会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明授权
    • Condensation system for power plant
    • 发电厂冷凝系统
    • US4434620A
    • 1984-03-06
    • US393335
    • 1982-06-29
    • Hitoshi IshimaruYoji NagaiToyohiko Masuda
    • Hitoshi IshimaruYoji NagaiToyohiko Masuda
    • F01K9/00F22D11/00F28B9/08F01K19/00
    • F22D11/006
    • A condensation system for use in a power plant including a steam generator and steam turbine comprises at least one side stream condenser. The side stream condenser defines therein first and second hot wells with the first hot well receiving therein condensate produced by condensing steam exhausted from the steam turbine. A condensate pump device forcibly delivers the condensate through a condensate feed line having one end thereof connected to the first hot well and the other end communicating with the second hot well. A first purification device is provided in the condensate feed line to remove impurities from the condensate flowing therethrough. A main condensate pump device forcibly delivers the condensate through a main condensate feed line having one end thereof communicating with the condensate feed line and the other end connected to the steam generator. A second purification device is provided in the main condensate feed line downstream of the main condensate pump device, for removing impurities from the condensate introduced into the steam generator through the main condensate feed line.
    • 一种用于包括蒸汽发生器和蒸汽轮机的发电厂的冷凝系统包括至少一个侧流冷凝器。 侧流冷凝器在其中限定第一和第二热井,其中第一热井容纳通过冷凝从蒸汽轮机排出的蒸汽而产生的冷凝物。 冷凝水泵装置强制地将冷凝物输送通过冷凝水进料管线,冷凝水进料管线的一端连接到第一热水井,另一端连通第二热井。 第一净化装置设置在冷凝物进料管线中以从流过其中的冷凝水中除去杂质。 主冷凝水泵装置强制地将冷凝水输送通过主冷凝水进料管,其主端与冷凝液进料管连通,另一端与蒸汽发生器相连。 第二净化装置设置在主冷凝水泵装置下游的主冷凝水进料管线中,用于通过主冷凝物进料管线从引入蒸汽发生器的冷凝物中除去杂质。
    • 4. 发明授权
    • Condensation system for power plant
    • 发电厂冷凝系统
    • US4365476A
    • 1982-12-28
    • US199667
    • 1980-10-22
    • Toyohiko MasudaTakeshi UenoYoji NagaiHitoshi IshimaruShozo Nakamura
    • Toyohiko MasudaTakeshi UenoYoji NagaiHitoshi IshimaruShozo Nakamura
    • G05B9/02B01D5/00F01K9/00F22D11/00F28B11/00F22D5/00
    • B01D5/009B01D5/0051F22D11/006
    • Condensation system for use in a power plant. The condensate system includes side stream condenser defining therein first and second hot wells. Condensate is delivered from the first to second hot well through a condensate feed line. Condensate is introduced from the condensate feed line into a tank through a first spill-over line. Condensate is supplied from the second hot well to the power plant through a main condensate feed line. Condensate is introduced from the main condensate feed line into the tank through a second spill-over line. Actuator is operative in response to signal from a level detector detecting level of condensate in the first hot well, to regulate opening degree of a supplementary feed valve in the supplementary feed line, to close one of first and second spill-over valves in the first and second spill-over lines, respectively, and to open the other spill-over valve.
    • 用于发电厂的冷凝系统 冷凝系统包括在其中限定第一和第二热井的侧流冷凝器。 冷凝水从第一至第二热井通过冷凝水进料管线输送。 冷凝物从冷凝水进料管线通过第一溢出管线引入罐中。 冷凝水从第二个热水口通过主冷凝水进料管道供应给发电厂。 冷凝物从主冷凝水进料管线通过第二个溢出管线引入罐中。 致动器响应于来自水平检测器的信号而检测器检测到第一热阱中的冷凝物的水平,以调节补充进料管线中的补充进料阀的开度,以关闭第一和第二溢流阀中的第一溢流阀 和第二溢出管线,并打开另一个溢出阀。
    • 7. 发明授权
    • Drain recovery system for condensate feedwater system of nuclear power
plant
    • 核电站冷凝水给水系统排水回收系统
    • US4713209A
    • 1987-12-15
    • US852315
    • 1986-04-15
    • Hitoshi IshimaruToshiki Kobayashi
    • Hitoshi IshimaruToshiki Kobayashi
    • F22D1/32G21D1/02G21D5/12G21C7/32
    • G21D5/12G21D1/02Y02E30/40
    • A drain recovery system for the condensate feedwater system of a nuclear power plant having condensate pumps for boosting the condensate from a condenser, and feedwater heaters for heating the condensate from the condensate pumps. The drain recovery system is provided with drain pumping-up recovery having a drain tank for storing a feedwater heater drain, and drain pumps connected to the drain tank for pumping up the drain therein to inject it into said condensate feedwater system at a predetermined portion thereof, and drain level control device having a conduit connected between a portion of the drain pumping-up recovery system upstream of the drain pumps and a portion of the condensate feedwater system upstream of the condensate pumps for causing the drain in the drain tank to be returned to the portion upstream of the condensate pumps by a pressure differential therebetween so as to maintain a drain level in the drain tank at a predetermined position when the plant operates at a low load level or the drain pumps malfunction.
    • 用于具有用于从冷凝器提升冷凝物的冷凝水泵的核电站的冷凝水给水系统的排水回收系统以及用于从冷凝水泵加热冷凝物的给水加热器。 排水回收系统具有排水排空回收装置,其具有用于储存给水加热器排水的排水箱,以及连接到排水箱的排水泵,用于向其排出排水口,以将其排出到其预定部分的所述冷凝水给水系统 和排水平面控制装置,其具有连接在排水泵上游的排水泵送回收系统的一部分和冷凝水泵上游的冷凝物给水系统的一部分之间的导管,用于使排水箱中的排水口返回 通过它们之间的压力差到冷凝水泵的上游部分,以便当设备在低负载水平下操作或排水泵故障时,将排水槽中的排放水平保持在预定位置。