基本信息:
- 专利标题: Controller for hybrid construction machine
- 专利标题(中):混合建筑机械控制器
- 申请号:JP2011058688 申请日:2011-03-17
- 公开(公告)号:JP2012193551A 公开(公告)日:2012-10-11
- 发明人: FUSHIMI KAZUNORI , HARA YASUHIKO
- 申请人: Kayaba Ind Co Ltd , カヤバ工業株式会社
- 专利权人: Kayaba Ind Co Ltd,カヤバ工業株式会社
- 当前专利权人: Kayaba Ind Co Ltd,カヤバ工業株式会社
- 优先权: JP2011058688 2011-03-17
- 主分类号: E02F9/20
- IPC分类号: E02F9/20 ; F15B11/02 ; F15B21/14
摘要:
PROBLEM TO BE SOLVED: To enable a stopping processing of a hybrid construction machine after turning an ignition key off.SOLUTION: This controller for the hybrid construction machine includes an internal power supply 260 for supplying power to a CPU 250, a first power supply line 210 and a second power supply line 230 for independently supplying power to the internal power supply 260, a switch 211 provided in the first power supply line 210 and adapted to be on/off when starting/stopping the hybrid construction machine, a voltage monitoring line 220 for inputting a voltage value for the first power supply line 210 to the CPU 250, and a semiconductor switch 232 provided in the second power supply line 230 and adapted to be controlled to be on/off by the CPU 250. The CPU 250 determines the on/off state of the switch 211 based on the voltage value for the first power supply line 210, and turns the semiconductor switch 232 on when determining that the switch 211 is on and also turns the semiconductor switch 232 on after determining that the switch 211 is off.
摘要(中):
要解决的问题:为了在点火钥匙关闭之后能够进行混合动力施工机械的停止处理。 解决方案:用于混合式施工机械的该控制器包括用于向CPU 250供电的内部电源260,用于向内部电源260独立供电的第一电源线210和第二电源线230, 设置在第一电力供给线路210中的开关211,其在启动/停止混合动力建筑机械时适用于开/关;电压监视线路220,用于将第一供电线路210的电压值输入到CPU250;以及 设置在第二电源线230中并适于被CPU 250控制为开/关的半导体开关232.CPU 250基于第一电源的电压值来确定开关211的接通/断开状态 并且在确定开关211接通时使半导体开关232接通,并且在确定开关211断开之后也使半导体开关232接通。 版权所有(C)2013,JPO&INPIT
公开/授权文献:
- JP5806825B2 ハイブリッド建設機械の制御コントローラ 公开/授权日:2015-11-10
信息查询:
EspacenetIPC结构图谱:
E | 固定建筑物 |
--E02 | 水利工程;基础;疏浚 |
----E02F | 挖掘;疏浚 |
------E02F9/00 | 不限于从3/00至7/00内所属的一种挖掘机或疏浚机的部件 |
--------E02F9/20 | .驱动装置;控制装置 |