会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Construction method of cellar for building completed
    • 建筑物建造方法
    • JP2012127186A
    • 2012-07-05
    • JP2011276024
    • 2011-12-16
    • Hang Ryong ByunJun-Son KimKorea Engineering & Consultant Co Ltdキム,ジュン ソンKIM,Jun Seoungコリア エンジニアリング アンド コンサルタント カンパニー リミテッドKorea Engineering & Consultant Co.,Ltd.ビュン,ハン ロンBYUN,Hang Ryong
    • BYUN HANG RYONGKIM JUN-SON
    • E02D29/045E21D13/00
    • E02D35/00
    • PROBLEM TO BE SOLVED: To provide a construction method of a cellar for a building completed.SOLUTION: The construction method includes: a step of making a plurality of holes and a slot pass through bottom concrete at the bottom part of the building completed so as to be communicated with the holes, inserting a support to the inside of the slot and making a stopper projected at the lower part of the support be engaged with the lower part of the slot to fix it; a step of providing a press-in machine on the upper part of the support; a step of inserting hollow piles to the respective holes, then pushing the piles into the underground using the press-in machine, stacking other piles on the pushed-in piles every time the piles are pushed in, then successively pushing them in by the press-in machine to support the underground structure of the building completed; a step of supporting the building completed by a column pushed into the underground and excavating the lower ground of the bottom concrete of the building in order to secure an underground space; and a step of placing concrete to the horizontal surface and vertical surface of the underground space secured by the step of excavating the lower ground of the concrete.
    • 要解决的问题:提供一种完成建筑物的地窖的施工方法。 解决方案:施工方法包括:在建筑物的底部,使多个孔和槽通过底部混凝土的步骤完成,以与孔连通,将支撑件插入到 突出在支撑件下部的止动器和止动件的下端部分固定; 在支撑件的上部设置压入机的步骤; 将空心桩插入到各个孔中的步骤,然后使用压入机将桩推入地下,每次将桩压入堆叠时将堆叠的堆叠堆叠在推入的桩上,然后依次将它们推压 - 在机房内支撑建筑物的地下结构; 支撑建筑物完成的一个步骤,将柱子推入地下,挖掘建筑物底部混凝土的下部地面,以确保地下空间; 以及将混凝土置于通过挖掘混凝土下部的台阶固定的地下空间的水平表面和垂直表面的步骤。 版权所有(C)2012,JPO&INPIT