    • 1. 发明授权
    • Method and device for fault detection in transformers or power lines
    • 变压器或电力线路故障检测方法和装置
    • US07812615B2
    • 2010-10-12
    • US10585123
    • 2004-12-22
    • Zoran GajicIvo Brncic
    • Zoran GajicIvo Brncic
    • G01R31/06G01R31/08H02H7/04H02H3/26
    • H02H7/045G01R31/027H02H3/286
    • A method for fault detection in a power transformer/autotransformer and/or interconnected power lines, which are within the zone protected by the differential protection, and particularly suitable for detecting turn-to-turn faults in power transformer/autotransformer windings. All individual instantaneous phase currents of the protected object are measured, individual phase currents as fundamental frequency phasors are calculated, the contributions of the individual protected object sides negative sequence currents to the total negative sequence differential current are calculated by compensating for the phase shift of an eventual power transformer within the protected zone, the relative positions of the compensated individual sides negative sequence currents in the complex plane are compared, in order to determine whether the source of the negative sequence currents, i.e. the fault position, is within the protected zone or outside of the protected zone, delimited with current transformer locations, the protected object is disconnected if determined that the source of the negative sequence currents is within the protected zone.
    • 一种用于电力变压器/自耦变压器和/或互连电力线路中的故障检测的方法,该电力变压器/互连电力线路在由差动保护器保护的区域内,并且特别适用于检测电力变压器/自耦变压器绕组中的匝间故障。 测量受保护物体的所有单个瞬时相电流,计算作为基频相位的单相电流,通过补偿相对于相位偏移的相移来计算单个受保护对象侧负序电流对总负序差动电流的贡献 比较保护区内最终的电源变压器,比较复平面中补偿的各个侧负序电流的相对位置,以便确定负序电流的源,即故障位置是否在保护区内,或 在受保护区之外,用当前的变压器位置定界,如果确定负序电流的源在保护区内,受保护物体将断开。
    • 3. 发明申请
    • Method And Device For Fault Detection In Transformers Or Power Lines
    • 变压器或电力线路故障检测方法与装置
    • US20080130179A1
    • 2008-06-05
    • US10585123
    • 2004-12-22
    • Zoran GajicIvo Brncic
    • Zoran GajicIvo Brncic
    • H02H7/045G01R31/08
    • H02H7/045G01R31/027H02H3/286
    • A method for fault detection in a power transformer/autotransformer and/or interconnected power lines, which are within the zone protected by the differential protection, and particularly suitable for detecting turn-to-turn faults in power transformer/autotransformer windings. All individual instantaneous phase currents of the protected object are measured, individual phase currents as fundamental frequency phasors are calculated, the contributions of the individual protected object sides negative sequence currents to the total negative sequence differential current are calculated by compensating for the phase shift of an eventual power transformer within the protected zone, the relative positions of the compensated individual sides negative sequence currents in the complex plane are compared, in order to determine whether the source of the negative sequence currents, i.e. the fault position, is within the protected zone or outside of the protected zone, delimited with current transformer locations, the protected object is disconnected if determined that the source of the negative sequence currents is within the protected zone.
    • 一种用于电力变压器/自耦变压器和/或互连电力线路中的故障检测的方法,该电力变压器/互连电力线路在由差动保护器保护的区域内,并且特别适用于检测电力变压器/自耦变压器绕组中的匝间故障。 测量受保护物体的所有单个瞬时相电流,计算作为基频相位的单相电流,通过补偿相对于相位偏移的相移来计算单个受保护对象侧负序电流对总负序差动电流的贡献 比较保护区内最终的电源变压器,比较复平面中补偿的各个侧负序电流的相对位置,以便确定负序电流的源,即故障位置是否在保护区内,或 在受保护区之外,用当前的变压器位置定界,如果确定负序电流的源在保护区内,受保护物体将断开。
    • 4. 发明授权
    • Method and system for disconnecting a generator from a power system
    • 将发电机与电力系统断开的方法和系统
    • US08970071B2
    • 2015-03-03
    • US13788642
    • 2013-03-07
    • Ivo BrncicSoren Forsman
    • Ivo BrncicSoren Forsman
    • H01H47/00H02H3/02H02H3/48H02H7/06H02J3/38
    • H02H3/021H02H3/48H02H7/06H02J3/38H02J2003/388Y10T307/826
    • A method for disconnecting a generator from a power system when the generator and the thereto connected power system are non-synchronized. The method includes the steps of: determining that there is a loss of synchronization between the generator and the power system, which loss of synchronization provides an amplitude variation of an electrical parameter associated with the generator. The method further includes determining when a minimum amplitude of the electrical parameter will occur, wherein when the occurrence of the minimum amplitude has been predicted, providing a command signal for disconnecting the generator from the power system, wherein the command signal is provided prior to the minimum amplitude of the electrical parameter is attained, and disconnecting the generator from the power system approximately when the determined minimum amplitude of the electrical parameter occurs. It is also presented a protection system for a generator in a power system.
    • 一种当发电机和其连接的电力系统不同步时,将发电机与电力系统断开的方法。 该方法包括以下步骤:确定发电机和电力系统之间存在同步丢失,同步丢失提供与发电机相关联的电参数的幅度变化。 该方法还包括确定何时将发生电参数的最小幅度,其中当已经预测出最小幅度的出现时,提供用于将发生器与电力系统断开的命令信号,其中,命令信号在 达到电参数的最小幅度,并且在发生电参数的确定的最小幅度时,近似地将发电机与电力系统断开。 它还提供了电力系统中发电机的保护系统。
    • 5. 发明申请
    • Method And System For Disconnecting A Generator From A Power System
    • 从电力系统断开发电机的方法和系统
    • US20130257178A1
    • 2013-10-03
    • US13788642
    • 2013-03-07
    • Ivo BrncicSoren Forsman
    • Ivo BrncicSoren Forsman
    • H02H3/02
    • H02H3/021H02H3/48H02H7/06H02J3/38H02J2003/388Y10T307/826
    • A method for disconnecting a generator from a power system when the generator and the thereto connected power system are non-synchronized. The method includes the steps of: determining that there is a loss of synchronization between the generator and the power system, which loss of synchronization provides an amplitude variation of an electrical parameter associated with the generator. The method further includes determining when a minimum amplitude of the electrical parameter will occur, wherein when the occurrence of the minimum amplitude has been predicted, providing a command signal for disconnecting the generator from the power system, wherein the command signal is provided prior to the minimum amplitude of the electrical parameter is attained, and disconnecting the generator from the power system approximately when the determined minimum amplitude of the electrical parameter occurs. It is also presented a protection system for a generator in a power system.
    • 一种当发电机和其连接的电力系统不同步时,将发电机与电力系统断开的方法。 该方法包括以下步骤:确定发电机和电力系统之间存在同步丢失,同步丢失提供与发电机相关联的电参数的幅度变化。 该方法还包括确定何时将发生电参数的最小幅度,其中当已经预测出最小幅度的出现时,提供用于将发生器与电力系统断开的命令信号,其中,命令信号在 达到电参数的最小幅度,并且在发生电参数的确定的最小幅度时,近似地断开发电机与电力系统的连接。 它还提供了电力系统中发电机的保护系统。