会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Washing device
    • 洗衣设备
    • JP2008297789A
    • 2008-12-11
    • JP2007144522
    • 2007-05-31
    • Gijutsu Kaihatsu Kenkyusho:KkHokuriku Public Maintenance KkJapan Bridge Engineering Center北陸パブリックメンテナンス 株式会社株式会社技術開発研究所財団法人 海洋架橋・橋梁調査会
    • AKIYAMA KAZUOYOSHIDA KOICHI
    • E01H3/02E01D22/00
    • PROBLEM TO BE SOLVED: To provide an epoch-making washing device capable of easily, inexpensively, and well washing, for example, bridges.
      SOLUTION: This washing device comprises a water supply hose 4 having a submerged pump 3 at the front end and a water storage part 5 for storing the water supplied through the water supply hose 4. During the washing, a predetermined amount of water is stored in the water storage part 5 and a high-pressure pump 1 is driven to supply a predetermined amount of water from the water stored part 5 in which a predetermined amount of water is stored beforehand to the high-pressure pump 1 even if the supplied amount of water through the water supply hose 4 is increased or decreased. Therefore, the idle driving of the high-pressure pump 1 is prevented from occurring. A filter part 6 for removing impurities from the water is installed in the water supply passage from the water supply hose 4 to the portion where water is supplied to the high-pressure pump 1 through the water storage part 5. The water supply hose 4 is set longer so as to be suspended from the upper part of the bridge toward a river under the bridge and the submerged pump 3 at the end and submerged in the river.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供能够容易地,廉价地和良好地洗涤例如桥的划时代的洗涤装置。 解决方案:该洗涤装置包括在前端具有浸没泵3的供水软管4和用于储存通过供水软管4供应的水的储水部分5.在洗涤期间,将预定量的水 被储存在储水部5中,高压泵1被驱动,从预定量的水储存部5预先向高压泵1供给预定量的水,即使 通过供水软管4供给的水量增加或减少。 因此,能够防止发生高压泵1的怠速驾驶。 用于从水中除去杂质的过滤器部分6安装在从供水软管4到水通过储水部分5向高压泵1供水的部分的供水通道中。供水软管4是 设置较长,以便从桥梁的上部向桥下的河流悬挂,并将尾水泵3淹没在河流中。 版权所有(C)2009,JPO&INPIT
    • 2. 发明专利
    • Construction method for pedestal concrete
    • 沥青混凝土施工方法
    • JP2008075245A
    • 2008-04-03
    • JP2006252124
    • 2006-09-19
    • Japan Bridge Engineering CenterKajima Corp財団法人 海洋架橋・橋梁調査会鹿島建設株式会社
    • FUCHITA MASANOBUYOSHIHARA TOMOYOSHIKONDO HISAOIWAMURA HIDEYOSHINOHARA NOZOMIHATA TERUMICHISAITO ISAOYASUNORI MASAMICHI
    • E02D23/02
    • PROBLEM TO BE SOLVED: To provide a construction method for pedestal concrete, which enables the economical construction of the pedestal concrete with a flat upper surface by considerably omitting underwater work by a diver, without the use of large-sized equipment.
      SOLUTION: A pedestal concrete form 5, in which a level measuring instrument, a level adjusting jack 9, a positioning winch 7 and a truss 17 are installed, is installed on the bottom 3 of the water while the positioning winch 7 is operated. The form 5 is positioned in a height direction by the jack 9 on the basis of data of the level measuring instrument. Subsequently, the pedestal concrete 43a and the pedestal concrete 43b are sequentially injected into the form 5 from an upper end of a sleeve pipe 22 which is exposed on the water, so as to form a pedestal 44. After that, the sleeve pipe 22 and the truss 17 are removed from the pedestal 44, and a caisson 45 is installed on the pedestal 44.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种基座混凝土的施工方法,其能够通过在不使用大型设备的情况下,潜水员大大省略水下作业,从而经济地构造具有平坦的上表面的基座混凝土。 解决方案:在定位绞盘7为水平面的情况下,将水平测量仪器,液位调节千斤顶9,定位绞盘7和桁架17安装在底座3上的基座混凝土结构5 操作。 基于电平测量仪器的数据,通过插孔9将形式5定位在高度方向。 随后,将底座混凝土43a和底座混凝土43b从暴露在水中的套筒管22的上端依次注入到模型5中,以形成基座44.之后,套管22和 桁架17从基座44移除,沉箱45安装在底座44上。版权所有(C)2008,JPO&INPIT