会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 7. 发明申请
    • PROCESS FOR THE SEQUENTIAL PILOT-CONTROL OF A PROCESS
    • 方法的顺序先导控制的过程
    • WO1996029771A1
    • 1996-09-26
    • PCT/DE1996000545
    • 1996-03-22
    • VEW ENERGIE AGALBRECHT, JensKIENDL, Harro
    • VEW ENERGIE AG
    • H02J03/46
    • G05B13/026
    • The invention concerns a process for optimizing the actual charge of a power station by means of a power station control system. According to the invention, a nominal output value for a group of power stations is divided in an optimum manner into nominal values for the individual power stations, taking account of restrictions concerning the individual nominal values, secondary conditions and objectives concerning the power station control system as a whole. This object is achieved by a foresighted process based on a cost-dependent rating function which provides a functional value for all permissible output divisions in dependence on the previous output divisions and a penalizing function if cumulative and reserve requirements are not met.
    • 在通过电厂管理系统优化了目前电厂操作的方法,对于电厂设定点为个人电厂遵守有关电厂管理的各个设定值的限制和约束和目标功率设定点,以得到最佳的总分配。 该实现基于成本的打分函数,其提供了用于在对先前功率分裂依赖性所有允许的功率分配的函数值的基础上的预测方法,以及用于总和和储备权利要求的不履行罚函数。