会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 9. 发明申请
    • HYBRID SWITCHED MODE AMPLIFIER
    • 混合开关模式放大器
    • WO2017127353A1
    • 2017-07-27
    • PCT/US2017/013756
    • 2017-01-17
    • CIRRUS LOGIC INTERNATIONAL SEMICONDUCTOR, LTD.HE, Zhaohui
    • HE, ZhaohuiKING, Eric J.MARU, SiddharthMELANSON, John L.
    • H03F3/217
    • H03F3/217H03F1/04H03F1/34H03F3/185H03F3/2171H03F3/2173H03F3/45475H03F2200/351H03F2200/432H03F2203/45034H04R3/12H04R2420/03
    • A switching power stage for producing a load voltage may include a first processing path having a first output, a second processing path having a second output, a first plurality of switches comprising at least a first switch coupled between the first output and a first load terminal and a second switch coupled between the first output and the second load terminal, a second plurality of switches comprising at least a third switch coupled between the second output and the first load terminal and a fourth switch coupled between the second output and the second load terminal, and a controller configured to control switches in order to generate the load voltage as a function of an input signal such that one of the first switch and the second switch operates in a linear region of operation and one of the third switch and the fourth switch operates in a saturated region of operation for a predominance of a dynamic rage of the load voltage.
    • 用于产生负载电压的开关功率级可以包括具有第一输出的第一处理路径,具有第二输出的第二处理路径,包括至少第一开关的第一多个开关,所述第一开关耦合在 所述第一输出以及耦合在所述第一输出和所述第二负载端子之间的第一开关和第二开关;第二开关,所述第二开关包括耦合在所述第二输出和所述第一负载端子之间的至少第三开关;以及第四开关, 所述第二输出和所述第二负载端子以及控制器,所述控制器被配置为控制开关以便根据输入信号产生所述负载电压,使得所述第一开关和所述第二开关中的一个在线性工作区域中操作,并且一个 第三开关和第四开关的操作在饱和操作区域内对于负载电压的动态范围占主导地位。
    • 10. 发明申请
    • PRIMARY-SIDE CONTROL OF A SWITCHING POWER CONVERTER WITH FEED FORWARD DELAY COMPENSATION
    • 具有进给延迟补偿的开关电源转换器的主侧控制
    • WO2012167161A1
    • 2012-12-06
    • PCT/US2012/040564
    • 2012-06-01
    • CIRRUS LOGIC, INC.HE, ZhaohuiGRISAMORE, Robert T.KOST, Michael A.
    • HE, ZhaohuiGRISAMORE, Robert T.KOST, Michael A.
    • H05B33/08
    • H05B33/0815Y02B20/346
    • An electronic system includes controller to control a switching power converter to provide power to a load. To control the amount of power provided to the load, in at least one embodiment, the controller senses a current value representing a current in the switching power converter and detects when the current value reaches a target peak value. However, due to delays in the controller and/or the switching power converter, the detected target peak value will not be the actual current peak value generated by the switching power converter. In at least one embodiment, the controller adjusts the detected target peak value with a post-detection delay compensation factor to generate a delay compensated current value that more accurately represents an actual peak current value associated with the current in the switching power converter.
    • 电子系统包括控制器以控制开关功率转换器以向负载提供电力。 为了控制提供给负载的功率量,在至少一个实施例中,控制器感测表示开关功率转换器中的电流的电流值,并检测当前值何时达到目标峰值。 然而,由于控制器和/或开关功率转换器的延迟,检测到的目标峰值将不是由开关功率转换器产生的实际电流峰值。 在至少一个实施例中,控制器利用检测后延迟补偿因子调整检测到的目标峰值,以产生更精确地表示与开关功率转换器中的电流相关联的实际峰值电流值的延迟补偿电流值。