26
    • US13222227
    • 2011-08-31
    • Erhan KaracaGerardo VarillasJoel HoltDavid Fischer
    • Erhan KaracaGerardo VarillasJoel HoltDavid Fischer
    • G05D11/00G01R21/00
    • H02J13/0017H02J3/38H02J2003/388Y02B90/2607Y02E40/72Y04S10/12Y04S40/12
    • Systems and methods for performing islanding operations are usable to monitor and collect plant loads and turbine loads of a power plant. Such monitoring and collecting can be used to preemptively determine islanding configurations. According to one embodiment of the invention, a system can be provided. The system can be operable to receive power generation unit information, receive power plant information of the power plant, determine an islanding configuration for the power plant, transmit the islanding configuration to the at least one power generation unit of the power plant, receive breaker status information of at least one breaker coupled to the at least one power generation unit of the power plant and for all breakers connecting power plant to an external grid, and control at least one power generation unit of the power plant.
    • 用于执行孤岛作战的系统和方法可用于监测和收集发电厂的工厂负荷和涡轮机负荷。 这种监视和收集可用于抢先确定孤岛配置。 根据本发明的一个实施例,可以提供一种系统。 该系统可以用于接收发电单元信息,接收发电厂的发电厂信息,确定发电厂的孤岛配置,将孤岛配置发送到发电厂的至少一个发电单元,接收断路器状态 耦合到发电厂的至少一个发电单元的至少一个断路器的信息以及将发电厂连接到外部电网的所有断路器的信息,以及控制发电厂的至少一个发电单元。