会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 71. 发明申请
    • Method for supplying gas while dividing to chamber from gas supply facility equipped with flow controller
    • 在配备有流量控制器的气体供给设备的同时向室供给气体的方法
    • US20050005994A1
    • 2005-01-13
    • US10495641
    • 2003-01-20
    • Kazuhiko SugiyamaNobukazu IkedaKouji NishinoRyousuke DohiToyomi Uenoyama
    • Kazuhiko SugiyamaNobukazu IkedaKouji NishinoRyousuke DohiToyomi Uenoyama
    • H01L21/205G05D7/06B67C3/00
    • G05D7/0664Y10T137/7759Y10T137/7761
    • A method for supplying a specified quantity Q of processing gas while dividing at a desired flow rate ratio Q1/Q2 accurately and quickly from a gas supply facility equipped with a flow controller into a chamber. When a specified quantity Q of gas is supplied while being divided at a desired flow rate ratio Q1/Q2 from a gas supply facility equipped with a flow controller into a reduced pressure chamber C through a plurality of branch supply lines and shower plates fixed to the ends thereof, pressure type division quantity controllers FV1 and FV2 are provided in the plurality of branch supply lines GL1 and GL2. Opening control of both division quantity controllers FV1 and FV2 is started by an initial flow rate set signal from a division quantity control board FRC for fully opening the control valve CV of the pressure type division quantity controller having a higher flow rate and pressures P3′ and P3″ on the downstream side of the control valve CV are regulated thus supplying a total quantity Q=Q1+Q2 of gas while dividing into the chamber C through orifice holes (3a, 4a) made in shower plates (3, 4) at desired division quantities Q1 and Q2 represented by formulas Q1=C1P3′ and Q2=C2P3″ (where, C1 and C2 are constants dependent on the cross-sectional area of the orifice hole or the gas temperature on the upstream side thereof).
    • 一种用于在从配备有流量控制器的气体供给设备进入腔室的情况下,以期望的流量比Q1 / Q2精确而快速地分配处理气体的规定量Q的方法。 当通过多个分支供应管线和固定到所述流体控制器的淋浴板以期望的流量比Q1 / Q2从装备有流量控制器的气体供应设备分配到减压室C中时,供应指定量的气体 在多个分支供给线GL1和GL2中设置有压力分离量控制器FV1和FV2。 通过来自分割量控制板FRC的初始流量设定信号来开始分控数量控制器FV1和FV2的打开控制,以完全打开具有较高流量和压力P3'的压力型分配量控制器的控制阀CV,并且 在控制阀CV的下游侧的P3“被调节,从而通过在淋浴板(3,4)上形成的喷孔(3a,4a)分隔成室C,从而提供气体的总量Q = Q1 + Q2, 由公式Q1 = C1P3'和Q2 = C2P3“表示的期望分割量Q1和Q2(其中C1和C2是取决于孔口的横截面面积或其上游侧的气体温度的常数)。
    • 76. 发明申请
    • CAM CONTROL VALVE
    • CAM控制阀
    • US20120223265A1
    • 2012-09-06
    • US13389671
    • 2010-11-05
    • Yohei SawadaRyousuke DohiKouji NishinoNobukazu Ikeda
    • Yohei SawadaRyousuke DohiKouji NishinoNobukazu Ikeda
    • F16K31/524F16K31/04F16K7/16
    • F16K7/16F16K31/047F16K31/52408
    • A cam control valve includes a valve casing having a fluid passage and valve seat, a valve disc seated on the valve seat to open and close the fluid passage, a valve stem holding down the valve disc so it contacts the valve seat, a cam acting on the valve stem to hold it down, a motor rotating the cam, a motor holder holding the motor, a supporting frame fixed to the valve casing and supporting the motor holder so it moves vertically, an elastic member biasing the motor holder towards spacing from an upper side portion of the supporting frame, and height adjustable screws suspending the motor holder from the supporting frame, and adjusting a height of the motor holder with respect to the supporting frame, wherein the height adjustable screws are slidably inserted into the upper side portion of the supporting frame and screwed into the motor holder.
    • 凸轮控制阀包括具有流体通道和阀座的阀壳体,阀座位于阀座上以打开和关闭流体通道;阀杆,其压紧阀盘,使其接触阀座;凸轮作用 在阀杆上保持下降,电动机旋转凸轮,保持电动机的电动机支架,固定在阀壳体上的支撑框架,并支撑电动机支架使其垂直移动;弹性构件,将电动机支架偏压 支撑框架的上侧部分和高度可调节的螺钉,使马达夹持器从支撑框架上悬挂起来,并且相对于支撑框架调节马达夹持器的高度,其中高度可调节螺钉可滑动地插入到上侧部分 的支撑框架并拧入电机支架。