    • 11. 发明申请
    • DOWNHOLE GAS SEPARATOR
    • 井下气分离器
    • WO2015038331A1
    • 2015-03-19
    • PCT/US2014/052810
    • 2014-08-27
    • THRU TUBING SOLUTIONS, INC.
    • SCHULTZ, Roger
    • E21B43/34E21B43/38
    • E21B43/34E21B21/002E21B21/067E21B47/00E21B49/005
    • The disclosure is directed toward a downhole tool for separating fluids into a liquid and a gas component. The downhole tool includes an inlet for receiving a multiphase fluid, the multiphase fluid comprising a gas component and a liquid component. The tool also includes a hydrocyclone portion where the flow of the multiphase fluid is vortical and the liquid component migrates to an inner surface of the hydrocyclone portion and the gas component is forced to a central area of the hydrocyclone portion and exits the downhole tool via a gas outlet. The tool further includes a liquid outlet permitting the liquid component to exit the downhole tool.
    • 本公开涉及用于将流体分离成液体和气体组分的井下工具。 所述井下工具包括用于接收多相流体的入口,所述多相流体包括气体组分和液体组分。 该工具还包括水力旋流器部分,其中多相流体的流动是涡流的,并且液体组分迁移到水力旋流器部分的内表面,并且气体组分被迫到水力旋流器部分的中心区域并且经由 气体出口。 该工具还包括允许液体部件离开井下工具的液体出口。
    • 14. 发明申请
    • CHRISTMAS TREE INSTALLATION USING COILED TUBING INJECTOR
    • 圣诞树安装使用绕线管注射器
    • WO2012082514A2
    • 2012-06-21
    • PCT/US2011/063916
    • 2011-12-08
    • THRU TUBING SOLUTIONS, INC.BRITTON, Mark, S.
    • BRITTON, Mark, S.
    • E21B33/06
    • E21B19/00E21B19/02E21B19/22E21B33/02E21B33/03E21B33/04
    • A method and system for installing a Christmas tree in place of a blowout preventer on a wellhead. The donut in the wellhead BOP is landed using a coiled tubing injector. Then the wellhead BOP then is removed and the Christmas tree is installed also using the same crane that supported the coiled tubing injector. This employs the coiled tubing rig already in use at the well site for a previous operation, such as plug drilling or perforating and fracturing. Notably, the system provides a second seal, such as a ceramic disk, below the donut, for added safety while the Christmas tree is installed. The tool string used to install the donut includes a safety union so that the tool string can be disconnected after the donut is landed and locked into place.
    • 一种用于安装圣诞树而不是井口防喷器的方法和系统。 井口BOP中的甜甜圈使用连续油管注射器着陆。 然后,井口BOP被移除,圣诞树也安装了同样的起重机,该起重机支撑着连续油管喷油器。 这使用已经在井场使用的连续油管钻机用于先前的操作,例如塞子钻孔或穿孔和压裂。 值得注意的是,在安装圣诞树的同时,该系统提供了一个第二密封,例如一个陶瓷盘,可以在甜甜圈下面增加安全性。 用于安装甜甜圈的工具串包括一个安全联合,以便在甜甜圈降落并锁定到位后可以断开工具串。
    • 19. 发明申请
    • WELL COMPLETION
    • 好完成
    • WO2016081263A1
    • 2016-05-26
    • PCT/US2015/060280
    • 2015-11-12
    • THRU TUBING SOLUTIONS, INC.
    • FERGUSON, Andrew, M.LOVING, Stanley, W.SCHULTZ, Roger, L.BRITTON, Mark, S.WATSON, Brock, W.
    • E21B43/16E21B43/26E21B23/00
    • E21B43/261E21B33/138E21B43/14
    • A well completion method can comprise, in a single trip into a wellbore, the following steps being performed for each of multiple zones penetrated by the wellbore: abrasively perforating the zone with a tubing deployed perforating assembly, fracturing the perforated zone with flow from surface via a well annulus, and then plugging the fractured zone with a removable plug substance, the perforating assembly displacing in the wellbore while the fractured zone is being plugged. Another well completion method can comprise, in a single trip into a wellbore, the following steps being performed for each of multiple zones penetrated by the wellbore: perforating the zone using an abrasive perforator, then displacing the perforator in the wellbore away from the earth's surface, then fracturing the zone, and plugging the fractured zone with a flowable plug substance.
    • 完井方法可以包括在进入井眼的单次行程中,对由井眼穿透的多个区域中的每一个进行以下步骤:用配置有穿孔组件的管道对该区域进行磨损性穿孔, 井环,然后用可移除的塞子物质堵塞断裂区域,穿孔组件在断裂区域被堵塞的同时在井筒中移位。 另一个完井方法可以包括在单次进入井筒之后,对由井筒穿透的多个区域中的每一个进行以下步骤:使用磨料穿孔器对该区域进行穿孔,然后将井筒中的穿孔器移离地球表面 ,然后压裂区域,并用可流动的塞子物质堵塞断裂区域。
    • 20. 发明申请
    • WELL TOOL WITH INDEXING DEVICE
    • 具有索引设备的工具
    • WO2016068882A1
    • 2016-05-06
    • PCT/US2014/062651
    • 2014-10-28
    • THRU TUBING SOLUTIONS, INC.
    • WATSON, Brock, W.
    • E21B17/00E21B23/00
    • E21B33/1291E21B23/006
    • A well tool can include an operator device with an operator profile and at least two routes, and an indexing device with a cam and a cam follower including a structure. The structure engages the routes in succession in response to relative displacement between the operator profile and cam. A method can include causing relative displacement between an operator device and an indexing device in one direction, thereby causing a structure to disengage from one route of the operator device and displace an initial distance between two routes in response to engagement between the cam follower and a cam, and causing relative displacement between the operator and indexing devices in an opposite direction, thereby causing the structure to displace a remaining distance between the routes in response to engagement between the cam follower and an operator profile of the operator device, and to displace along the second route.
    • 良好的工具可以包括具有操作者轮廓和至少两个路线的操作装置,以及具有凸轮和凸轮从动件的分度装置,所述凸轮跟随器包括结构。 响应于操作者轮廓和凸轮之间的相对位移,结构连续地接合路线。 一种方法可以包括在一个方向上引起操作者装置和分度装置之间的相对位移,从而导致结构与操作装置的一个路径脱离,并响应于凸轮从动件和一个 凸轮,并且在相反方向上引起操作者和分度装置之间的相对位移,从而导致结构响应于凸轮从动件和操作者装置的操作者轮廓之间的接合而移动路线之间的剩余距离,并且沿着 第二条路线。