会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 91. 发明申请
    • ARRANGEMENT AND METHOD FOR ALIGNING GUIDE RAILS IN AN ELEVATOR SHAFT
    • 用于在电梯轴中对准导轨的布置和方法
    • US20160311658A1
    • 2016-10-27
    • US15090021
    • 2016-04-04
    • KONE Corporation
    • Pekka KILPELÄINEN
    • B66B19/00B66B7/02
    • B66B19/002B66B7/023
    • An arrangement for aligning guide rails includes an installation platform arranged to be movable in the first direction upwards and downwards in an elevator shaft, said installation platform being provided with an apparatus for aligning guide rails. At least two laser transmitters are arranged at predetermined positions in the shaft below the installation platform, each of said at least two laser transmitters transmitting an upwards directed laser beam that forms a plumb line in the elevator shaft. At least two first position sensitive detectors are attached to the installation platform and/or to the apparatus for aligning guide rails and/or to the guide rails, each of said at least two first position sensitive detectors receiving a respective laser beam, whereby the position of the guide rails in relation to the shaft can be determined indirectly or directly.
    • 用于对准导轨的装置包括安装平台,该安装平台布置成能够在电梯井中沿着第一方向上下移动,所述安装平台设置有用于对准导轨的装置。 在安装平台下方的轴中的预定位置处布置至少两个激光发射器,所述至少两个激光发射器中的每一个传送在电梯井中形成铅垂线的向上定向的激光束。 至少两个第一位置敏感检测器附接到安装平台和/或连接到用于对准导轨和/或导轨的设备,所述至少两个第一位置敏感检测器中的每一个接收相应的激光束,由此位置 可以间接地或直接地确定导轨相对于轴。
    • 92. 发明申请
    • ELEVATOR REFURBISHING METHOD
    • 电梯修复方法
    • US20150336771A1
    • 2015-11-26
    • US14761199
    • 2013-03-04
    • Kazuhiro YOSHIKAWAHideki MIYAHARAKazuhiro SASAKIYoshinao TAKAHASHI
    • Kazuhiro YOSHIKAWAHideki MIYAHARAKazuhiro SASAKIYoshinao TAKAHASHI
    • B66B19/00
    • B66B19/007B66B19/002B66B19/005
    • In an elevator refurbishing method in which a hydraulic elevator in which a hydraulic jack is installed in an equipment installation zone is refurbished into a machine-roomless elevator that uses a two-to-one (2:1) roping method, the equipment installation zone being a region inside a hoistway on either a left side or a right side of a car when viewed from directly above, at least one guide rail from a pair of counterweight guide rails is installed in the equipment installation zone while leaving the hydraulic jack in position, the hydraulic jack is removed from the hoistway, the hoisting machine is installed in a lower portion of the equipment installation zone using a space that is created by removal of the hydraulic jack, and a car return sheave and a counterweight return sheave are installed on an upper portion of the counterweight guide rails.
    • 在其中将液压千斤顶安装在设备安装区域中的液压升降机被翻新到使用二对一(2:1)绳索方式的无机房电梯的电梯翻新方法中,设备安装区 当从正上方观察时,作为轿厢的左侧或右侧的井道内的区域,从一对配重导轨的至少一个导轨安装在设备安装区域中,同时使液压千斤顶保持就位 液压千斤顶从井道中取出,曳引机使用通过拆卸液压千斤顶而产生的空间安装在设备安装区的下部,并将汽车返回滑轮和配重返回滑轮安装在 配重导轨的上部。
    • 93. 发明申请
    • METHOD AND MOUNTING SYSTEM FOR MOUNTING LIFT COMPONENTS
    • 安装提升组件的方法和安装系统
    • US20150107186A1
    • 2015-04-23
    • US14407154
    • 2013-06-05
    • THYSSENKRUPP ELEVATOR AG
    • Hermann WiltsMartin MaderaMichael NeumeierHolger Zerelles
    • B66B19/00E04G3/28E04G3/24
    • B66B19/002E04G3/246E04G3/28E04G2003/286
    • The present disclosure relates to a method for mounting lift components of a lift system in a vertical shaft of a building with the aid of a mounting system which can be moved in the shaft, wherein the lift system has at least one cage which can travel along guide rails in the shaft. In order to develop the method to achieve shorter fitting times and less dependency upon how advanced the construction of the building is, according to the invention a mounting system is positioned in the shaft, having a support platform and a mounting platform, which are disposed one above the other, and having a lifting and pulling device, the support platform and the mounting platform being alternately fixed in position in the shaft and the platform which is not fixed in position at any one time is displaced in the vertical direction by means of the lifting and pulling device relative to the platform fixed in position. In addition, the invention relates to a mounting system for carrying out the method.
    • 本公开涉及一种借助于可以在轴中移动的安装系统来将升降机系统的提升部件安装在建筑物的垂直轴中的方法,其中,升降系统具有至少一个能够沿着行进的保持架 轴中的导轨。 为了开发该方法以实现更短的装配时间,并且对建筑物的高级化依赖性较小,根据本发明,安装系统位于轴中,具有支撑平台和安装平台 并且具有提升牵引装置,所述支撑平台和所述安装平台交替地固定在所述轴中的位置,并且在任何时刻不固定就位的所述平台通过所述竖直方向在所述垂直方向上移位 升降装置相对于平台固定就位。 此外,本发明涉及一种用于执行该方法的安装系统。
    • 94. 发明申请
    • METHOD AND DEVICE FOR INSTALLING AN ELEVATOR IN AN ELEVATOR SHAFT
    • 用于在电梯轴中安装电梯的方法和装置
    • US20130036598A1
    • 2013-02-14
    • US13643848
    • 2011-04-08
    • Stefano Menchini
    • Stefano Menchini
    • B23P11/00G01C15/00
    • B66B19/002Y10T29/49895
    • The invention relates to a method and device for installing an elevator in an elevator shaft, having the following steps: i) arranging a model in the elevator shaft, so that the arranged model represents nominal dimensions of an outline of the elevator; ii) arranging at least one light source at a nominal position of the model, so that the light source is directed in a provided travel direction of the elevator; iii) projecting a light beam starting from the light source, wherein the light beam defines the nominal position along the provided travel direction in the elevator shaft; and iv) using information about at least one location of at least one projection point of the light beam in the elevator shaft for installing the elevator.
    • 本发明涉及一种用于在电梯井中安装电梯的方法和装置,具有以下步骤:i)在电梯井中布置模型,使得所布置的模型表示电梯轮廓的标称尺寸; ii)将至少一个光源布置在模型的标称位置处,使得光源被引导到所提供的电梯行进方向; iii)投射从光源开始的光束,其中光束在电梯井中沿着所提供的行进方向限定标称位置; 以及iv)使用关于电梯井中的光束的至少一个投影点的至少一个位置的信息来安装电梯。
    • 97. 发明申请
    • METHOD AND SYSTEM FOR INSTALLING THE GUIDE RAILS OF AN ELEVATOR AND USE OF THE SYSTEM IN INSTALLING THE GUIDE RAILS OF AN ELEVATOR
    • 用于安装电梯导轨的系统和系统用于安装电梯导轨的方法和系统
    • US20090266651A1
    • 2009-10-29
    • US12434301
    • 2009-05-01
    • Gert VAN DER MEIJDENJos VAN DEN HEUVEL
    • Gert VAN DER MEIJDENJos VAN DEN HEUVEL
    • B66B7/02B66B11/00
    • B66B19/002B66B19/00
    • Method and system for installing guide rails (1), such as the car guide rails and/or the counterweight guide rails, on the vertical wall (3) of the elevator shaft (2) of a building, in which method the guide rail (1) is installed by assembly in phases from the bottom upwards by placing guide rail sections (41, 42, 43, 44 . . . ) that are shorter than the whole length of the guide rail one on top of the other, and by fixing the guide rail sections to the vertical wall (3) with guide rail fixings (5). The alignment of each lower guide rail section that is already installed and fixed is used as a comparison point for the alignment of the next upper guide rail section to be installed above it, such that each upper guide rail section is installed in alignment with each consecutive lower guide rail section that is already installed. The system likewise comprises means for using the alignment of each lower guide rail section that is already installed and fixed as a comparison point for the alignment of the next upper guide rail section to be installed above it, such that each upper guide rail section is installed in alignment with each consecutive lower guide rail section that is already installed. The system is used preferably in installing the guide rails of a tower building. Similarly, its use is advantageous in installing guide rails with the jump lift technique.
    • 在建筑物的电梯井道(2)的垂直壁(3)上安装诸如轿厢导轨和/或配重导轨的导轨(1)的方法和系统,其中,导轨 1)通过将导轨部分(41,42,43,44。)布置成比导轨的整个长度一个放在另一个顶部上,并且通过固定 导轨部分到具有导轨固定件(5)的垂直壁(3)。 已经安装和固定的每个下导轨部分的对准被用作用于对准要安装在其上的下一个上导轨部分的比较点,使得每个上导轨部分安装成与每个连续的对准 已经安装的下导轨部分。 该系统同样包括用于将已经安装和固定的每个下导轨部分对准的装置作为要安装在其上方的下一个上导轨部分对准的比较点,使得每个上导轨部分安装 与已经安装的每个连续的下导轨部分对准。 该系统优选地用于安装塔楼的导轨。 类似地,其使用在使用跳跃提升技术安装导轨方面是有利的。
    • 98. 发明申请
    • METHOD FOR INSTALLING THE GUIDE RAILS OF AN ELEVATOR AND SYSTEM FOR INSTALLING THE GUIDE RAILS OF AN ELEVATOR
    • 用于安装电梯的导轨的方法和用于安装电梯的导轨的系统
    • US20090120734A1
    • 2009-05-14
    • US12276252
    • 2008-11-21
    • Hakan BARNEMANOsmo Bjorni
    • Hakan BARNEMANOsmo Bjorni
    • B66B7/02
    • B66B19/002
    • Method and system for installing the guide rails (1, 2), such as the car guide rails and/or counterweight guide rails, in an elevator shaft (3). The guide rails are installed by assembly in phases starting from the bottom (4) of the elevator shaft by placing one on top of the other guide rail sections (51, 52; 61, 62; 71, 72 . . . ) that are shorter than the whole length of the guide rail and by aligning the guide rail sections perpendicularly by means of the laser beam produced by a direction laser (8). The direction laser (8) is moved upwards along with progressive assembly of the guide rail. As assembly progresses the direction laser (8) is supported in the proximity of the top end of the topmost vertically aligned guide rail section at the time for aligning the next guide rail section to be installed in the vertical direction. These phases are repeated until the entire guide rail is assembled. The system comprises an alignment appliance (12), which can be supported against a guide rail section and fixed to it by means of a permanent magnet (20). In addition the alignment appliance contains an aligning element (13), at which the laser beam produced by the direction laser can be directed.
    • 在电梯井道(3)中安装诸如轿厢导轨和/或对重导轨的导轨(1,2)的方法和系统。 导轨通过在电梯井的底部(4)开始的相位组装安装,将一个放置在较短的另一个导轨部分(51,52; 61,62; 71,72 ...)的顶部, 并且通过由方向激光器(8)产生的激光束垂直地对准导轨部分。 方向激光器(8)随着导轨的逐步组装而向上移动。 随着组件的进行,激光器(8)在最上方垂直排列的导轨部分的顶端附近被支撑在对准在垂直方向安装的下一个导轨部分的时间。 重复这些阶段,直到整个导轨组装好。 该系统包括对准装置(12),其可以被支撑在导轨部分上并且通过永磁体(20)固定到导轨部分上。 另外,对准装置还包括一个对准元件(13),由该方向激光器产生的激光束可被定向在该元件上。