会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 7. 发明申请
    • Elevator down peak sectoring with long call response
    • 电梯下降峰值扇区,呼叫响应长
    • US20060249336A1
    • 2006-11-09
    • US10555531
    • 2003-07-21
    • Zuhair BahjatTheresa Christy
    • Zuhair BahjatTheresa Christy
    • B66B1/20
    • B66B1/20
    • In down peak, floors of the building are divided into sectors (38), empty cars (50) are assigned (63, 64) to the sector and assigned (65) the highest down call in the sector provided the highest down call is above the committable floor of any car already assigned in the sector, or there is no car assigned in the sector. If a car is not full (52), it will be assigned additional calls (56). If there are no calls in the sector below a car sector which is not full, a long calls routine (67) determines if there is a down call (75), that is in danger of becoming a long-waiting call, ahead of a car (69) and if so, assigns that call to the car (76).
    • 在高峰期,建筑物的楼层被划分为扇区(38),空车(50)被分配(63,64)到扇区,并在扇区中分配(65)最高的下行呼叫,只要最高下行呼叫高于 已经分配到该部门的任何车辆的承诺面积,或者该部门没有分配汽车。 如果汽车未满(52),则会分配附加电话(56)。 如果汽车部门下方没有呼叫的呼叫不满,则长时间呼叫例行程序(67)确定是否存在可能成为长时间等待呼叫的下行呼叫(75) 汽车(69),如果是,则将该呼叫分配给汽车(76)。