会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • Feed assembly for overhead strapper
    • 进料组件用于架空吊带
    • US20050211111A1
    • 2005-09-29
    • US10999084
    • 2004-11-29
    • Rainer RopersCalvin KaselJames RobertsDonna RobertsJoseph Ream
    • Rainer RopersCalvin KaselJames RobertsDonna RobertsJoseph Ream
    • B65B13/06B65B13/18B65B59/04B65B13/04
    • B65B13/06B65B13/185B65B59/04
    • An overhead strapper is of the type for feeding a strapping material around a load, positioning, tensioning and sealing the strapping material around the load. The strapping machine includes a frame, an upper horizontally oriented platen mounted to the frame for vertical movement along the frame a modular strapping head mounted to and movable with the platen and a modular feed head mounted to the frame, spaced from the strapping head. A strap guide is mounted in part to the frame and in part to the platen. The strap guide provides a varying length pathway from the feed head to the strapping head. A strap chute is mounted to the frame. Strap material is fed into the strapping machine through the feed head, through the guide and into the strapping head. The strap traverses through the strapping head into the strap chute and back to the strapping head for retraction, tensioning and sealing to itself. The guide includes a vertically extending portion having a varying height strap path dependent upon the vertical position of the upper horizontally oriented platen.
    • 架空绑带是用于将捆扎材料围绕负载供给的方式,定位,张紧和密封捆扎材料在负载周围。 捆扎机包括框架,安装在框架上的上部水平定向的压板,用于沿着框架垂直移动,安装到压板上并可移动的模块化捆扎头,以及安装到框架上的与捆扎头间隔开的模块化进料头。 带引导件部分地安装在框架上并且部分地安装在压板上。 带子引导件提供从进给头到捆扎头的不同长度的路径。 带子滑槽安装在框架上。 捆扎材料通过进料头通过引导件进入捆扎机,并进入捆扎头。 带子穿过捆扎头穿过带状滑槽并返回捆扎头,用于收缩,张紧和密封。 引导件包括垂直延伸部分,其具有取决于上部水平定向压板的垂直位置的变化的高度带路径。
    • 2. 发明申请
    • Horizontal strapping machine
    • 水平捆扎机
    • US20050217215A1
    • 2005-10-06
    • US10818544
    • 2004-04-05
    • Rainer RopersRichard BallingJames RobertsDonna Roberts
    • Rainer RopersRichard BallingJames RobertsDonna Roberts
    • B65B13/06B65B35/30
    • B65B13/06
    • A stacking and strapping apparatus is configured to stack a first load layer on a pallet, horizontally strap the load, stack a second load layer on the first load layer and horizontally strap the second load layer. The apparatus includes a frame, a sealing head operably mounted to the frame, a feed head operably mounted to the frame and a strap chute mounted to the frame. The strap chute is stationary and is fixedly mounted to the frame in a generally horizontal plane and has an opening therein for receiving the sealing head. The strap chute defines the boundaries of a vertical path for movement of the pallet, the first load layer and the second load layer. A draw plate is disposed above the strap chute. The draw plate is configured to receive the first load layer or the second load layer and to move between a loading position in which the first or second load layer is loaded onto the draw plate and a withdrawn position in which the draw plate moves to position the first load layer on the pallet or to position the second load layer on the first load layer. The draw plate is configured to move back to the loading position following transfer of the first load layer or the second load layer. A lift plate is disposed below the strap chute and draw plate. The lift plate is adapted to receive the pallet and to receive a load on the pallet. The lift plate moves downwardly to position the first load layer at the strap chute, moves up to receive the second load layer and moves downwardly again to position the second load layer at the strap chute.
    • 堆叠和捆扎装置被配置为将第一载荷层堆叠在托盘上,水平地捆扎载荷,在第一载荷层上堆叠第二载荷层并水平地捆扎第二载荷层。 该装置包括框架,可操作地安装到框架上的密封头,可操作地安装到框架的进给头和安装到框架的带槽。 带状滑槽是固定的,并且在大致水平的平面上固定地安装到框架上,并且在其中具有用于接收密封头的开口。 带槽限定了用于托板,第一载荷层和第二载荷层移动的垂直路径的边界。 拉板设置在吊带槽的上方。 牵引板构造成接收第一负载层或第二负载层,并且在第一或第二负载层被加载到牵引板上的负载位置和拉动板移动到其的位置之间移动, 第一载物层在托盘上或将第二载荷层定位在第一载荷层上。 牵引板构造成在第一载荷层或第二载荷层转移之后返回加载位置。 升降板设置在吊带槽和拉板的下方。 升降板适于接收托盘并接收托盘上的载荷。 提升板向下移动以将第一负载层定位在带状斜槽处,向上移动以接收第二负载层并再次向下移动以将第二负载层定位在带状斜槽处。