会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Earth fill retaining wall system and method
    • 填土挡土墙系统及方法
    • US08246274B1
    • 2012-08-21
    • US12552930
    • 2009-09-02
    • H. Carl HallHoward Carl Hall
    • H. Carl HallHoward Carl Hall
    • E02D29/02
    • E02D17/20
    • An earth fill retaining wall system that uses a removable L-shaped bracket and one or more support boards that temporarily holds the front surface of a mesh cover panel vertical aligned while backfilled with fill material. The brackets hold the mesh cover panel until tiers are stacked above. The weight of the stack tiers are used to hold the mesh cover panel on each lower tier in place. Once the above stacked tiers are formed, the brackets can be removed and reused. Attached to the lower end of the post and extending in the opposite direction of the base is an optional support shoe. A hole is formed in the shoe that receives a vertical stake or pin driven into the ground to temporarily hold the bracket in place. Attached to the post is a loop that attaches to a chain or cable used to pull the bracket forward.
    • 一种填土挡土墙系统,其使用可拆卸的L形支架和一个或多个支撑板,其暂时保持网盖的前表面垂直对准,同时填充填充材料。 支架握住网罩,直到层叠在上面。 堆叠层的重量用于将每个下层的网盖面板保持在适当位置。 一旦形成了上述堆叠层,就可以去除和重新使用托架。 附着在柱的下端并沿基座的相反方向延伸的是可选的支撑鞋。 在鞋中形成一个孔,该孔容纳被驱动到地面中的垂直桩或销,以暂时将托架保持在适当的位置。 附在柱子上的是一个环,用于将支架向前拉的链条或电缆。