会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 91. 发明专利
    • Magnetic agitation horizontal position welding
    • 磁力搅拌水平位置焊接
    • JPS6117372A
    • 1986-01-25
    • JP13783084
    • 1984-07-03
    • Mitsubishi Heavy Ind Ltd
    • WADA KOUICHITANAKA KISABUROUMINAMI NAGIOWAKAMOTO IKUO
    • B23K9/08B23K9/16B23K9/173
    • B23K9/08
    • PURPOSE:To prevent molten metal from drooping from a groove by allowing magnetic force having specified directivity to act on welding current at the time of horizontal position welding and allowing upward force to act on molten metal in the molten pool by electromagnetic induction between the two. CONSTITUTION:Welding current is led flow between a base metal 1 having a groove in horizontal position and energizing tip 11 to generate an arc 18 between the tip of a welding wire 12 and the base metal 1, and a molten pool is formed by melting of the welding wire 12. In this case, a core of magnetic body 15 is placed outside of the energizing tip 11 through an insulator 14, and a coil 16 is wound on it, and current is applied from a power source 17. A magnetic field 21 of the direction shown by the arrow mark is generated by the current, and moving force according to Fleming's left-hand rule is made to act on molten meta in the molten pool 30 by welding current 22. A magnetic field generated by current from a power source 17 is made to alternating field, and upward force 30 is made to act on the molten metal to prevent it from drooping from a groove. Thus, weld metal free from defective welding is formed.
    • 目的:通过在水平位置焊接时允许具有指定方向性的磁力作用于焊接电流,并允许向上的力通过两者之间的电磁感应在熔池中对熔融金属作用,防止熔融金属从凹槽下垂。 构成:在具有水平位置的凹槽的基底金属1和激励尖端11之间的焊接电流被引导流动,以在焊丝12的顶端和基底金属1之间产生电弧18,并且通过熔化 在这种情况下,磁体15的芯通过绝缘体14放置在激励尖端11的外部,并且线圈16被卷绕在其上,并且从电源17施加电流。磁场 由箭头标记所示的方向21的21由电流产生,并且根据Fleming的左手规则的移动力通过焊接电流22作用在熔池30中的熔融元件上。由来自 动力源17被制成交变场,向上的力30作用在熔融金属上,防止其从凹槽中下垂。 因此,形成没有焊接缺陷的焊接金属。
    • 92. 发明专利
    • Pulse arc welding
    • 脉冲弧焊
    • JPS6117369A
    • 1986-01-25
    • JP13632584
    • 1984-06-30
    • Mitsubishi Heavy Ind LtdRyomei Eng Corp Ltd
    • WADA KOUICHIMANABE YUKIOMINAMI NAGIOKIKOU HIDEKI
    • B23K9/16B23K9/09B23K9/173
    • B23K9/091
    • PURPOSE:To perform stable welding that generates little spatter in consumable electrode type gas shielded arc welding by using an arc current pulse current consisting of main pulse current and sub-pulse current. CONSTITUTION:When a base metal to be welded 18 by generating an arc 17 between a consumable welding wire 16 in welding torch 15 and a base metal to be welded 16 under the presence of shielding gas, welding current is set to pulse current constituted of current values 6, 7, 8. In this case, current generating devices 3, 4, 5 are switched by a time 2 to be times 9, 10, 11, 12 to obtain pulse current having main pulse 13 and sub-pulse 14 of smaller current than the main pulse. A droplet is formed at the end of the welding wire by the main pulse current 13, and the droplet is separated from the tip of the wire 16 to a molten pool by the sub-pulse 14. Thus, stable consumable electrode type gas ghielded welding that generates little spatter can be performed.
    • 目的:通过使用由主脉冲电流和次脉冲电流组成的电弧电流脉冲电流,进行消耗电极式气体保护电弧焊接中几乎没有飞溅的稳定焊接。 构成:通过在保护气体的存在下在焊炬15中的可消耗焊丝16与要被焊接的贱金属16之间产生电弧17来焊接母材,焊接电流被设定为由电流构成的脉冲电流 在这种情况下,电流产生装置3,4,5被切换时间2为9,10,11,12,以获得具有较小的主脉冲13和子脉冲14的脉冲电流 电流比主脉冲。 通过主脉冲电流13在​​焊丝的端部形成液滴,并且通过副脉冲14将液滴从电线16的尖端分离到熔池。因此,稳定的可消耗电极型气体电镀焊接 可以执行几乎没有飞溅的飞溅。
    • 93. 发明专利
    • Continuous joining method of high-temperature thick steel plates
    • 高温厚钢板的连续加工方法
    • JPS60213383A
    • 1985-10-25
    • JP6993784
    • 1984-04-10
    • Mitsubishi Heavy Ind Ltd
    • YOSHIDA YASUYUKIWAKAMOTO IKUOMINAMI NAGIOMIYAGUCHI TADAHISA
    • B21B1/22B21B1/26B23K20/04
    • B23K20/04
    • PURPOSE:To improve productivity in rolling operation by pouring a high-temp. molten steel into the space formed of the ends of preceding and succeeding billets and copper straps and cooling said steel to solidify on a heat resistant traveling belt then subjecting the billets to continuous rolling. CONSTITUTION:A clearance W is maintained between the high-temp. billets 1 and 2 on the heat resistant traveling belt 8 and the apertures on both sides in the transverse direction are closed by water-cooled copper straps. The molten steel 3 is poured from a vessel 7 for the molten steel into the space formed of the rear end of the preceding billet 1, the front end of the succeeding billet 2 and the copper straps. The vessel 7 is removed upon completion of pouring. The billets 1, 2 are transferred on the belt 8 and the molten metal 3 cools to solidify, thus forming a joint layer 4. The billets 1, 2 joined via the layer 4 are conducted to rolling rolls by the belt 8 and are successively rolled to a product. Since the joining is completed simply by pouring and cooling of the molten steel, the productivity in the rolling operation is improved.
    • 目的:通过浇注高温提高轧制操作的生产率。 将钢水进入由前后的坯料和铜带的端部形成的空间中,并使所述钢冷却在耐热行进带上,然后使坯料连续轧制。 构成:在高温下保持间隙W。 耐热行进带8上的坯料1和2以及横向两侧的孔由水冷铜带封闭。 将钢水3从用于钢水的容器7倒入由前一坯料1的后端,后续坯料2的前端和铜带形成的空间中。 完成浇注后取出容器7。 钢带1,2转移到带8上,熔融金属3冷却固化,形成接合层4.经由层4接合的坯料1,2通过带8传送到轧辊,并连续轧制 到一个产品。 由于仅通过浇注和冷却钢水来完成接合,所以提高了轧制操作的生产率。
    • 94. 发明专利
    • Joining method of thick-walled steel material
    • 厚壁钢材的加工方法
    • JPS60196281A
    • 1985-10-04
    • JP4925584
    • 1984-03-16
    • Mitsubishi Heavy Ind Ltd
    • YOSHIDA YASUYUKIWAKAMOTO IKUOMINAMI NAGIOMIYAGUCHI TADAHISA
    • B21B1/22B21B1/26B21B15/00B23K20/04
    • B23K20/04B21B15/0085
    • PURPOSE:To join continuously thick-walled steel materials with high efficiency by forming respectively a sloped recess and sloped projecting part to both ends of the thick-walled steel materials, fitting and coupling the recess and projecting part and hot rolling the fitted and coupled parts thereby pressure welding said parts. CONSTITUTION:The rear end of preceding slab 11 and the front end of a succeeding slab 12 which slabs are thick-walled steel materials are sloped to the angle alpha at which the ends can engage with each other. A recessed dovetail groove A is formed to the rear end of the slab 11 in the transverse direction thereof and a projecting dovetail B engaging with the groove A is formed to the front end of the slab 12. The slopes of the slab 11 and the slab 12 are mated with each other to fit the groove A and the dovetail B to the state of preventing fluctuation in the thickness. While the top and bottom surfaces of the plates 11, 12 are supported by plural guide rollers 13 in a way as to avoid disengagement of the juncture therebetween, the plates are rolled by rolling rolls 13 to roll and join the fitted joint surfaces. The thick-walled steel materials are joined by making successively the above-mentioned operation by which productivity is improved.
    • 目的:通过在厚壁钢材的两端分别形成一个倾斜的凹槽和倾斜的突出部分,通过在凹槽和突出部分的两端分别形成一个连接的厚壁钢材,并将其安装和连接在一起 从而对所述部件进行压焊。 构成:前面的板坯11的后端和板坯是厚壁钢材料的后续板坯12的前端倾斜到端部可以彼此接合的角度α。 在板坯11的横向方向上的后端形成有凹入的燕尾槽A,并且在板坯12的前端形成有与槽A接合的突出的燕尾形B.板坯11和板坯 12彼此配合以将槽A和燕尾B配合到防止厚度波动的状态。 而板11,12的顶表面和底表面以多个引导辊13的方式被支撑,以避免它们之间的接合部分脱开,由滚轧辊13滚压并接合装配的接合表面。 通过连续地进行上述提高生产率的操作来连接厚壁钢材料。
    • 97. 发明专利
    • PRODUCTION OF LARGE-SIZED STEEL MATERIAL
    • JPS6044190A
    • 1985-03-09
    • JP15245383
    • 1983-08-23
    • MITSUBISHI HEAVY IND LTD
    • TANAKA KISABUROUHIROMOTO NOBUMIMINAMI NAGIONAKANO TSUNEO
    • B23K25/00
    • PURPOSE:To produce easily and quickly a large-sized steel material by partitioning the space formed of a pair of billets faced to each other by gates and subjecting the partitioned space to electroslag welding while cooling the end face of the gate on the non-welding side. CONSTITUTION:A copper plate 19 formed intenally with cooling water passages 18 is disposed to one end face (the space 152 side which is not welded first) of one gate 12 and a heat insulating material 10 is provided between the gate 12 and the plate 19. Plural pieces of hydraulic cylinders 20 are further interposed vertically between the plate 19 and the gate 12 behind said plate. Cooling hoses 17 are thereafter connected to the passages 18 and the supply of water is started; at the same time, plural pieces of consumable nozzle type electrodes provided with welding wires are inserted into the space 151 partitioned by the other end face side of the gate 12 to perform electroslag welding. A molten metal is then gradually accumulated in the space 151 and the gate 12 is heated and melted by the convection of the molten slag which is heated by the current.
    • 98. 发明专利
    • T-joint welding method
    • T型焊接方法
    • JPS5913577A
    • 1984-01-24
    • JP12329982
    • 1982-07-15
    • Mitsubishi Heavy Ind Ltd
    • FUKAYA YASUHIROWAKAMOTO IKUOMINAMI NAGIOOGAWA TATSUYAAOKI MASAHIRO
    • B23K9/02B23K9/08B23K33/00
    • B23K33/00
    • PURPOSE:To execute T-joint welding which forms stably and uniformly a penetration bed on the left and right, by making the end edge of the second member press-contact with the reverse side of a groove-like groove of the first member, generating an arc on the surface side of the groove, and also providing an alternating field. CONSTITUTION:The end edge of the second member 3 is butted so as to be orthogonal to the reverse side of a groove of the first member 1 having a groove-like groove 2, a W electrode 4 and the first member 1 are electrified from a welding power source 5, an arc 6 is generated on the center line Y of the second member 3 on the surface side of the groove 2, and a molten metal 13 is formed by melting a filler rod (omitted in the figure). Also, at the same time, an alternating current is made to flow from a power source 9 to a coil 8 of an enameled copper wire, etc. wound to a torch body 7, protecting a weld from the air by making shield gas 10 of inert gas flow, an alternating field being orthogonal to a welding current is formed, the molten metal 13 is rocked and stirred, and a T-joint weld having a uniform penetration bed is formed on the left and right leg parts by a solidified weld metal 14.
    • 目的:通过使第二构件的端缘与第一构件的槽状槽的反面压接,执行左右均匀地形成贯通床的T形焊接,产生 在槽的表面侧上的弧,并且还提供交变场。 构成:第二构件3的端缘与第一构件1的槽的背面正交,具有槽状槽2,W电极4和第一构件1从一个 焊接电源5,在槽2的表面侧的第二部件3的中心线Y上产生电弧6,通过熔化填充棒(图中省略)形成熔融金属13。 同时,同时,使交流电流从卷绕在炬体7上的漆包铜线等的电源9流向线圈8,通过使保护气体10 惰性气体流动,形成与焊接电流正交的交变场,熔融金属13摇动和搅拌,并且通过凝固的焊接金属在左腿部和右腿部分上形成具有均匀渗透床的T形接头焊缝 14。