会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • Turbine blade
    • 涡轮叶片
    • US08387388B2
    • 2013-03-05
    • US12521589
    • 2007-12-19
    • Stefan GlosMatthias HeueErnst-Wilhelm PfitzingerNorbert Pieper
    • Stefan GlosMatthias HeueErnst-Wilhelm PfitzingerNorbert Pieper
    • F01K13/02F01K7/34
    • F01K13/02
    • The invention relates to a method for increasing the steam mass flow of a high-pressure steam turbine of a steam power plant, particularly a steam power plant including reheating, during a start-up phase of the steam power plant, particularly also during an idle period of the steam power plant, wherein at least one electric consumer is connected upstream of a generator of the steam power plant before synchronization with a power supply grid. The invention further relates to a steam power plant, comprising a generator, a high-pressure steam turbine, and at least one electric consumer, which can also be connected during a start-up phase of the steam power plant, particularly also during an idle period of the steam power plant, in order to increase a steam mass flow of the high-pressure steam turbine before a synchronization process of the generator with a power supply grid.
    • 本发明涉及一种用于在蒸汽发电厂的起动阶段,特别是在空闲期间,增加蒸汽动力装置的高压汽轮机(特别是包括再加热的蒸汽动力装置)的蒸汽质量流量的方法 所述蒸汽发电厂的至少一个电力消耗器在与电源网格同步之前连接在所述蒸汽发电厂的发电机的上游。 本发明还涉及一种蒸汽动力装置,其包括发电机,高压蒸汽轮机和至少一个电力消耗器,其也可以在蒸汽发电厂的起动阶段期间连接,特别是在空转期间 在蒸汽发电厂的时间段内,为了在具有电力供电电网的发电机的同步处理之前增加高压蒸汽轮机的蒸汽质量流量。
    • 4. 发明申请
    • Turbine blade
    • 涡轮叶片
    • US20100313564A1
    • 2010-12-16
    • US12521589
    • 2007-12-19
    • Stefan GlosMatthias HeueErnst-Wilhelm PfitzingerNorbert Pieper
    • Stefan GlosMatthias HeueErnst-Wilhelm PfitzingerNorbert Pieper
    • F01K13/00
    • F01K13/02
    • The invention relates to a method for increasing the steam mass flow of a high-pressure steam turbine of a steam power plant, particularly a steam power plant including reheating, during a start-up phase of the steam power plant, particularly also during an idle period of the steam power plant, wherein at least one electric consumer is connected upstream of a generator of the steam power plant before synchronization with a power supply grid. The invention further relates to a steam power plant, comprising a generator, a high-pressure steam turbine, and at least one electric consumer, which can also be connected during a start-up phase of the steam power plant, particularly also during an idle period of the steam power plant, in order to increase a steam mass flow of the high-pressure steam turbine before a synchronization process of the generator with a power supply grid.
    • 本发明涉及一种用于在蒸汽发电厂的起动阶段,特别是在空闲期间,增加蒸汽动力装置的高压汽轮机(特别是包括再加热的蒸汽动力装置)的蒸汽质量流量的方法 所述蒸汽发电厂的至少一个电力消耗器在与电源网格同步之前连接在所述蒸汽发电厂的发电机的上游。 本发明还涉及一种蒸汽动力装置,其包括发电机,高压蒸汽轮机和至少一个电力消耗器,其也可以在蒸汽发电厂的起动阶段期间连接,特别是在空转期间 在蒸汽发电厂的时间段内,为了在具有电力供电电网的发电机的同步处理之前增加高压蒸汽轮机的蒸汽质量流量。