    • 41. 发明公开
    • 모듈러 교량 거더 시공 방법
    • 模块化桥梁的构造方法
    • KR1020130075587A
    • 2013-07-05
    • KR1020110143988
    • 2011-12-27
    • 주식회사 포스코
    • 김진국이필구조광일
    • E01D2/00E01D21/00
    • E01D2/00E01D21/00E01D2101/30
    • PURPOSE: A construction method of a modular bridge girder is provided to simplify a construction process at a construction site and to reduce construction time by assembling multiple girders on a conveying unit. CONSTITUTION: A construction method of a modular bridge girder is as follows. Multiple girders (110-1,2,3) are loaded on a conveying unit (300) and are overlapped each other. The girders are moved to the rear portion of the conveying unit one by one by supporting the girders using a cable (320) of a crane boom (310) and are coupled to each other. The assembly, which is the coupled girders, is installed on a pier.
    • 目的:提供一种模块化桥梁的施工方法,以简化施工现场的施工过程,并通过在输送单元上组装多根梁来缩短施工时间。 构成:模块化桥梁的施工方法如下。 多个桁架(110-1,2,3)装载在输送单元(300)上并且彼此重叠。 通过使用起重机吊杆(310)的缆索(320)支撑梁,将桁架逐一移动到输送单元的后部,并且彼此连接。 作为联接的大梁的组件安装在码头上。
    • 42. 发明公开
    • 복합형식을 갖는 연속화 교량의 거더 연결 구조
    • 连续桥梁复合梁的连接结构
    • KR1020130053211A
    • 2013-05-23
    • KR1020110118857
    • 2011-11-15
    • 주식회사 포스코재단법인 포항산업과학연구원
    • 이필구조광일김진국하동화이석종
    • E01D2/00E01D2/04E01D21/00E01D101/30
    • E01D2/00E01D2/04E01D21/00E01D2101/30
    • PURPOSE: A girder connection structure of a continuous bridge including a composite form is provided to economically form the continuous bridge without member waste of a truss girder unit and to form the continuous bridge which safely resists to a positive moment and a negative moment. CONSTITUTION: A girder connection structure(100) of a continuous bridge comprises a steel box girder unit(110), a truss girder unit(130), and a connection unit(150). The steel box girder unit comprises a web(111), an upper flange(113), and a lower flange(114), and the upper flange and the lower flange are connected to the upper part and the lower part of the web. The truss girder unit comprises an upper chord(131), a lower chord(132), and a diagonal member(133) and is connected to the steel box girder in a throttle direction. The connection unit connects the steel box girder and the truss girder unit and comprises a stress concentration prevention unit. The stress concentration prevention unit prevents stress concentration from being focused on the upper chord and the lower chord.
    • 目的:提供包括复合形式的连续桥梁的梁连接结构,以经济地形成连续桥梁,而不会造成桁架梁单元的浪费,并形成安全抵抗正时刻和负矩的连续桥梁。 构成:连续桥梁的梁连接结构(100)包括钢箱梁单元(110),桁架梁单元(130)和连接单元(150)。 钢箱梁单元包括腹板(111),上凸缘(113)和下凸缘(114),并且上凸缘和下凸缘连接到腹板的上部和下部。 桁架梁单元包括上弦杆(131),下弦杆(132)和对角构件(133),并且在节气门方向上连接到钢箱梁。 连接单元连接钢箱梁和桁架梁单元,并包括应力集中预防单元。 应力集中预防单元防止应力集中在上弦和下弦上。
    • 43. 发明公开
    • T형 보강재가 보강된 파형강판 구조물 및 그 보강방법
    • 具有T形加强件的波纹钢板结构和加固方法
    • KR1020030053637A
    • 2003-07-02
    • KR1020010083583
    • 2001-12-22
    • 재단법인 포항산업과학연구원평산에스아이 주식회사주식회사 포스코
    • 이필구
    • E21D9/00
    • PURPOSE: A wavy steel plate structure with a T-shaped stiffener is provided to secure the stability of a structure by resisting bending moment. CONSTITUTION: The wavy steel plate structure with a T-shaped stiffener comprises: a T-shaped stiffener(40) having the width and length to cover up a portion of at least one hollow(32) formed along the curvature of a wavy steel plate, and containing a flange(41) provided with many shear connectors(42) and an inlet(43) to fill shrinkage compensating mortar and bolted on elevations(31); sealant forming an inner space by cutting off the hollow(32) from both ends of the T-shaped stiffener(40); and shrinkage compensating mortar(50) filled in an inner space through the inlet(43) of the flange(41).
    • 目的:提供具有T形加强筋的波浪形钢板结构,通过抵抗弯矩来确保结构的稳定性。 构成:具有T形加强件的波浪形钢板结构包括:T形加强件(40),其具有宽度和长度以覆盖沿着波状钢板的曲率形成的至少一个中空部分(32)的一部分, ,并且包含设置有许多剪切连接器(42)和入口(43)的凸缘(41),以填充收缩补偿砂浆并且螺栓连接在高度(31)上; 通过从所述T形加强件(40)的两端切掉所述中空部(32)而形成内部空间的密封件; 和通过凸缘(41)的入口(43)填充在内部空间中的收缩补偿砂浆(50)。
    • 45. 发明公开
    • 바닥구조물
    • 阻尼板,地板结构和阻尼板制动方法
    • KR1020160049132A
    • 2016-05-09
    • KR1020140145194
    • 2014-10-24
    • 주식회사 포스코
    • 유영동윤태양이필구
    • E04F15/18E04B1/86
    • E04F15/185B21D13/02E04B1/86E04F15/188E04F15/203E04F19/04
    • 본발명에따른댐핑패널은, 강판으로이루어진패널본체; 및상기패널본체로부터일측및 타측으로돌출되어, 접하는대상물과상기패널본체와의사이에공간부를형성시키되, 상기패널본체의폭 또는길이방향으로이어진배치구조를이루는댐핑부;를포함하며, 상기댐핑부는, 상기패널본체의일측으로돌출된제1 돌출부분; 및상기패널본체의타측으로돌출된제2 돌출부분;을구비하며, 상기제1 돌출부분과제2 돌출부분이서로번갈아배치되면서, 서로이어지거나서로이격된배치구조를이룰수 있다.
    • 本发明涉及阻尼板,地板结构和制造阻尼板的方法。 根据本发明,阻尼板包括:由钢板制成的面板体; 以及阻挡部分,其从所述面板主体突出到一端和另一端,以在接触目标物体与具有在宽度或纵向方向上延伸的布置结构的面板体之间形成空间。 所述阻尼部包括:向所述面板主体的一侧突出的第一突出部; 以及突出到所述面板主体的另一侧的第二突出部,其中所述第一和第二突出部分依次布置以形成彼此连接或间隔开的结构。
    • 48. 发明授权
    • 후긴장 프리캐스트 바닥판이 설치되는 거더교 시공방법
    • 具有向前拉伸预制板的GIRDER BRIDGE的构造方法
    • KR100793158B1
    • 2008-01-10
    • KR1020060132181
    • 2006-12-21
    • 주식회사 포스코재단법인 포항산업과학연구원
    • 김기석윤태양이필구박찬희김진국
    • E01D2/00E01D19/12E01D21/00
    • E01D2/00E01D19/12E01D21/00
    • A construction method of a girder bridge with a later-tension precast floor slab is provided to manage the girder bridge effectively by introducing compression stress to the precast floor slab and controlling the tensile crack generation. A concrete(C) is poured on an abdomen of a negative moment part girder. A positive moment part girder and the negative moment part girder are continuously placed on a pier(500). A precast floor slab(300) laid with sheath pipes is mounted on the negative moment part girder. Non-attached steel wires(330) are inserted in the sheath pipe and then tensed to apply compression force to the precast floor slab. The concrete is poured and hardened between the upper and abdomen parts of the positive moment part girder and on the connected parts between the positive and negative moment part girders.
    • 提供了一种具有较高张力的预制地板的梁桥施工方法,通过向预制地板施加压缩应力并有效控制拉伸裂缝的产生,有效地对梁桥进行了管理。 将混凝土(C)倒在负矩部分梁的腹部上。 正时矩部分梁和负矩部分梁连续放置在码头(500)上。 铺设有护套管的预制地板(300)安装在负弯矩部分梁上。 将非附着钢丝(330)插入护套管中,然后拉紧以对预制地板施加压力。 混凝土在正向力矩梁的上部和腹部之间以及正向和反向力矩部件梁之间的连接部分上倾倒并硬化。