基本信息:
- 专利标题: 一种基于标尺索股定位架设悬索桥主缆预制平行索股的方法
- 专利标题(英):Method for positioning and erecting suspension bridge main cable prefabricated parallel cable strands based on scale cable strand
- 申请号:CN202010608259.X 申请日:2020-06-30
- 公开(公告)号:CN111705674A 公开(公告)日:2020-09-25
- 发明人: 沈锐利 , 闫勇 , 郑锋利 , 潘济 , 蒋建 , 郝聂冰 , 沈国繁 , 黄小午
- 申请人: 西南交通大学 , 温州瓯江口大桥有限公司 , 中交第二航务工程局有限公司 , 成都云会科技有限公司
- 申请人地址: 四川省成都市高新区西部园区西南交通大学科学技术发展研究院
- 专利权人: 西南交通大学,温州瓯江口大桥有限公司,中交第二航务工程局有限公司,成都云会科技有限公司
- 当前专利权人: 西南交通大学,温州瓯江口大桥有限公司,中交第二航务工程局有限公司,成都云会科技有限公司
- 当前专利权人地址: 四川省成都市高新区西部园区西南交通大学科学技术发展研究院
- 代理机构: 成都盈信专利代理事务所
- 代理人: 崔建中
- 主分类号: E01D21/00
- IPC分类号: E01D21/00 ; E01D19/16 ; G01B5/02
The invention discloses a method for positioning and erecting suspension bridge main cable prefabricated parallel cable strands based on a scale cable strand. The method comprises the following stepsthat: the scale cable strand is installed in a scale cable strand saddle groove base, and a saddle-entering position marking line is marked; the prefabricated parallel cable strands are transversely moved into the prefabricated parallel cable strand saddle groove base, and cable strand discharging marking lines are aligned; the height difference between the midspan position scale strand and the prefabricated parallel strands is measured; according to the height difference, the adjustment amount of the prefabricated parallel cable strands is obtained through catenary numerical solution; an in-saddle positioning mark line is marked according to the adjustment amount by taking the in-saddle position mark line as a reference; and the prefabricated parallel cable strands are transversely movedinto a saddle according to the saddle-entering positioning mark line. High-precision positioning and saddle entering of the prefabricated parallel cable strands are achieved, repeated position adjusting operation after the prefabricated parallel cable strands enter the saddle is avoided, then traction erection and positioning saddle entering of the prefabricated parallel cable strands can be synchronously conducted, and erection construction efficiency is greatly improved.
公开/授权文献:
- CN111705674B 一种基于标尺索股定位架设悬索桥主缆预制平行索股的方法 公开/授权日:2021-03-09
IPC结构图谱:
E | 固定建筑物 |
--E01 | 道路、铁路或桥梁的建筑 |
----E01D | 桥梁 |
------E01D19/00 | 桥梁结构建筑细部 |
--------E01D21/00 | .专用于架设或装配桥梁的方法或设备 |