会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 119. 发明申请
    • LEAKAGE POSITION CALCULATION DEVICE, LEAKAGE POSITION CALCULATION METHOD, COMPUTER-READABLE RECORDING MEDIUM, VIBRATION CALCULATION DEVICE, AND COMPUTATION DEVICE
    • 泄漏位置计算装置,泄漏位置计算方法,计算机可读记录介质,振动计算装置和计算装置
    • US20160290886A1
    • 2016-10-06
    • US15034909
    • 2014-10-20
    • NEC Corporation
    • Soichiro TAKATAShigeru KASAI
    • G01M3/00G01M7/02
    • G01M3/00G01M3/243G01M7/025
    • The present invention reduces production costs associated with a device that uses results of detection by a plurality of vibration detectors to detect a leakage position in a pipe.A first time difference calculation unit 114 calculates a time difference Δt1 between the timing of detection of vibration that indicates the first vibration mode of a pipe P and the timing of detection of vibration that indicates a second vibration mode of the pipe P by processing a result of a measurement made by a first vibration detection unit 112. A second time difference calculation unit 124 calculates a time difference Δt2 between the timing of detection of vibration that indicates the first vibration mode of the pipe P and the timing of detection of vibration that indicates the second vibration mode of the pipe P by processing a result of a measurement made by a second vibration detection unit 122. A leakage position calculation unit 130 uses the time differences Δt1, Δt2, and a space interval I between the first vibration detection unit 112 and the first time difference calculation unit 114 to calculate a leakage position in the pipe P.
    • 第一时间差计算单元114通过处理结果来计算表示管P的第一振动模式的振动的检测定时与表示管P的第二振动模式的振动的检测定时之间的时间差Δt1 由第一振动检测单元112进行的测量。第二时间差计算单元124计算表示管P的第一振动模式的振动的检测定时和指示振动的检测定时的时间差Δt2 通过处理由第二振动检测单元122进行的测量的结果,管道P的第二振动模式。泄漏位置计算单元130使用时间差Δt1,Δt2和第一振动检测单元112之间的间隔I 和第一时间差计算单元114,以计算管道P中的泄漏位置。