会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • 슬러지 소각 용융로의 분사노즐
    • 슬러지소각용융로의분사노즐
    • KR100418177B1
    • 2004-02-11
    • KR1020000075847
    • 2000-12-13
    • 고등기술연구원연구조합(주)대우
    • 유영돈윤용승박화규민종민
    • F23G5/00
    • PURPOSE: A spray nozzle for a sludge incinerating melt furnace is provided to reduce manufacturing cost of the melt furnace by simplifying a control and supply system of sludge and oxidizer. CONSTITUTION: A spray nozzle(10) for a sludge incinerating melt furnace comprises a sludge spraying unit(11), a first oxidizer spraying unit(12), a second oxidizer spraying unit(13), a circulator(14), and a controller(15). The sludge spraying unit is installed on an upper portion of the sludge incinerating melt furnace body to spray sludge carried with transferring air from a sludge supply. The first and second oxidizer spraying units are coaxially installed inside and outside the sludge spraying unit to spray the first and second oxidizers. The circulator is installed between the sludge spraying unit and the second oxidizer spraying unit to circulate the sprayed oxidizers. The controller is installed to an end of the first oxidizer spraying unit to control a spraying angle of the sludge.
    • 目的:通过简化污泥和氧化剂的控制和供应系统,提供用于污泥焚烧熔融炉的喷嘴以降低熔融炉的制造成本。 一种用于污泥焚烧熔融炉的喷嘴(10),包括污泥喷洒单元(11),第一氧化剂喷洒单元(12),第二氧化剂喷洒单元(13),循环器(14)和控制器 (15)。 污泥喷洒单元安装在污泥焚烧熔化炉体的上部,以喷洒来自污泥供应的输送空气的污泥。 第一和第二氧化剂喷射单元同轴地安装在污泥喷洒单元的内部和外部以喷洒第一和第二氧化剂。 循环器安装在污泥喷洒单元和第二氧化剂喷洒单元之间以循环喷洒的氧化剂。 控制器安装到第一氧化剂喷射单元的一端以控制污泥的喷射角度。
    • 2. 发明授权
    • 슬러지 소각용 용융로
    • 슬러지소각용용융로
    • KR100379153B1
    • 2003-04-08
    • KR1019990054635
    • 1999-12-03
    • 고등기술연구원연구조합(주)대우
    • 유영돈윤용승최성우박화규
    • F23G7/00
    • PURPOSE: A sludge incinerating melting furnace is provided to minimize the discharge amount of molten slag with combustion gas in a swirl incinerating melting furnace. CONSTITUTION: A sludge melting furnace is composed of a first vertical combustion chamber(10) having plural supply nozzles(11,16) to supply sludge, oxidizer and air, and incinerating and melting sludge; a second inclined combustion chamber(20) connecting to the lower part of the first combustion chamber, having an air supply nozzle(22) and an auxiliary burner(21), and burning inorganic matters and incomplete combustion ; a slag cooler(30) mounted in the lower part of a combustion gas outlet of the second combustion chamber, and connected to the second combustion chamber by a conduit(23) to flow and cool molten slag with combustion gas in the second combustion chamber; and a combustion gas cooling pipe connected to the slag cooler to cool and discharge combustion gas from the second combustion chamber to the slag cooler. The discharge amount of slag among combustion gas is minimized, and the molten slag is prevented from being stuck to the conduit to improve efficiency.
    • 目的:提供一种污泥焚烧熔化炉,以最大限度地减少旋流焚烧熔化炉中燃烧气体的熔渣排放量。 一种污泥熔化炉,它由第一垂直燃烧室(10)和第二垂直燃烧室(10)组成,该第一垂直燃烧室具有多个供给污泥,氧化剂和空气的供给喷嘴(11,16)以及焚化和溶解污泥; 连接到第一燃烧室下部的第二倾斜燃烧室(20),其具有空气供应喷嘴(22)和辅助燃烧器(21),并且燃烧无机物和不完全燃烧; 一个安装在第二燃烧室燃烧气体出口下部的炉渣冷却器(30),并通过导管(23)连接到第二燃烧室,以便在第二燃烧室中用燃烧气体流动和冷却熔融炉渣; 以及与所述炉渣冷却器连接的燃烧气体冷却管,以将燃烧气体从所述第二燃烧室冷却并排出到所述炉渣冷却器。 燃烧气体中炉渣的排出量被最小化,并且防止熔渣粘附到管道以提高效率。
    • 3. 发明公开
    • 슬러지 소각용 용융로
    • 焚烧炉熔炼炉
    • KR1020010054033A
    • 2001-07-02
    • KR1019990054635
    • 1999-12-03
    • 고등기술연구원연구조합(주)대우
    • 유영돈윤용승최성우박화규
    • F23G7/00
    • PURPOSE: A sludge incinerating melting furnace is provided to minimize the discharge amount of molten slag with combustion gas in a swirl incinerating melting furnace. CONSTITUTION: A sludge melting furnace is composed of a first vertical combustion chamber(10) having plural supply nozzles(11,16) to supply sludge, oxidizer and air, and incinerating and melting sludge; a second inclined combustion chamber(20) connecting to the lower part of the first combustion chamber, having an air supply nozzle(22) and an auxiliary burner(21), and burning inorganic matters and incomplete combustion ; a slag cooler(30) mounted in the lower part of a combustion gas outlet of the second combustion chamber, and connected to the second combustion chamber by a conduit(23) to flow and cool molten slag with combustion gas in the second combustion chamber; and a combustion gas cooling pipe connected to the slag cooler to cool and discharge combustion gas from the second combustion chamber to the slag cooler. The discharge amount of slag among combustion gas is minimized, and the molten slag is prevented from being stuck to the conduit to improve efficiency.
    • 目的:提供一种污泥焚烧熔化炉,以最大限度地减少旋流式焚烧熔化炉中燃烧气体熔渣的排放量。 构成:污泥熔化炉由具有多个供给喷嘴(11,16)的第一垂直燃烧室(10,16)构成,供给污泥,氧化剂和空气以及焚烧和熔化污泥; 连接到第一燃烧室的下部的第二倾斜燃烧室(20),具有供气喷嘴(22)和辅助燃烧器(21),并且燃烧无机物质和不完全燃烧; 安装在所述第二燃烧室的燃烧气体出口的下部并且通过导管(23)连接到所述第二燃烧室以使所述第二燃烧室中的燃烧气体流动和冷却熔渣的炉渣冷却器(30) 以及燃烧气体冷却管,其连接到炉渣冷却器以将燃烧气体从第二燃烧室冷却和排出到炉渣冷却器。 燃烧气体中的炉渣排出量最小化,并且防止熔融渣被粘附到管道上以提高效率。
    • 7. 发明公开
    • 고율 혐기성 반응조 좌우대칭 경사판형 가스 슬러지 분리장치
    • 用于高速气动反应罐的对称板的气体分离器。
    • KR1020000001359A
    • 2000-01-15
    • KR1019980021580
    • 1998-06-10
    • (주)대우
    • 박칠림이의신허관용박영재정의근
    • C02F3/28
    • PURPOSE: A gas sludge separator is provided to reduce the separator volume size to be suitable for a large capacity anaerobic reaction tank and to improve resettling effect in be activated sludge process of high concentration organic wastewater. CONSTITUTION: The separator has many plates as auxiliary members installed symmetrically in slant of an angle(60 degree) along a central line and also has a square funnel-like separator of a dual structure placed above the auxiliary plate members and consisting of an outer square funnel member(6) narrowing upward and an inner square funnel member(7) having the top opening smaller than the opening of the outer member(6). The dual structure separator is integrally formed of stainless steel. The reaction tank is made to flow the treating wastewater upward. The separator reduces the volume size by 1/3 the conventional size and expands the settling area by 100%.
    • 目的:提供一种气体污泥分离器,以减少分离器体积大小,适用于大容量厌氧反应槽,提高高浓度有机废水活性污泥工艺的安置效果。 构成:分离器具有许多板作为辅助构件,沿着中心线以倾斜(60度)对称地安装,并且还具有放置在辅助板构件上方的双重结构的方形漏斗状分隔件,并由外部正方形 漏斗构件(6)向上变窄并且具有比外部构件(6)的开口小的顶部开口的内部方形漏斗构件(7)。 双结构隔板由不锈钢整体形成。 使反应槽向上流动处理废水。 分离器将体积尺寸减小了常规尺寸的1/3,并将沉降面积扩大了100%。
    • 8. 发明公开
    • 에폭시와 탄소섬유쉬트를 합성하여 성형된 에폭시-탄소섬유보강판재 및 그 제조방법
    • 环氧碳纤维增强板及其生产方法,通过合成环氧树脂和碳纤维板
    • KR1020000001355A
    • 2000-01-15
    • KR1019980021576
    • 1998-06-10
    • (주)대우
    • 박칠림백명종
    • B32B5/10B32B27/12
    • B32B27/12B32B27/38B32B38/08B32B2038/0076B32B2260/021B32B2260/046B32B2262/106
    • PURPOSE: An epoxy-carbon fiber reinforcing panel and production method thereof, molded by previously synthesizing epoxy and a carbon fiber sheet are provided to make construction easier when reinforcing a structure member like a slab, a truss of a reinforcing steel concrete group, also to reduce expenses and air. CONSTITUTION: A molding method of a reinforcing panel comprises the steps of: hardening by injecting epoxy resin to the specific height at the lower part of a mold; stacking carbon fiber sheets removed of a sheet protective paper(3) as the hardening of epoxy resin injected is proceeded to a certain amount; suppressing to impregnate epoxy resin into the stacked carbon fiber sheet(4) using a roller stained with epoxy resin; injecting the epoxy resin in the upper part of the carbon fiber sheet(4) stacked; controlling its thickness; hardening to complete the upper part panel.
    • 目的:提供通过预先合成环氧树脂和碳纤维片而成型的环氧碳纤维增强板及其制造方法,以便在加强钢板混凝土组的板坯,桁架等结构构件时,容易地构造, 减少费用和空气。 构成:加强板的成型方法包括以下步骤:通过在模具的下部将环氧树脂注射到特定高度来硬化; 将注入的环氧树脂硬化后的层压保护纸(3)的碳纤维片层叠到一定量; 抑制使用环氧树脂染色的辊将环氧树脂浸渍到堆叠的碳纤维片(4)中; 在碳纤维片(4)的上部注入环氧树脂; 控制其厚度; 硬化完成上部面板。
    • 9. 发明授权
    • 반응 스펙트럼을 이용한 지진에 대한 초고층 건물의 반응 측정방법
    • 建筑物反应测量方法通过反应谱进行地震测量
    • KR100230518B1
    • 1999-11-15
    • KR1019970039336
    • 1997-08-19
    • (주)대우
    • 박칠림안재현송화철유은종주영규
    • G01V1/22
    • 본 발명은 반응 스펙트럼을 이용한 지진에 대한 초고층 건물의 반응 측정방법에 관한 것으로, 계산량과 측정시간을 대폭 단축시키고, 측정 결과의 분석이 용이하도록 하기 위해 설계할 구조물의 형상과 부재특성 및 시뮬레이션에 필요한 파라메타 값을 입력하는 제1단계; 상기 제1단계에서 입력된 파라메타 값에 따른 각 부재의 강성을 계산하여 층별 강성 행렬로 나타내는 제2단계; 상기 제2단계 수행 후, 연직 방향의 자중에 의한 정적 해석을 통해 지진하중이 작용하기 이전의 구조물의 초기 응력 상태를 계산하는 제3단계; 주어진 파라메타 값에 따른 지진하중에 대해 반응 스펙트럼 해석을 통해 구조물의 응력 상태를 계산하는 제4단계; 상기 제4단계에서 계산된 응력비로부터 감소계수를 구하는 제5단계; 이전에 계산된 상기 감소계수들을 더한 값이 미리 설정된 소정의 목표치보다 큰지 아닌지를 판단하는 제6단계; 상기 제6단계에서, 감소계수들의 합이 상기 소정의 목표치보다 크지 않으면 항복이 일어난 부재의 단부에 소성힌지를 추가하여 전체 구조물의 변화된 강성을 계산한 후, 상기 제4단계를 반복하는 제7단계; 및 상기 제6단계에서 감소계수들의 합이 상기 소정의 목표치보다 크면 구조물의 최종 응답을 계산하는 제8단계를 포함한다.
    • 10. 实用新型
    • 소음 및 진동차폐용 건식 공동주택바닥구조
    • 用于保护房屋噪声和振动的地板结构
    • KR200158585Y1
    • 1999-10-15
    • KR2019950034219
    • 1995-11-18
    • (주)대우주식회사 유일엔시스
    • 김기동정성철김유일김민배
    • E04F15/18
    • 본 고안은 공동주택에서 있어서 소음 및 진동을 차폐하기위해 적용되는 소음 및 진동차폐용 건식 공동주택바닥구조에 관한 것이다.
      본 고안의 목적은 상층에서 발생되는 소음 및 진동을 차폐하여 하층에 전달되지 않게 함으로써 공동주택에 쾌적한 주거환경을 제공해줄 뿐만아니라 경량기포 콘크리트등으로 단열층을 형성해줄 필요가 없어서 동절기에도 시공이 가능하게 해주는 소음 및 진동차폐용 건식 공동주택바닥구조를 제공해주기 위한 것이다.
      전술한 목적을 달성하기 위해서, 본 고안은, 콘크리트 슬래브; 상기 콘크리트 슬래브위에 설치하되 하부에 다수의 넓은 삽입홈이 형성된 EPS층; 상기 EPS층의 삽입홈에 하부로 약간 돌출되게 장착된 소음·진동차폐재; 상기 EPS 층의 상면에 설치된 파이프 배관; 및 상기 EPS 층의 상면에 설치된 파이프 배관을 덮어서 바닥을 마무리하는 마감 몰탈층으로 구성되는 것을 특징으로 하는 소음 및 진동차폐용 건식 공동주택바닥구조를 제공해준다.