热词
    • 6. 发明授权
    • 프리캐스트 콘크리트 기둥을 이용한 건축물의 시공방법
    • 使用预制混凝土柱的构造方法
    • KR100937745B1
    • 2010-01-20
    • KR1020090036134
    • 2009-04-24
    • 서울주택도시공사동서 피, 씨, 씨 주식회사한양대학교 산학협력단
    • 김형근강석준정병석기동연강지연정장원박창진노삼영
    • E04B1/30E04B1/18E04B1/38
    • PURPOSE: A construction method of a building using a precast concrete column is provided to secure the continuity of the connection by strengthening the integrity of a column and a beam and to improve the construction efficiency by executing a frame work and a slab work in different layers at the same time. CONSTITUTION: A construction method of a building using a precast concrete column comprises the steps for: installing a precast concrete column(200) in which an installation groove(110) and bar arrangement holes(120,130) are installed in the bottom; inserting the end of the precast concrete beam in the installation groove; connecting the precast concrete column and the precast concrete beam by passing main bars(140) through the bar arrangement holes; additionally arranging auxiliary bars along the precast concrete beam; placing concrete in the installation groove; and additionally placing concrete in the inner part and top part the precast concrete beam.
    • 目的:提供一种使用预制混凝土柱的建筑施工方法,通过强化柱和梁的完整性来确保连接的连续性,并通过执行框架加工和不同层的板坯加工来提高施工效率 与此同时。 构成:使用预制混凝土柱的建筑物的施工方法包括以下步骤:安装预制混凝土柱(200),其中安装槽(110)和杆布置孔(120,130)安装在底部; 将预制混凝土梁的端部插入安装槽中; 通过主杆(140)穿过杆布置孔连接预制混凝土柱和预制混凝土梁; 沿着预制混凝土梁另外安排辅助钢筋; 将混凝土置于安装槽中; 并另外将混凝土置于预制混凝土梁的内部和顶部。
    • 9. 发明公开
    • 무거푸집 기둥과 TSC 합성보의 접합부 연결구조 및 그시공방법
    • 无孔钢管和钢筋连接结构及其构造方法
    • KR1020090093561A
    • 2009-09-02
    • KR1020080019155
    • 2008-02-29
    • 서울주택도시공사명화엔지니어링 주식회사(주)센구조연구소
    • 김형근강지연강석준정병석남순우이창남박선우
    • E04B1/24E04B1/58E04B1/30E04C3/04
    • A junction connection structure between a form-less column and a TSC composite beam and a construction method thereof are provided to improve structural performance because the integrity of the spot where a form-less column and a TSC composite beam are connected is intensified. A junction connection structure between a form-less column and a TSC composite beam comprises a form-less column(100), and plural TSC composite beams(200) which are connected to the circumference of the form-less column. In the form-less column, L-section steels(110) are arranged in each edge thereof and a y-shaped steel plate(120) having a predetermined thickness is welded between the L-section steels. In the center of the form-less columns, where the TCS composite beam is attached, a reinforcement plate for reinforcing the lateral strength of the form-less column is prepared. Joint steel plates(140,160) for connection with the TSC composite beam are prepared outside the form-less column.
    • 提供无形列和TSC复合梁之间的结连接结构及其构造方法,以提高结构性能,因为增强了无形列和TSC复合梁连接的点的完整性。 无形列和TSC复合梁之间的结连接结构包括无形列(100)和连接到无形列圆周的多个TSC复合梁(200)。 在无形列中,在其每个边缘上布置有L型钢(110),并且在L型钢之间焊接具有预定厚度的y形钢板(120)。 在连接TCS复合梁的无形柱的中心,制备用于增强无形柱的横向强度的加强板。 用于与TS​​C复合梁连接的联合钢板(140,160)在无形柱外面制备。
    • 10. 发明公开
    • 무거푸집 공법을 이용한 구조물 시스템
    • 使用形式化方法的建筑系统
    • KR1020090093540A
    • 2009-09-02
    • KR1020080019102
    • 2008-02-29
    • 서울주택도시공사고려대학교 산학협력단
    • 김형근강지연강석준정병석김상대
    • E04B1/16E04B2/86E04C3/293E04G11/02
    • A structural system using a form-less construction method is provided to minimize the work on the site, to facilitate the quality control, to improve precision and productivity of the construction work, and to shorten the construction period remarkably. A structural system using a form-less construction method comprises a composite column(100), a composite beam(200~600) and a composite slab(700). The composite column comprises L-section steels which are vertically placed in the edge, a Y-shaped steel plate which is welded between L-section steels and forms the wall of the composite column, a reinforcement plate which is prepared in the center of the composite column where the composite beam is attached for reinforcing the lateral strength of the composite column, and a connector which is prepared in the outer center of the composite column for connecting the composite beam.
    • 提供一种使用无形式施工方法的结构体系,尽量减少现场工作,促进质量控制,提高施工工作的精度和生产力,并显着缩短施工周期。 使用无形式施工方法的结构体系包括复合柱(100),复合梁(200〜600)和复合板(700)。 复合柱包括垂直放置在边缘中的L型钢,Y形钢板,其在L型钢之间焊接并形成复合柱的壁,加强板在 复合柱,其中复合梁被附接以增强复合柱的横向强度;以及连接器,其准备在复合柱的外部中心中,用于连接复合梁。