    • 81. 发明授权
    • 가설케이블에 의한 일반강재의 초기 프리스트레스 도입방법
    • 通过电缆电缆的初步介绍一般钢的方法
    • KR100915590B1
    • 2009-09-07
    • KR1020080109340
    • 2008-11-05
    • (주)평화엔지니어링정기영우경건설 주식회사
    • 정기영
    • E01D21/00E01D22/00E01D11/04E01D19/16E01D101/32
    • E01D21/00E01D11/04E01D19/16E01D22/00E01D2101/32
    • An initial prestressing method for general steel materials using temporary cables is provided to reduce construction cost by implementing the function of general cables through the temporary cables. An initial prestressing method for general steel materials using temporary cables comprises a step of setting a main girder(12) on an abutment and a pier(13), a dead anchorage(23) on the top of a pylon(11) installed on the pier, a live anchorage(24) on the main girder, and diagonal member connecting brackets(20) on flanges of the pylon and the main girder, a step of fixing one end of a temporary cable on the dead anchorage and the other on the live anchorage, inducing tension on the temporary cable by tensing the temporary cable end on the live anchorage, and fixing the tensed temporary cable end with a fixing nut, a step of setting a diagonal member of general steel between the diagonal member connecting brackets and connecting the diagonal member connecting brackets and the diagonal member by placing a connection plate between them and fixing with bolt and nut, and a step of removing the temporary cable from the dead anchorage and the live anchorage so that the tension induced on the temporary cable is left on the diagonal member.
    • 提供使用临时电缆的普通钢材初步预应力方法,通过临时电缆实现通用电缆的功能,降低施工成本。 用于使用临时缆索的一般钢材的初始预应力方法包括将主梁(12)设置在基台和墩(13)上的步骤,安装在其上的吊架(11)的顶部上的死锚(23) 码头,主梁上的活动锚地(24),以及在塔架和主梁的法兰上的对角构件连接支架(20),将临时缆索的一端固定在死地锚上的步骤 活动锚固,通过张紧活动锚地上的临时电缆端引起临时电缆的张力,并用固定螺母固定拉紧的临时电缆端;将对角构件连接支架与连接支架之间的普通钢对角构件 对角构件连接支架和对角构件,通过在它们之间放置连接板并用螺栓和螺母固定,以及从死锚和活锚固中去除临时缆索的步骤,使得在 临时电缆留在对角线上。
    • 88. 发明公开
    • 프리플렉스 빔 분할 제작 설치 방법
    • 通过分割模式制备和构造复合材料的方法
    • KR1020050026470A
    • 2005-03-15
    • KR1020050015792
    • 2005-02-25
    • 안철승
    • 안철승
    • E01D2/02E01D21/00E01D101/32
    • E01D2/02E01D21/00E01D2101/32
    • A manufacturing and installing method for a preflex composite beam by division is provided to prevent the overturn and crack in support when placing upper slab concrete and to prevent a bridge from falling off at an earthquake. The preflex composite beam is manufactured by installing a PC beam(100) and an anchor plate(110) on both ends of an I-beam member while applying preflex load(Pf) on an I-beam member manufactured with planned bending moment by applying live load, placing prestress on a PC beam(100) using a hydraulic jack, and placing lower casing concrete while keeping preflexion, then releasing, and installed by carrying, connecting and re-assembling on a bridge, and releasing the prestress of the PC beam(100).
    • 提供了一种用于预混复合梁分割的制造和安装方法,以防止在放置上板坯混凝土时支撑件的翻倒和裂缝,并防止桥梁在地震时脱落。 预成形复合梁是通过在I型梁构件的两端安装PC梁(100)和锚板(110)而制造的,同时通过应用预制弯曲载荷(Pf)施加预制弯曲载荷(Pf) 使用液压千斤顶将预应力放置在PC梁(100)上,并在保持预弯曲的同时放置下套管混凝土,然后通过承载,连接和重新组装在桥上进行释放和安装,并释放PC的预应力 光束(100)。
    • 89. 实用新型
    • 열변형을 이용한 프리스트레스 연속강재보
    • 预应力连续钢梁热变形
    • KR200348997Y1
    • 2004-04-29
    • KR2020040002652
    • 2004-02-04
    • 강창구
    • 강창구
    • E01D2/02
    • E01D2/00E01D2101/32E04C3/10
    • 본 고안은 건축 및 토목구조물의 구조부재에 관한 것으로, 강재 H빔이나 I빔 또는 빌트업빔 등의 열변형에 의한 프리스트레스를 도입하여 강형재를 인장재에 강결하되 인장재를 상부에서 강결한 보를 기둥부에 배치하고, 인장재를 하부에서 강결한 보를 기둥사이에 배치하여 강결함으로써 다주구조물에서 정·부 모멘트를 효과적으로 상쇄시키는데 그 목적이 있다.
      이를 위해 본 고안에서는 슬래브를 지지하는 강재보가 설치되는 건축물이나 토목구조물에 있어서, 하부에 열변형 탄성 인장재(21)와, 상부에는 탄성 강형재(31)가 강결접합되어 이루어지되, 상기 강형재(31)는 열변형에 의해 길이방향으로 신장된 상태에서 상기 인장재(21)와 강결접합됨으로써 상단에는 인장응력이 도입되고 하단에는 압축응력이 도입된 하부인장강재보(11)를 기둥사이의 중앙부에 배치하고, 상부에 열변형 탄성 인장재(22)와, 하부에는 탄성 강형재(32)가 강결접합되어 이루어지되, 상기 강형재(32)는 열변형에 의해 길이방향으로 신장된 상태에서 상기 인장재(22)와 강결접합됨으로써 상단에는 압축응력이 도입되고 하단에는 인장응력이 도입된 상부인장강재보(12)를 기둥부에 배치되고 상기 상부인장강재보와 하부인장강재보가 강결접합된 것을 특징으로 하는 열변형을 이용한 프리스트레스 연속 강재보를 제안한다.