会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Downhole impact generator and method for use of same
    • 井下冲击发生器及其使用方法
    • US07367397B2
    • 2008-05-06
    • US11326229
    • 2006-01-05
    • Jack G. ClemensJerry C. FosterRobert L. Thurman
    • Jack G. ClemensJerry C. FosterRobert L. Thurman
    • E21B31/107
    • E21B31/107
    • A downhole impact generator (60) is adapted to be moved to a target location within a wellbore (68) for transmitting a jarring force to a well tool (72) positioned in the wellbore (68). The downhole impact generator (60) includes a downhole power unit (62) having a moveable shaft (66) and a jarring tool (64). The jarring tool (64) is operably engageable with the well tool (72) and is operably coupled with the moveable shaft (66) of the downhole power unit (62) such that when the jarring tool (64) is operably engaged with the well tool (72), linear movement of the moveable shaft (66) energizes the jarring tool (64) such that a jarring force can be transmitted by the jarring tool (64) to the well tool (72).
    • 井下冲击发生器(60)适于移动到井筒(68)内的目标位置,用于将刺激力传递到定位在井眼(68)中的井具(72)。 井下冲击发生器(60)包括具有可移动轴(66)和刺耳工具(64)的井下动力单元(62)。 刺耳工具(64)可操作地与井工具(72)接合,并且与井下动力单元(62)的可动轴(66)可操作地联接,使得当震动工具(64)可操作地与井 工具(72)中,可移动轴(66)的线性运动使振动工具(64)通电,使得刺激力可以被刺激工具(64)传递到井具(72)。
    • 3. 发明授权
    • Real-time management system for slickline/wireline
    • 钢丝绳/线缆的实时管理系统
    • US07775100B2
    • 2010-08-17
    • US12239290
    • 2008-09-26
    • Orlando De JesusRichard MineoJerry C. FosterSyed Hamid
    • Orlando De JesusRichard MineoJerry C. FosterSyed Hamid
    • G01L5/00
    • G01L5/047E21B19/22
    • A real-time line management system and associated methods. A line management system for use in conjunction with an operation in a subterranean well includes a line installed in the well during the operation, and a computing device which indicates a used life of the line during the operation. A method of managing a line used in an operation in a subterranean well includes the steps of: installing the line in the well during the operation; and determining a used life of the line while the line is installed in the well. A method of managing a line used in multiple operations in one or more subterranean wells includes the steps of: estimating conditions which will be experienced by the line during a future operation; and predicting before the future operation what a used life of the line will be after the line is used in the future operation.
    • 实时线路管理系统及相关方法。 与地下井中的操作一起使用的线路管理系统包括在操作期间安装在井中的线以及指示在操作期间线路的使用寿命的计算设备。 一种管理在地下井中的操作中使用的管线的方法包括以下步骤:在操作期间将管线安装在井中; 并且在将线安装在井中时确定线的使用寿命。 一种管理在一个或多个地下井中的多个操作中使用的管线的方法包括以下步骤:估计将来操作期间该管线将经历的条件; 并在未来的运营前预测该线路的使用寿命将在将来运行后使用。