会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 91. 发明公开
    • 단열 보드 및 이를 포함하는 액화 천연 가스 저장 탱크
    • 绝缘板和液化天然气储存罐,包括它们
    • KR1020120013248A
    • 2012-02-14
    • KR1020110136626
    • 2011-12-16
    • 삼성중공업 주식회사
    • 방창선채희문김현철
    • B63B25/16F17C3/04B65D90/06B63B3/68
    • PURPOSE: An insulation board and a LNG CCS(Liquefied Natural Gas Cargo Containment System) having the same are provided to support load by a bulkhead forming with high-density polyurethane foam and guarantee insulation property by an insulation unit forming with low-density polyurethane foam. CONSTITUTION: An insulation board comprises an upper insulation member(24), a main secondary barrier(300), and a lower insulation member(42). The upper insulation member is coupled to a primary barrier(100). The main secondary barrier is coupled to the upper insulation member. The lower insulation member is coupled to the main secondary member and installed in an inner hull(1). At least one of the upper and lower insulation members includes a primary barrier(84) and multiple first insulation units(82). The primary barrier divides multiple first spaces. Each first insulation unit is filled into each first space. The primary barrier and the first insulation units are made of same material. Density of the primary barrier is higher than the first insulation unit thereof.
    • 目的:提供一种保温板和LNG CCS(液化天然气货物收容系统),以通过用高密度聚氨酯泡沫塑料形成的隔板支撑载荷,并通过用低密度聚氨酯泡沫形成的绝缘单元保证绝缘性能 。 构成:绝缘板包括上绝缘构件(24),主次级阻挡层(300)和下绝缘构件(42)。 上绝缘构件联接到主屏障(100)。 主次级阻挡件联接到上绝缘构件。 下绝缘构件联接到主次级构件并且安装在内壳体(1)中。 上绝缘构件和下绝缘构件中的至少一个包括主阻挡件(84)和多个第一绝缘单元(82)。 主要屏障分割多个第一个空格。 每个第一绝缘单元被填充到每个第一空间中。 主要屏障和第一绝缘单元由相同的材料制成。 主阻挡层的密度高于其第一绝缘单元。
    • 97. 发明公开
    • 선박의 의장설계를 위한 수치 및 물량 계산 프로그램의통합 시스템 및 방법
    • 图形方法和系统以及使用设计程序设计船舶材料计算量的数量
    • KR1020080026854A
    • 2008-03-26
    • KR1020060091950
    • 2006-09-21
    • 삼성중공업 주식회사
    • 방창선장현숙
    • B63B9/00G06Q50/04G06Q10/06G06F17/50
    • Y02P90/30B63B9/001B63B2241/20G06F17/5095G06Q10/063G06Q50/04
    • A system and a method for integrating programs for calculating figures and material amounts in order to design ships are provided to minimize working errors by using one integrated program in place of conventional plural Excel programs. A method for integrating programs for calculating figures and material amounts comprises the following several steps. A design management unit sets at least one among accommodation design, pipe outfitting design, steel outfitting design, machinery outfitting design and R&D program design wherein the accommodation design is for calculating structure and shape information of a ship, the pipe outfitting design is for connecting devices to one another by using pipe parts as ruled in a process, the steel outfitting design is for designing an anchor, a captive balloon and various pipes, the machinery outfitting design is for designing capacity of a pump and a heat exchange according to shipping service conditions(S2). The design management unit determines whether or not a value is inputted in correspondence with at least one among the accommodation design, the pipe outfitting design, the steel outfitting design, the machinery outfitting design and the R&D program design(S3). The design management unit calculates a design shape of a ship by using the inputted value and the set design program(S7). The design management unit outputs the design shape via an output unit(S9).
    • 提供了一种用于集成用于计算图形和材料量的程序以便设计船舶的系统和方法,以通过使用一个综合程序来代替常规的多个Excel程序来最小化工作错误。 用于集成用于计算图形和材料量的程序的方法包括以下几个步骤。 设计管理单位至少在住宿设计,管道itting装设计,钢itting装设计,机械out装设计和研发方案设计中至少设计一个,其中住宿设计用于计算船舶的结构和形状信息,管道out装设计用于连接装置 通过使用流程中规定的管道部件,钢out装设计用于设计锚杆,捕获气球和各种管道,机械设备设计是根据运输条件设计泵的设计能力和热交换 (S2)。 设计管理单元确定在住宿设计,管道装配设计,钢out装设计,机械装配设计和研发程序设计(S3)中至少有一个输入值。 设计管理单元通过使用输入值和设定的设计程序来计算船舶的设计形状(S7)。 设计管理单元通过输出单元输出设计形状(S9)。
    • 98. 实用新型
    • 액화천연가스 화물창 2차 방벽 압착 장치
    • 液化天然气货物遏制装置
    • KR200432563Y1
    • 2006-12-05
    • KR2020060025223
    • 2006-09-19
    • 삼성중공업 주식회사
    • 이중남조기헌방창선
    • F17C1/12F17C13/00
    • 본 고안은 액화천연가스 2차 방벽 압착 장치에 관한 것이다.
      본 고안에 따른 액화천연가스 2차 방벽 압착 장치는 상하 방향으로 플라이우드 및 스폰지, 고무패드등과 같은 신축성 비금속재료가 순차로 적층 성형되고, 폭 방향의 중앙에서 일정한 이격공간이 형성되도록 좌우로 분리 배치된 분리형 가압판; 상기 이격공간 내에 삽입 장착되어, 상기 분리형 가압판을 좌우로 연결시키는 복수개의 연결부재를 포함하되, 상기 분리형 가압판이 2차 방벽을 가압 시, 상기 연결부재에서 발생된 인위의 이격공차에 의해 상기 분리형 가압판이 유연하게 상기 2차 방벽을 균일 가압할 수 있는 것을 특징으로 한다.
      본 고안에 따르면 허용오차 범위 내의 각종 설치오차가 존재하는 인슐레이션 패널 상부에 균일한 압착력으로 2차 방벽을 부착시킬 수 있게 되어, 화물창으로부터 액화천연가스가 누출되는 사고를 방지할 수 있으며, 더욱 양호한 제품 생산을 통해 제품 경쟁력을 향상시킬 수 있게 된다.
      액화천연가스 화물창, 2차 방벽, 가압판, 연결부재, 경첩