会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 41. 发明申请
    • Duplexer
    • 双工器
    • US20050104203A1
    • 2005-05-19
    • US10886047
    • 2004-07-08
    • Akio HirakawaYoshiaki FujitaTomokazu Komazaki
    • Akio HirakawaYoshiaki FujitaTomokazu Komazaki
    • H03H9/72H01L25/16H03H9/25H01L23/34
    • H01L25/165H01L2924/0002H01L2924/3011H01L2924/00
    • A filter chip lying on an upper surface of a top layer package substrate is connected to an upper surface ground electrode (235). The upper ground electrode (235) and a lower surface ground electrode (237) are connected to each other via through electrodes (261, 262, 263), ground wiring patterns (251, 252), first connecting lines (271 to 276), and second connecting lines (281, 282). The first connecting lines (271 to 276) are connected to the ground wiring patterns (251, 252), whereas the second connecting lines (281, 282) are not connected to the ground wiring patterns (251, 252), respectively. Owing to the provision of the connecting lines connected to the ground wiring patterns (251, 252) and the connecting lines unconnected to the ground wiring patterns (251, 252), the impedance between a multilayer package substrate and ground can be adjusted.
    • 位于顶层封装衬底的上表面上的滤波器芯片连接到上表面接地电极(235)。 上接地电极(235)和下表面接地电极(237)经由电极(261,262,263),接地布线图案(251,252),第一连接线(271〜276), 和第二连接线(281,282)。 第一连接线(271〜276)连接到接地布线图案(251,252),而第二连接线(281,282)分别不连接到接地布线图案(251,252)。 由于提供连接到接地布线图案(251,252)的连接线和未连接到接地布线图案(251,252)的连接线,可以调节多层封装基板和接地之间的阻抗。
    • 45. 发明授权
    • Emergency stop releasing method for elevator
    • 电梯紧急停止释放方法
    • US6119816A
    • 2000-09-19
    • US390659
    • 1999-09-07
    • Yoshiaki Fujita
    • Yoshiaki Fujita
    • B66B5/00B66B5/02B66B1/40
    • B66B5/027B66B5/0087
    • An emergency stop state releasing method for an elevator, which includes a cage configured to ascend and descend along a first guide rail in an elevator shaft, a counterweight configured to ascend and descend along a second guide rail in the elevator shaft, a cable for suspending the cage and the counterweight, a drive unit in the elevator shaft for driving the cable to move the cage up and down in the elevator shaft, and an emergency stop mechanism attached to the cage and configured to engage the guide rail, thereby urgently stopping the cage, and to lift the cage, thereby canceling an emergency stop state, including the steps of setting a removable winding device in the elevator shaft, and driving one of the cage and the counterweight by means of the winding device to lift the cage and cancel the emergency stop state.
    • 一种用于电梯的紧急停止状态释放方法,包括:轿厢,其被构造成沿着电梯井道中的第一导轨上升和下降;配置成沿电梯井道中的第二导轨上升和下降的配重;用于悬挂的电缆 保持架和配重,电梯井道中的驱动单元,用于驱动电缆,使升降机井杆上下移动保持架;以及紧急停止机构,其安装在保持架上并构造成与导轨接合,从而紧急停止 并且提升保持架,从而取消紧急停止状态,包括将可拆卸卷绕装置设置在电梯井中的步骤,以及通过卷绕装置驱动保持架和配重之一,以提升保持架并取消 紧急停止状态。