会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 61. 发明申请
    • Deferred tuple space programming of expansion modules
    • 扩展模块的延迟元组空间编程
    • US20050177675A1
    • 2005-08-11
    • US11102209
    • 2005-04-09
    • Thomas NewmanLeonard OttRobert MillerBobby GiffordLarry Lovercheck
    • Thomas NewmanLeonard OttRobert MillerBobby GiffordLarry Lovercheck
    • G06F13/38G06F12/00
    • G06F13/385G06F13/387
    • The present invention permits deferring the final provisioning of the Card Information Structure (CIS) in the attribute memory space of expansion cards (or modules) for portable hosts. This enables expansion cards to be distributed, sold, and installed by their end-users prior to the final provisioning, which is performed during their initial use. A temporary default CIS image is provided that permits baseline functionality of the expansion card with a host device. Providing the default CIS data enables provisional installation and operation of the card in the host, including accessing the card by way of default card services and socket software layers, as provided in the standard software environment of the host. The provisional operation enables higher level software to program the final CIS values in the peripheral controller internal CIS data-structure, EEPROM on the card, or any combination of the two.
    • 本发明允许在用于便携式主机的扩展卡(或模块)的属性存储器空间中延迟卡信息结构(CIS)的最终提供。 这使得扩展卡在最终配置之前由最终用户进行分发,销售和安装,这在最初的使用期间执行。 提供了允许扩展卡与主机设备的基线功能的临时默认CIS映像。 提供默认的CIS数据可以在主机中临时安装和操作卡,包括通过主机的标准软件环境中提供的默认卡服务和套接字软件层访问卡。 临时操作使更高级别的软件可以对外围控制器内部CIS数据结构,卡上的EEPROM或两者的任意组合对最终的CIS值进行编程。
    • 64. 发明申请
    • Truck bed carrier
    • 卡车托架
    • US20050111945A1
    • 2005-05-26
    • US10722301
    • 2003-11-25
    • Robert Miller
    • Robert Miller
    • B60P3/06B60P3/10B60P1/64
    • B60P3/1058B60P3/06
    • A truck bed mounted carrier assembly is articulated by a powered pulley taking in or extending a belt to extend on an incline towards ground from the rear of the bed a ramp on which a dolly is translated. The dolly selectively engaged to the end of the belt includes a ribbed cage supporting a watercraft and the combined center of gravity of the dolly and the craft are used to pivot the ramp to an incline once it reaches the limit of its extension. The dolly is then disengaged from the belt for use in launching and recovering the craft.
    • 卡车安装的托架组件由动力皮带轮铰接,所述动力皮带轮带入或延伸皮带,从所述床的后部倾斜地朝向地面延伸,斜坡在其上翻转小车。 选择性地接合到带的端部的小车包括支撑船只的肋骨笼,并且当达到其延伸的极限时,使用斜盘和工具的组合重心将斜坡枢转到倾斜。 然后将小车从皮带上脱开以用于发射和恢复飞行艇。
    • 67. 发明申请
    • Primary-backup group with backup resources failover handler
    • 主备份组与备份资源故障转移处理程序
    • US20050021573A1
    • 2005-01-27
    • US10626087
    • 2003-07-24
    • Michael McDermottRobert MillerMichael SnyderKiswanto Thayib
    • Michael McDermottRobert MillerMichael SnyderKiswanto Thayib
    • G06F12/00
    • G06F11/2033G06F11/2025G06F11/2028G06F11/2069
    • Failover processing that accommodates failures of backup computing nodes and resources, such as data storage units and printers. Failure of a computing node that controls resources causes another computing node to assume control of the resources controlled by the failed node. Failure of the primary computing node causes another computing node, at either the same or at a different site, to be selected as the new primary node. Failure of a resource at the primary site causes the site with the next highest priority backup resource to become the new primary site. Failure of a backup computing node causes a new backup node at the same site as the failed backup node to replace the failed backup node as host for the site's resources. Backup mirroring data flows are then adjusted to reflect the new functions of the affected nodes.
    • 适应备份计算节点和资源(如数据存储单元和打印机)故障的故障转移处理。 控制资源的计算节点的失败导致另一个计算节点承担由故障节点控制的资源的控制。 主计算节点的故障导致在相同或不同站点处的另一个计算节点被选为新的主节点。 主站点资源的故障导致具有次高优先级备份资源的站点成为新的主站点。 备份计算节点的故障导致与故障备份节点位于同一站点的新备份节点将故障备份节点替换为站点资源的主机。 然后调整备份镜像数据流以反映受影响节点的新功能。