会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • SUCCESSIVE SAMPLING DEVICE AND ASSOCIATED METHOD
    • 成功采样设备及相关方法
    • US20110177962A1
    • 2011-07-21
    • US12688193
    • 2010-01-15
    • Sam KavusiDaniel RoserChristoph LangAmirAli Haj Hossein Talasaz
    • Sam KavusiDaniel RoserChristoph LangAmirAli Haj Hossein Talasaz
    • C40B30/04C40B60/12
    • G01N33/54366B01L3/5027C12Q1/6816G01N33/54393C12Q2565/501
    • A method of determining a number of a solution constituent includes introducing a first number of solution constituents to a first test location, establishing a first binding environment for the introduced first number of solution constituents, creating a first residual number of solution constituents by binding a first plurality of solution constituents, establishing a second binding environment for the first residual number of solution constituents, creating a second residual number of solution constituents by binding a second plurality of solution constituents from the first residual number of solution constituents, obtaining a first signal associated with the bound first plurality of solution constituents, obtaining a second signal associated with the bound second plurality of solution constituents, and determining a second number of a constituent of interest based upon the obtained first signal and the obtained second signal.
    • 确定溶液成分的数量的方法包括将第一数量的溶液成分引入到第一测试位置,为所引入的第一数量的溶液成分建立第一结合环境,通过将第一数量的溶液成分结合到第一残留数量的溶液成分 多个溶液成分,为第一剩余数量的溶液组分建立第二结合环境,通过将第二多个溶液组分与第一剩余数量的溶液组分结合而产生第二剩余数量的溶液组分,获得与 绑定的第一多个解决方案组成部分,获得与绑定的第二多个解决方案组成部分相关联的第二信号,以及基于获得的第一信号和获得的第二信号来确定感兴趣的组成部分的第二数量。
    • 4. 发明申请
    • Alignment gauge for continuous casting mold
    • 连铸模具对准量规
    • US20050081399A1
    • 2005-04-21
    • US10934618
    • 2004-09-03
    • Daniel RoserRichard Stamm
    • Daniel RoserRichard Stamm
    • B22D11/20G01B5/25G01D21/00
    • B22D11/208G01B5/25
    • An alignment gauge used to align the concave broadface copper in a continuous casting mold with a reference point below the mold such as the first and second rolls in the zero segment. The gauge includes a pair of support members with a first side and a second side. The first side of the support members has a curved edge that matches the concave curved wall of the broadface copper. The first side also has a pair of probes for detecting the position of the first and second rolls in the zero segment. Information regarding the alignment of the concave broadface copper with the first and second rolls in the zero segment is provided to a display in electrical communication with the probe.
    • 用于将连续铸造模具中的凹面铜线对准模具下方的参考点的对准计量器,例如零段中的第一和第二辊。 该计量器包括具有第一侧和第二侧的一对支撑构件。 支撑构件的第一侧具有与面铜的凹曲面匹配的弯曲边缘。 第一侧还具有一对用于检测零段中的第一和第二辊的位置的探头。 关于凹面铜与零段中的第一和第二辊的对准的信息被提供给与探针电连通的显示器。